Reservoir Assembly - Emergency Air (200 cu-in) Component Maintenance Manual
LEARJET 31A · Maintenance Manual
Overview
This document is the Component Maintenance Manual for the Emergency Air Reservoir Assembly used in Learjet 31A aircraft. It provides detailed maintenance and overhaul procedures, technical properties, and an illustrated parts list for the assembly.
- Covers maintenance for Emergency Air Reservoir Assembly P/N M6600194-7.
- Stores pressurized Nitrogen gas for emergency pneumatic power.
- Includes procedures for disassembly, cleaning, repair, and assembly.
- Revised to maintain compliance with ATA 100 and AECMA guidelines.
- Contains confidential and proprietary information.
- MASS Systems provides worldwide product support and overhaul services.
Document
Source
Originally published by ameronglobal.com. Sprinkle hosts a reference copy with an added summary, specifications and searchable full text.
Document details
- Type ·
- Maintenance Manual
- Year ·
- 2010
- File size ·
- 241 KB
- Publisher ·
- ameronglobal.com
- Language ·
- en
Specifications & performance
Extracted from this document.
Specifications
- Weight empty (lb) ·
- 7.10
- Length overall (in) ·
- 9.25
- Burst pressure psig ·
- 9000
- Operating pressure psig ·
- 3000
- Internal volume cubic (in) ·
- 200
- Leakage rate scc per sec ·
- 5 x 10-7
- Ambient temperature range f ·
- -65 to +165
- Relief reseat pressure psig ·
- 3050
- Safety relief pressure psig ·
- 3300 to 3500
- Width diameter over girth (in) ·
- 7.50
- Hydrostatic test pressure psig ·
- 4500
Performance
- Minimum cycles ·
- 10000
- Life limit years ·
- 25
- Hydrostatic test interval years ·
- 5
What is the Reservoir Assembly - Emergency Air (200 cu-in) Component Maintenance Manual?
The Reservoir Assembly - Emergency Air (200 cu-in) Component Maintenance Manual is a maintenance manual for the LEARJET 31A, dated 2010.
Where does the Reservoir Assembly - Emergency Air (200 cu-in) Component Maintenance Manual come from?
This copy of the Reservoir Assembly - Emergency Air (200 cu-in) Component Maintenance Manual was originally published by ameronglobal.com and is hosted on Sprinkle as a free, searchable reference copy.
What year was the Reservoir Assembly - Emergency Air (200 cu-in) Component Maintenance Manual published?
The Reservoir Assembly - Emergency Air (200 cu-in) Component Maintenance Manual — the LEARJET 31A maintenance manual on file — is dated 2010.
Most owners only have the POH. Here's the essential set for the LEARJET 31A.
- Pilot's Operating Handbook / AFM
- Checklist
- Maintenance Manual
- Parts Catalog (IPC)
- Systems & Wiring
- Service Bulletins on file
- Type Certificate (TCDS)
More LEARJET 31Amanuals & documents
Related documents
- Wiring Diagram for Cirrus SR22TCirrus SR22T · Wiring Diagrams
- Alert Service Bulletin No. 071 Combustion Heater P/N CD14048 or CD14048-1 Heater Pressure Decay Test RequirementPiper PA-31 Navajo Chieftain · Service Bulletins
- SERVICE MANUAL AND INSTRUCTIONS FOR CONTINUED AIRWORTHINESS FOR THE WIPAIRE MODEL 8750 AMPHIBIOUS/SEAPLANE FLOAT ON THE CESSNA MODEL 208/208B CARAVANCESSNA CARAVAN 208 FLOATPLANE · Checklist
- FALCON 10 MAINTENANCE MANUALDASSAULT FALCON 10 · Maintenance Manual
- Status Detail ReportGulfstream Aerospace G650 · Maintenance Manual
In this document
Introduction
The manual outlines the scope of maintenance and overhaul procedures for the Emergency Air Reservoir Assembly, including its operation and technical properties.
Description and Operation
Describes the components of the Emergency Air Reservoir Assembly and its function in providing pneumatic power for landing gear operation in emergencies.
Technical Properties
Details specifications such as dimensions, weight, operating pressure, and material properties of the Emergency Air Reservoir Assembly.
