MANDATORY SERVICE BULLETIN NO. MSB 40NG-064 REV. 3
DIAMOND DA40 · Service Bulletins
Overview
This document is a Mandatory Service Bulletin for the Diamond DA 40 NG aircraft, specifically MSB 40NG-064 Rev. 3. It addresses the replacement of fuel tank connection hoses due to reports of deterioration in certain batches of hoses installed during production and sold as replacement parts.
- Mandatory service bulletin for DA 40 NG aircraft.
- Affected serial numbers range from 40.NC007 to 40.NC053 and 40.N345 to 40.N375.
- Fuel tank connection hoses from specific service center purchases must be replaced.
- Compliance is required at the next 100 flight hours interval check.
- The change in mass and CG is negligible.
- Approximately 16 hours of labor is required for the replacement.
- All work must be performed by certified personnel.
- Completion of work must be recorded in the logbook.
Document
Source
Originally published by regulations.gov. Sprinkle hosts a reference copy with an added summary, specifications and searchable full text.
Document details
- Type ·
- Service Bulletins
- Year ·
- 2025
- File size ·
- 221 KB
- Publisher ·
- regulations.gov
- Language ·
- en
What is the MANDATORY SERVICE BULLETIN NO. MSB 40NG-064 REV. 3?
The MANDATORY SERVICE BULLETIN NO. MSB 40NG-064 REV. 3 is a service bulletins for the DIAMOND DA40, dated 2025.
Where does the MANDATORY SERVICE BULLETIN NO. MSB 40NG-064 REV. 3 come from?
This copy of the MANDATORY SERVICE BULLETIN NO. MSB 40NG-064 REV. 3 was originally published by regulations.gov and is hosted on Sprinkle as a free, searchable reference copy.
What year was the MANDATORY SERVICE BULLETIN NO. MSB 40NG-064 REV. 3 published?
The MANDATORY SERVICE BULLETIN NO. MSB 40NG-064 REV. 3 — the DIAMOND DA40 service bulletins on file — is dated 2025.
Most owners only have the POH. Here's the essential set for the DIAMOND DA40.
- Pilot's Operating Handbook / AFM
- Checklist
- Maintenance Manual
- Parts Catalog (IPC)
- Systems & Wiring
- Service Bulletins on file
- Type Certificate (TCDS)
More DIAMOND DA40manuals & documents
Related documents
- Service Bulletin SB-328-28-553 Revision 1DORNIER 328-100 · Service Bulletins
- SERVICE BULLETIN SB 28-4039, REV. 1Beechcraft G58 Baron · Service Bulletins
- MANDATORY SERVICE BULLETIN MSB 42-136/1 MSB 42NG-078Diamond DA42 NG · Service Bulletins
- PC-24 Service Bulletin Number 28-002PILATUS PC-24 · Service Bulletins
- RECOMMENDED SERVICE BULLETIN RSB 42-139 RSB 42NG-081DIAMOND DA42 TDI · Service Bulletins
In this document
Technical Details
This section outlines the mandatory nature of the bulletin, the affected airplanes, and the reason for the service bulletin, which is the deterioration of fuel tank connection hoses.
Planning Information
Details on material availability, labor effort, and the requirement for certified personnel to perform the work are provided.
Accomplishment/Instructions
Instructions to comply with WI-MSB 40NG-064 and the necessity of replacing the affected hoses.
Remarks
Additional notes on the execution of the service bulletin, including warranty credit and documentation requirements.
Concurrent Documents
No concurrent documents are referenced in this bulletin.
Mass and CG
The document states that the change in mass and center of gravity due to the replacement of hoses is negligible.
Safety notes
- All work must be done by a certified aircraft service station or a certified aircraft maintenance mechanic.
- In case of doubt, contact Diamond Aircraft Industries.
- Pay increased attention to areas with limited access during inspection.