General Maintenance and Recharge Service Data
Emphasizes the importance of proper installation, inspection, and maintenance by trained professionals due to the assembly being a pressure vessel.
Record of Revisions
Lists the revision history of the manual, indicating updates and changes made over time.
Table of Contents
Provides an overview of the sections included in the manual, facilitating easy navigation.
Safety notes
- Emergency Air Reservoir Assembly is a pressure vessel and must be handled with care.
- Periodic maintenance is required to ensure proper and safe operation.
- Maintenance should be performed by trained professionals only.
Full document text
MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE T-1 MAR 3/10 REV. 2, APR 13/10 TO: HOLDERS OF THE RESEVOIR ASSEMBLY – EMERGENCY AIR (200 CU-IN) COMPONENT MAINTENANCE MANUAL 52-10-05, DATED APR 8/10. REVISION NO. 2 DATED APR 13/10 HIGHLIGHTS THIS PUBLICATION HAS BEEN REPRINTED IN ITS ENTIRETY. REPLACE ALL PREVIOUSLY ISSUED COPIES OF THE COMPONENT MAINTENANCE MANUAL. The highlights of the revision are outlined below. The pages have been revised and maintain the format of ATA 100 and the AECMA Simplified English guidelines. CHAPTER/SECTION & PAGE NO. DESCRIPTION OF CHANGE EFFECTIVITY Page RR-1 Added revision status and revision date. All models Page LEP-1 Updated revision date. All models Page 3 Revised Airworthiness Limitations & added Note. All models 52-10-05 PAGE T-1 MAR 3/10 REV. 2, APR 13/10 RESERVOIR ASSEMBLY - EMERGENCY AIR (200 CU-IN) P/N M6600194-7 LEARJET SPEC. P/N’s. 6600194-1, -4, -6 COMPONENT MAINTENANCE MANUAL WITH TECHNICAL PROPERTIES AND ILLUSTRATED PARTS LIST MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE T-2 MAR 3/10 REV. 2, APR 13/10 CONFIDENTIALITY NOTICE This document contains confidential and proprietary information, which is the property of MASS Systems, AMETEK Ameron, LLC and shall not be copied or reproduced, in whole or in part, or the contents divulged or used for manufacture, without the specific written permission of MASS Systems, AMETEK Ameron, LLC. Recipient, by acceptance, use, or retention of this document, acknowledges and agrees to the foregoing covenants to maintain the contents in confidence. TECHNICAL DATA EXPORT NOTICE This data is exported to the requirements of the United States Government Export Administration Act of 1969, as amended, and promulgated by the export administration regulations as issued by the U. S. Department of Commerce. The data may not be reproduced and shall not, without the written permission of MASS Systems, AMETEK Ameron, LLC, be used for purposes of manufacture, or shall it be disclosed, re-exported, nor transmitted directly or indirectly from the importing country to any person, government, governmental entity or institution of another foreign government. It is understood and agreed that the use of this data shall be limited to the following purposes: (i) use by Support Service Contractors (except for manufacture), (ii) emergency repair or overhaul work, (iii) receiving inspection of hardware, (iv) evaluation of a bid or proposal. By acknowledgement of receipt of data containing this legend, importer agrees to comply thereto. PMA PARTS NOTICE MASS Systems, AMETEK Ameron, LLC, will provide full warranty on all fire extinguishers provided the component parts used in the repair and overhaul process have formal after market FAA-PMA authority for use on the Emergency Air Reservoir Assembly. MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE RR-1 MAR 3/10 REV. 2, APR 13/10 RECORD OF REVISIONS REV. NO. ISSUE DATE DATE FILED BY REV. NO. ISSUE DATE DATE FILED BY 0 Mar 3/10 Mar 3/10 RG 1 Apr 8/10 Apr 8/10 RG 2 Apr 13/10 Apr 13/10 RG MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE RTR-1 MAR 3/10 REV. 2, APR 13/10 RECORD OF TEMPORARY