Full document text
© DAI 2024 ALL RIGHTS RESERVED, PROPRIETARY DOCUMENT Internet: diamondaircraft.com Service & Support Portal: partners.diamondaircraft.com Diamond Aircraft Industries MANDATORY SERVICE BULLETIN Model DA 40 NG MSB 40NG-064 Rev. 3 Page 1 of 6 23 January 2025 MANDATORY SERVICE BULLETIN NO. MSB 40NG-064 REV. 3 SUPERSEDES MSB 40NG-064 REV. 2 I TECHNICAL DETAILS I.1 Category Mandatory. I.2 Airplanes Affected Type: DA 40 NG S/N of aircraft equipped with affected parts during production: 40.NC007 through 40.NC053 40.N345 through 40.N375 In addition, all aircraft equipped with fuel tank connection hoses from the service center purchases listed in Section I.11. NOTE: if it cannot be ensured that an airplane is not equipped with fuel tank connection hoses (flexible couplings) originating from one of the service center purchases listed in Section I.11, the fuel tank connection hoses of the airplane must be replaced in accordance with WI-MSB 40NG-064. I.3 Date of Effectivity 23 January 2025 I.4 Time of Compliance At the next 100 flight hours interval check. I.5 Subject Replacement of fuel tank interconnect hose (flexible coupling). ATA code: 28-10 I.6 Reason Diamond Aircraft Industries have received reports of the deterioration of fuel tank connection hoses on DA 40 airplanes in the field. During investigation, it was found that the deteriorated fuel tank connection hoses (flexible couplings) originate from two isolated batches. The affected parts were installed on airplanes during production and were sold as replacement parts from 13-Jul-2017 until 26-Feb-2019. All parts from these two isolated batches need to be replaced. I.7 Concurrent Documents None. © DAI 2024 ALL RIGHTS RESERVED, PROPRIETARY DOCUMENT Internet: diamondaircraft.com Service & Support Portal: partners.diamondaircraft.com Diamond Aircraft Industries MANDATORY SERVICE BULLETIN Model DA 40 NG MSB 40NG-064 Rev. 3 Page 2 of 6 23 January 2025 I.8 Approval The technical content of this document is approved as part of the type design. I.9 Accomplishment/Instructions Comply with WI-MSB 40NG-064, latest effective issue. I.10 Mass (Weight) and CG The change in mass and CG is negligible. I.11 List of Service Center Purchases Containing Fuel Tank Connection Hoses (Flexible Couplings) Invoice Date (DD.MM.YYYY) Form Tracking Number (stated on Form One, Block 4) Work Order/Contract/ Invoice (Stated on Form One, Block 5) Invoice Number 13.07.2017 AJ32479 AS1800568 AI1800543 13.07.2017 AJ32481 AS1800570 AI1800508 17.07.2017 AJ32522 AS1800664 AI1800770 20.07.2017 AJ32659 AS1800918 AI1800812 20.07.2017 AJ32662 AS1800921 AI1800751 21.07.2017 AJ32674 AS1800954 AI1800835 21.07.2017 AJ32678 AS1800961 AI1800750 01.08.2017 AJ32810 AS1801208 AI1801190 01.08.2017 AJ32814 AS1801212 AI1800938 02.08.2017 AJ32840 AS1801264 AI1800975 02.08.2017 AJ32844 AS1801276 AI1801116 07.08.2017 AJ32900 AS1801389 AI1801058 04.08.2017 AJ32920 AS1801449 AI1801128 14.08.2017 SI155487 SH183493 SI155487 16.08.2017 AJ33053 AS1801672 AI1801340 21.08.2017 AJ33123 AS1801801 AI1801499 22.08.2017 AJ33162 AS1801891 AI1801589 © DAI 2024 ALL RIGHTS RESERVED, PROPRIETARY DOCUMENT Internet: diamondaircraft.com Service & Support Portal: partners.diamondaircraft.com Diamond Aircraft Industries MANDATORY SERVICE BULLETIN Model DA 40 NG MSB 40NG-064 Rev. 3 Page 3 of 6 23 January 2025 28.08.2017 AJ33314 AS1802169 AI1801720 30.08.2017 AJ33348 AS1802220 AI1802410 31.08.2017 AJ33392 AS1802292 AI1801837 11.09.2017 AJ33670 AS1802849 AI1802270 13.09.2017 AJ33737 AS1802975 AI1802287 20.09.2017 AJ33934 AS1803313 AI1802730 21.09.2017 AJ33973 AS1803399 AI1802805 25.09.2017 AJ34031 AS1803498 AI1802879 04.10.2017 AJ34384 AS1804142 AI1803454 05.10.2017 AJ34399 AS1804163 AI1803394 11.10.2017 AJ34552 AS1804441 AI1803615 12.10.2017 AJ34567 AS1804466 AI1803680 12.10.2017 AJ34576 AS1804478 AI1803636 19.10.2017 AJ34781 AS1804804 AI1803944 30.10.2017 AJ34980 AS1805146 AI1804232 10.11.2017 AJ35336 AS1805808 AI1804696 10.11.2017 SI157782 SH186890 SI157782 20.11.2017 AJ35553 AS1806219 AI1805415 27.11.2017 SOI071638 SO071548 SOI071638 01.12.2017 AJ35876 AS1806823 AI1805600 05.12.2017 AJ35949 AS1806986 AI1808509 06.12.2017 AJ36018 