REVISIONS REVISION NO. PAGE NUMBER ISSUE DATE BY DATE REMOVED BY MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE SBL-1 MAR 3/10 REV. 2, APR 13/10 SERVICE BULLETIN LIST SERVICE BULLETIN ISSUE DATE DATE FILED BY MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE LEP-1 MAR 3/10 REV. 2, APR 13/10 LIST OF EFFECTIVE PAGES Subject Page Date Subject Page Date Title Page T-1 Mar 3/10 Disassembly 301 Mar 3/10 Notices T-2 Mar 3/10 Cleaning 401 Mar 3/10 Record of Revisions RR-1 Mar 3/10 402 Mar 3/10 Record of Temporary RTR-1 Mar 3/10 Check 501 Mar 3/10 Revisions Repair 601 Mar 3/10 Service Bulletin List SBL-1 Mar 3/10 Assembly 701 Mar 3/10 List of Effective Pages LEP-1 Mar 3/10 (Including 702 Mar 3/10 Storage) Table of Contents TC-1 Mar 3/10 Fits and 801 Mar 3/10 Introduction Intro-1 Mar 3/10 Intro-2 Mar 3/10 Special Tools, 901 Mar 3/10 Description and 1 Mar 3/10 Illustrated Parts 1001 Mar 3/10 Operation 2 Apr 8/10 List 1002 Mar 3/10 3 Apr 13/10 1003 Mar 3/10 1004 Mar 3/10 Testing and Fault 101 Mar 3/10 1005 Mar 3/10 Isolation 102 Mar 3/10 1006 Mar 3/10 103 Mar 3/10 104 Mar 3/10 105 Mar 3/10 106 Mar 3/10 107 Mar 3/10 108 Mar 3/10 109 Mar 3/10 MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE TC-1 MAR 3/10 REV. 2, APR 13/10 TABLE OF CONTENTS Introduction ..…....……………………………………………………………. INTRO-1 Description and Operation .….…..……………..……………………………….… 1 Testing and Fault Isolation ..............…….....………… ……...………………….… 101 Disassembly ……………………………………………………………………....... 301 Cleaning ………………………………………………………………………….… 401 Check ………………………………………………………………………….…... 501 Repair ……… …………………………………………………………………....... 601 Assembly (Including Storage) ……….………………………………………........... 701 Fits and Clearances ……………………………………………….………... 801 Special Tools, Fixtures, and Equipment ………... ………………………….……… 901 Illustrated Parts List ……….……………………………………………………. 1001 FIGURES 1 Reservoir Assembly – Emergency Air ……….………………………….. 1 101 Leak Test Setup …..……………………………………………………….. 102 102 Leak Test And Relief Valve Test Setup .……………………………… 105 1001 Emergency Air Reservoir Assembly Exploded View ….……………….. 1004 TABLES 1 Reservoir Assembly - Emergency Air (200 cu-in) ………......…………… 2 101 Test Equipment and Materials ….…………………………………………… 101 102 Test Record ………..………………………………………………………... 109 301 Disassembly Tools ….………….…...……………………………………… 301 401 Cleaning Materials and Equipment ………………………………………… 401 501 Check Tools and Equipment ………………………………………………… 501 601 Repair Tools and Materials ….……………………………………………… 601 701 Assembly Tools and Materials …...………………………………………… 701 702 Storage Materials ….………………………………………………………... 702
Show full textShow less
801 Torque Limits ….……………………………………………………………. 801 901 Special Tools, Fixtures, and Equipment …..………………………………… 901 1001 Reservoir Assembly - Emergency Air (200 cu-in) ………………………... 1005 MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE INTRO-1 MAR 3/10 REV. 2, APR 13/10 INTRODUCTION SCOPE This Component Maintenance Manual covers the maintenance and overhaul procedures for the Emergency Air Reservoir Assembly part number (P/N) M6600194-7, Learjet P/N’s 6600194-1, -4, -6. The Emergency Air Reservoir Assembly stores pressurized Nitrogen gas to assist in emergency pneumatic power capabilities to the aircraft braking and landing gear blowdown and freefall systems. MANUFACTURING ENTITY & PRODUCT SUPPORT MASS Systems 4750 Littlejohn Street Baldwin Park, California 91706 U.S.A. Telephone: 626-337-4640 FAX No: 626-337-1641 service@MASS.AMETEK.com CAGE Code: 0FRR4 In addition to our factory Product Support, Overhaul and Recharge stations are available worldwide. USE MANUAL FOR SPECIFIC FUNCTIONS This manual covers the following topics: Description and Operation, Technical Properties, Testing and Fault Isolation, Disassembly, Cleaning, Check, Repair, Assembly and