AS1807105 AI1805881 11.12.2017 AJ36124 AS1807294 AI1806156 12.12.2017 SI158555 SH188052 SI158555 Invoice Date (DD.MM.YYYY) Form Tracking Number (stated on Form One, Block 4) Work Order/Contract/ Invoice (Stated on Form One, Block 5) Invoice Number © DAI 2024 ALL RIGHTS RESERVED, PROPRIETARY DOCUMENT Internet: diamondaircraft.com Service & Support Portal: partners.diamondaircraft.com Diamond Aircraft Industries MANDATORY SERVICE BULLETIN Model DA 40 NG MSB 40NG-064 Rev. 3 Page 4 of 6 23 January 2025 II PLANNING INFORMATION II.1 Material and Availability See WI-MSB 40NG-064, latest effective issue. II.2 Special Tools None. 20.12.2017 AJ36394 AS1807861 AI1806533 05.01.2018 AJ36524 AS1808124 AI1806716 10.01.2018 AJ36637 AS1808343 AI1806846 18.01.2018 AJ36876 AS1808762 AI1807249 19.01.2018 AJ36911 AS1808809 AI1807538 24.01.2018 AJ37033 AS1809023 AI1807421 31.01.2018 SOI071699 SO071429 SOI071699 07.02.2018 AJ37400 AS1809627 AI1808056 07.02.2018 AJ37410 AS1809652 AI1807932 08.02.2018 AJ37452 AS1809731 AI1808129 15.02.2018 SI159885 SH190023 SI159885 27.02.2018 AJ37978 AS1810646 AI1808807 28.03.2018 SI160851 SH191480 SI160851 17.04.2018 ASL0000519 ASI180262 06.06.2018 ASL0000603 ASI180316 30.10.2018 ASL0000828 ASI-18-0119 20.12.2018 SI167964 SH201813 SI167964 26.02.2019 SI169707 SH204271 SI169707 Invoice Date (DD.MM.YYYY) Form Tracking Number (stated on Form One, Block 4) Work Order/Contract/ Invoice (Stated on Form One, Block 5) Invoice Number © DAI 2024 ALL RIGHTS RESERVED, PROPRIETARY DOCUMENT Internet: diamondaircraft.com Service & Support Portal: partners.diamondaircraft.com Diamond Aircraft Industries
Show full textShow less
MANDATORY SERVICE BULLETIN Model DA 40 NG MSB 40NG-064 Rev. 3 Page 5 of 6 23 January 2025 II.3 Labour Effort Approximately 16 hours will be required to accomplish this service bulletin. II.4 Credit Parts and labour for all aircraft within warranty. II.5 Reference Documents DA 40 NG series Airplane Maintenance Manual, Doc. No. 6.02.15, latest effective issue. III REMARKS 1. All work must be done by a certified aircraft service station, or a certified aircraft maintenance mechanic. 2. All work, in particular that which is not especially described in this service bulletin, must be done in accordance with the referenced Maintenance Manual. 3. Completion of all work must be recorded in the logbook. 4. If material and/or labour hours are subject to be credited through Diamond Aircraft Industries, the service bulletin must be done within the time of compliance, and the following documents must be sent to Diamond Aircraft Industries not later than 30 days after completion of work. • Warranty Application • Work Report of the new installed fuel tank connection hoses D4D-2817-10-70_01 • Form One of replaced affected fuel tank connection hoses D4D-2817-10-70, and the Work Report of their installation 5. In case of doubt, contact Diamond Aircraft Industries. © DAI 2024 ALL RIGHTS RESERVED, PROPRIETARY DOCUMENT Internet: diamondaircraft.com Service & Support Portal: partners.diamondaircraft.com Diamond Aircraft Industries MANDATORY SERVICE BULLETIN Model DA 40 NG MSB 40NG-064 Rev. 3 Page 6 of 6 23 January 2025 EXECUTION REPORT TO SERVICE BULLETIN MSB 40NG-064 REV. 3 Please submit the Execution Report through the Diamond Partner Portal at https://partners.diamondaircraft.com/ AIRPLANE DATA Airplane Serial Number Airplane Registration Airplane Operator Hours of Operation Airplane (TSN) Typical operation of airplane private, club, training, other: MAINTENANCE DATA: Inspection carried out on Inspection carried out by During scheduled inspection: Yes No Hoses deteriorated? Yes No Date Name Signature © DAI 2019 ALL RIGHTS RESERVED, PROPRIETARY DOCUMENT Internet: diamondaircraft.com Service & Support Portal: partners.diamondaircraft.com Diamond Aircraft Industries WORK INSTRUCTION Model DA 40 NG WI-MSB 40NG-064 Rev. 0 Page 1 of 4 01 July 2019 WORK INSTRUCTION WI-MSB 40NG-064 REV. 0 I GENERAL INFORMATION I.1 Subject Replacement of fuel tank connection hoses (flexible couplings). I.2 Reference Documents DA 40 NG series Airplane Maintenance Manual, Doc. No. 6.02.15, latest effective issue. I.3 Remarks 1. All work must be done by a certified aircraft service station or a certified aircraft maintenance mechanic. 