Storage, Special Tools, Fixtures, and Equipment. Recommended tools, equipment, and materials are listed in each section and in the Special Tools, Fixtures, and Equipment section. Equivalent items may be used. REVISION SERVICE Revised pages will be issued when necessary throughout the service life of the Emergency Air Reservoir Assembly. The revised part of the page will be identified with a change bar or capital R in the left margin. VERIFICATION Testing and Fault Isolation Disassembly Assembly MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE INTRO-2 MAR 3/10 REV. 2, APR 13/10 ABBREVIATIONS AND UNIT SYMBOLS Abbreviations and unit symbols used in this manual are defined below. Amp. Amperes Min Minimum Assy. Assembly mm Millimeter (1 mm = 0.0394-inch) ATA Air Transport Association m3 /hr Cubic meter per hour CAA Civil Aviation Authority N.C. Normally Closed CAGE Commercial and Government Entity Nm Newtonmeter (1 Nm = 8.3 inch-pound) cfh Cubic feet per hour N.O. Normally Open CFR Code of Federal Regulations No. Number cm Centimeter (1 cm = 0.394-inch) OD Outside Diameter DOT Department of Transportation Psig Pounds per square inch–gauge FAA Federal Aviation Administration Rev. Revision GN2 Nitrogen Gas RJA Regional Jet Association ID Inside Diameter rpm Revolutions per minute IPL Illustrated Parts List SB Service Bulletin JAA Joint Aviation Authorities scc/sec Standard cubic-centimeter per second Kg Kilogram (1 kg = 2.205-pounds) TCPS Temperature Compensated Pressure Switch kPag Kilo Pascal-gauge (1 kPag = 0.15-psig) Temp Temperature mA Milliamperes VDC Voltage-Direct Current Max Maximum MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE 1 MAR 3/10 REV. 2, APR 13/10 DESCRIPTION AND OPERATION DESCRIPTION The Emergency Air Reservoir Assembly stores pressurized Nitrogen gas and consist of the following components (see Figure 1): Bottle Weldment (Container) Safety Relief Valve (Relief Valve) Plug (Plug Assembly) The Container is composed of spherical shell halves made of Stainless Steel that are welded at the center thus requiring a girth weld and a port boss that is welded to one of the spherical shell halves. The port boss is plugged by an all aluminum plug that utilizes a Safety Relief Valve with reseating poppet capability. The Container is pressurized at the aircraft level with an inert gas such as nitrogen. The end of the aluminum plug has a flexible dip tube which allow for moisture bleed off regardless of the mounting position of the reservoir on the aircraft. OPERATION In an emergency condition the Emergency Air Reservoir Assembly bypasses the hydraulic system and the reservoir gas pressure is used to lower the landing gear. Reservoir Assembly – Emergency Air Figure 1 MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE 2 MAR 3/10 REV. 2, APR 13/10 TECHNICAL PROPERTIES Reservoir Assembly – Emergency Air (200 cu-in) Table 1 PROPERTY SPECIFICATION Description Part Number M6600194-7 Customer Part Numbers 6600194-1, -4, -6 Nomenclature Reservoir Assembly, Emergency Air Complies with Learjet Specification 6600194 Length, Overall 9.25 inches (23,50 cm) maximum Width, Diameter Over Girth 7.50 inches (19,05 cm) maximum (excluding weld) Properties Internal Volume 200 cubic-inches (3,27 liter) minimum Weight – Empty 7.10 pounds (3,22 kg) maximum Pressurizing Gas Nitrogen (N2 ) per BB-N-411C Pressure Data At 70F (21C) Operating Pressure 3000 psig (20685 kPag) Hydrostatic (Proof) Test Pressure 4500 psig (31028 kPag) Burst Pressure 9000 psig (62055 kPag) minimum Safety Relief Pressure 3300 to 3500-psig (22754 to 24133 kPag) Relief Reseat Pressure 3050 psig (21030 kPag) minimum Leakage Rate 5 x 10-7 scc/second of Helium maximum Ambient Temperature Range -65ºF to +165ºF (-54ºC to +74ºC) Outlet Port Data Thread Size MS33649-4 (0.4375-20 UNJF-3A) Bleed Drain Port Data Thread Size MS33649-2 (0.3125-24 UNJF-3A) Hydrostatic (Proof) Test Interval 5-years recommended Life Limit – 25 years 10,000 cycles minimum GENERAL MAINTENANCE AND RECHARGE SERVICE DATA Emergency Air Reservoir Assembly should be installed, inspected and maintained by trained persons having proper equipment. Emergency Air Reservoir Assembly is a pressure vessel and must be treated with respect and handled with care. They are mechanical devices and require periodic maintenance to be sure that they are ready to operate properly and safely. MASS Systems strongly recommends that the maintenance of Emergency Air Reservoir Assembly be done by a trained professional. MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE 3 MAR 3/10 REV. 2, APR 13/10 MASS Systems, AMETEK, Ameron LLC, makes original factory parts available to insure proper maintenance – use of substitute parts releases MASS Systems of its warranty obligations. MASS Systems parts have machined surfaces and threads that are manufactured to exacting tolerances. O-rings, flexible dip tube, nozzles, and all metal parts meet precise specifications and are subjected to multiple in-house inspections and tests for acceptability. DO NOT SUBSTITUTE PARTS. WARNING: THIS MANUAL IS PUBLISHED AS A GUIDE TO ASSIST SERVICE PERSONNEL IN THE INSPECTION AND MAINTENANCE OF MASS SYSTEMS AMETEK Ameron LLC, EMERGENCY AIR RESERVOIR. NO INSTRUCTION MANUAL CAN ANTICIPATE ALL POSSIBLE MALFUNCTIONS THAT MAY BE ENCOUNTERED IN THE SERVICE OF EMERGENCY AIR RESERVOIR. MASS SYSTEMS AMETEK Ameron LLC, ASSUMES NO LIABILITY FOR SERVICE AND MAINTENANCE OF EMERGENCY AIR RESERVOIR BY PUBLISHING THIS MANUAL. AIRWORTHINESS LIMITATIONS 1. The Reservoir Assembly is used on Learjet Models 24D, 24E, 24F, 25B, 25C, 25D, 25F, 31, 31A, 35, 35A, 36 and 36A aircrafts. 2. Total life limit of the Emergency Air Reservoir shall not exceed twenty five (25) years from manufactured date. 3. The Emergency Air Reservoir shall be subjected to Hydrostatic testing every five (5) years. Units that do not meet the requirement of the Hydrostatic test as defined in this manual shall be replaced irrespective of the total life limit on the unit. 4. Inspection procedures for Hydrostatic, leak test and relief valve test etc. are detailed in this manual 52-10-05. NOTE: "The Airworthiness Limitations Section is FAA approved and specifies maintenance required under 14 CFR 43.16 and 91.404 unless an alternative program has been FAA approved" MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE 101 MAR 3/10 REV. 2, APR 13/10 TESTING AND FAULT ISOLATION TEST EQUIPMENT AND MATERIALS The recommended test equipment and materials are listed in Table 101. Equivalent items may be used. Test Equipment and Materials Table 101 Nomenclature Part or Specification Number Source (CAGE)* Fill Tools --- Commercially available Fitting, Test --- Customer supply Helium Gas (He) 6000 psig (0 to 41370 kPag) Commercially available Hydrostatic (Proof) Test Setup --- DOT approved hydrostatic test facility Leak Detector, Helium HLD 3000 Leybold Inficon, Inc. (56507) Nitrogen Gas (GN2) or Dry Air 6000 psig (0 to 41370 kPag) Commercially available Oven or Heater, 250F (121C) --- Commercially available Hydrostatic Test Plug TL10250-1 MASS Systems (0FRR4) Relief Valve Leak Check Fixture TL10251-1 MASS Systems (0FRR4) Quick-Spot Bubble-Forming Leak Detector Solution MIL-PRF-25567 Commercially available *Refer to the IPL, paragraph 2, for the address. GENERAL 1. Conduct the testing and fault isolation procedures in a clean, well-lighted area. 2. The testing shall be conducted at temperatures between 59ºF to 95ºF (15ºC to 35ºC). 3. The relative humidity shall be 20% to 80%. 