2. All work, in particular if not described in this work instruction, must be done in accordance with the referenced maintenance manual. 3. For conversion factors between SI units and US/Imperial units, refer to AMM Chapter 02. 4. In case of doubt, contact Diamond Aircraft Industries Inc. II DRAWINGS, SPECIAL TOOLS & MATERIALS II.1 Drawings None. II.2 Special Tools None. II.3 Material Qty Part Number Description 2 D4D-2817-10-70_01 Fuel tank connection hose (flexible coupling) for DA 40 NG 1 D4D-9028-07-02 Check valve filter in fuel transfer line © DAI 2019 ALL RIGHTS RESERVED, PROPRIETARY DOCUMENT Internet: diamondaircraft.com Service & Support Portal: partners.diamondaircraft.com Diamond Aircraft Industries WORK INSTRUCTION Model DA 40 NG WI-MSB 40NG-064 Rev. 0 Page 2 of 4 01 July 2019 III INSTRUCTIONS NOTE: the following images show the difference between the two types of fuel tank connection hoses (flexible couplings) in the field. • D4D-2817-10-70, this fuel tank connection hose has a light blue layer in the cross-section. Only a fraction of these hoses come from the affected two batches. • D4D-2817-10-70_01, this fuel tank connection hose has an all black cross section and is not affected. © DAI 2019 ALL RIGHTS RESERVED, PROPRIETARY DOCUMENT Internet: diamondaircraft.com Service & Support Portal: partners.diamondaircraft.com Diamond Aircraft Industries WORK INSTRUCTION Model DA 40 NG WI-MSB 40NG-064 Rev. 0 Page 3 of 4 01 July 2019 III.1 Replacement of Main Fuel Tank Connection Hoses 1. Remove the main fuel tank assembly from the aircraft in accordance with AMM Chapter 28-10. 2. Disassemble the main fuel tank assembly in accordance with AMM Chapter 28-10. 3. Examine the fuel tank connection hoses for damage, deterioration, and detached rubber parts. 4. If the fuel tank connection hoses are found to be damaged, inspect the fuel tank chambers, and remove detached rubber material in accordance with Section III.2 of this service bulletin. 5. Assemble the main fuel tank assembly with the new fuel tank connection hoses (P/N D4D-2817- 10-70_01) in accordance with AMM Chapter 28-10. 6. Install the main fuel tank assembly in to the aircraft in accordance with AMM Chapter 28-10. 7. Do steps 1 to 6 on the opposite side of the aircraft. 8. Clean working areas, and check for foreign objects. 9. Check all altered, replaced, repaired parts for proper function. 10. Test all systems in working area for proper function. 11. Make all necessary entries in the airplane logs. 12. Fill in the execution report, and send it to Techpubs@diamondair.com. III.2 Inspection of Main Fuel Tank Chambers and Removal of Detached Rubber Parts 1. Examine all fuel tank chambers for detached rubber material. Remove any detached rubber material from the fuel tank chambers. CAUTION: pay increased attention to areas with limited access of the inner chamber of the main fuel tank, especially the area in the fuel trap and the area underneath the fuel trap (sediment trap & drain). NOTE: to improve access and inspectability of these areas, the fuel low level switch, the fuel temperature sensor, and the fuel finger filter can be removed. NOTE: optionally, use a borescope to inspect areas with limited access. 2. If removed during examination of the fuel tank chambers for detached rubber particles: A. Install the fuel low level switch. B. Install the fuel temperature sensor. C. Install the fuel finger filter. 3. Remove, clean, and re-install the fuel gascolator filter in accordance with AMM Chapter 28-20. © DAI 2019 ALL RIGHTS RESERVED, PROPRIETARY DOCUMENT Internet: diamondaircraft.com Service & Support Portal: partners.diamondaircraft.com Diamond Aircraft Industries WORK INSTRUCTION Model DA 40 NG WI-MSB 40NG-064 Rev. 0 Page 4 of 4 01 July 2019 4. Remove and inspect the check valve filter in the fuel transfer line. If the check valve filter is found to be contaminated, replace the check valve. CAUTION: do not disassemble the fuel transfer check valve. Inspect visually. 5. Flush all fuel lines connecting the main fuel tanks to the gascolator with clean fuel.