4. The atmospheric pressure shall be 28.5 to 30.5 inches Hg. 5. The bottle weldment (35) shall be checked for cleanliness before and after testing. WARNING: THE FOLLOWING SECTION REQUIRES THE USE OF HYDRAULIC/PNEUMATIC HIGH PRESSURE STANDS. ALL SAFETY PRECAUTIONS CONSISTENT WITH PROPER HANDLING OF MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE 102 MAR 3/10 REV. 2, APR 13/10 PRESSURIZED VESSELS USING APPROPRIATE FIXTURES MUST BE TAKEN AT ALL TIMES. CAUTION: BEFORE PROCEEDING ENSURE THAT THE EMERGENCY AIR RESERVOIR IS COMPLETELY DEPRESSURIZED. ALWAYS PRESSURIZE THE TEST CONTAINER USING SAFETY SHIELDS AND OR ENCLOSURES. FAILURE TO COMPLY CAN RESULT IN SEVERE INJURY TO PERSONNEL. NOTE: If Hydrostatic testing is required, always perform Hydrostatic test before doing the leakage test. LEAKAGE TEST – HELIUM METHOD (Weldment) The Emergency Air Reservoir is capped by an aluminum plug that has three (3) MS33649 ports. Two (2) ports are an MS33649-4 (.4375-20 UNJF-3B), while the other is a MS33649-2 (.3125- 24 UNJF-3B) that is utilized for the miniature bleed valve. One (1) of the two (2) MS33649-4 ports is used for the Safety Relief Valve while the other port is connected at the aircraft level. During the Weldment Leakage check the Plug (20) must be removed and replaced with the Hydrostatic Test Plug. 1. Connect the pressure source to the male-to-male port on the plug assembly (20). 2. Slowly pressurize the bottle weldment (35) using 5% Helium gas (156 to 159 psig) and 95% Nitrogen gas (2969 to 3016 psig) mixture between 3125 to 3175 psig at 70°F (21547 to 21892 kPag at 21°C). 3. Hold the pressure for a minimum period of one-minute and test for leaks around the weld joints, see Figure 101. 4. Verify no leaks are present by using the Helium Leak Detector (Table 101) probe to test all girth welds and weld joints. 5. The leakage rate shall not exceed 5 x 10-7 scc/second of Helium gas. 6. Record the result in the Test Record Table 102. 7. Depressurize and thoroughly clean and dry the interior and exterior of the bottle weldment (35) as necessary, refer to section 4.0 Cleaning. Alternate Leakage Test Method (Weight Check) #1 1. Connect the pressure source to the male-to-male port on the plug assembly (20). 2. Slowly pressurize the bottle weldment (35) using Nitrogen gas to 3125 to 3175 psig at 70°F (21547 to 21892 kPag at 21°C). 3. Hold the pressure and record the total weight of the container in Test Record Table 102. MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE 103 MAR 3/10 REV. 2, APR 13/10 4. After a minimum period of 24 hours, re-weight the container using the same scale as was used for the initial weight. A loss of .005 lbs (.002 kg) is an allowable condition. 5. Record the result in the Test Record Table 102. 6. Depressurize and thoroughly clean and dry the interior and exterior of the bottle weldment as necessary, refer to section 4.0 Cleaning. Alternate Leakage Test Method (Leak Check Solution) #2 1. Connect the pressure source to the male-to-male port on the plug assembly (20). 2. Slowly pressurize the bottle weldment (35) using Nitrogen gas to 3125 to 3175 psig at 70°F (21547 to 21892 kPag at 21°C). 3. Hold the pressure and record the total weight of the container in Test Record Table 102. 4. Using Quick-Spot Bubble-Forming Leak Detector Solution, apply the solution to all ports, weld joints, outlets etc. 5. Record the result in the Test Record Table 102. 6. Depressurize and thoroughly clean and dry the interior and exterior of the bottle weldment as necessary, refer to section 4.0 Cleaning. Leak Test Setup Figure 101 HYDROSTATIC (PROOF) PRESSURE TEST Hydrostatic (proof) testing of the bottle weldment (35) in an approved facility is recommended. The approved method of testing is by water jacket volumetric expansion, which uses an internal MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE 104 MAR 3/10 REV. 2, APR 13/10 water pressure (proof pressure) to determine total volumetric expansion. The pressure is then removed and the permanent volumetric expansion of the bottle weldment is determined. The percent of total expansion that is permanent is then calculated to determine if the bottle weldment (35) can be reused or must be replaced. HYDROSTATIC TESTING: Periodic hydrostatic testing of the container weldment is required to comply with the U.S. Department of Transportation requirement section 180.205, contained in the Code of Federal Regulations Title 49. The required retest period for the MASS Systems, AMETEK Ameron, LLC. container weldment (design specification 4DS) is 5-years. For aircraft with passenger seating configurations of Nine Seats or Less the CFR Title 49, section 180.205 applies, per the FAA Order 8300-10 (Amended 9-4-02), paragraphs 3.A., B., and C. Per the FAA Order 8300.10, paragraphs 3.A., B., and D., for aircraft with passenger seating configurations of Ten Seats or More the hydrostatic testing may be accomplished in phases or in the “C” or “D” Checks (or the operators equivalent designation), or the operator will comply with the airframe or the cylinder manufacturer’s life limit recommendations. MASS Systems, AMETEK Ameron, LLC. recommends 14-year hydrostatic test intervals. HYDROSTATIC (PROOF) TEST PROCEDURE 1. Use DOT approved hydrostatic (proof) test equipment or a DOT approved outside facility. 2. Verify the hydrostatic (proof) test water jacket calibration dates. 3. Prepare the bottle weldment (35) for hydrostatic (proof) test, as follows: 4. Remove plug assembly (20) and replace it with the Hydrostatic Test Plug per Table 101. 5. Thread a male-to-male MS33649-4 fitting in the port on the Hydrostatic Test Plug. 6. Completely fill the bottle weldment with water and thread the plug assembly from the step above. 7. Connect to the pressure source to the male-to-male MS33649-4 fitting and place the bottle weldment into a water jacket. 8. Close the lid to the water jacket and pressurize to seal the lid to the water jacket. 9. Adjust the burette to the reference level. 10. Pressurize the bottle weldment 4500 to 4525 psig (31028 to 31200 kPag) and maintain at this pressure for a minimum of three minutes. 11. After stabilization read the water level in the burette. This reading is the total expansion of the bottle weldment. 12. Depressurize the bottle weldment and record water level in burette. This reading is the permanent expansion of the bottle weldment. 13. Calculate and record the permanent volumetric expansion as percentage of total expansion. MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE 105 MAR 3/10 REV. 2, APR 13/10 Permanent volumetric expansion in cubic centimeters Percent (%) = X 100 Total volumetric expansion in cubic centimeters REQUIREMENT: The permanent volumetric expansion must not exceed ten-percent of the total volumetric expansion. 14. Retest if the bottle weldment decreases in size. Repeat the test once if system error is suspected. Replace the bottle weldment if the bottle weldment fails. 15. Remove the bottle weldment from the water jacket. 16. Remove the test fitting, and drain the water from the bottle weldment. CAUTION: IT IS EXTREMELY IMPORTANT TO COMPLETELY DRY THE BOTTLE WELDMENT, ANY WATER LEFT INSIDE DEGRADES PERFORMANCE OF THE BOTTLE WELDMENT. 17. Place the bottle weldment in an oven or dryer heated at 225F to 250F (107C to 121C), until completely dry and all traces of moisture are removed. 18. Inspect the bottle weldment for any signs of damage. 19. Impression stamp only the test date and inspection stamp on the bottle weldment boss. NOTE: Alternate marking method, electro-etch the test date and inspection stamp next to the bottle weldment boss. FINAL ASSEMBLY LEAKAGE CHECK TEST AND PRESSURE TEST OF RELIEF VALVE (5) WARNING: THE FOLLOWING SECTION REQUIRES THE USE OF HYDRAULIC/PNEUMATIC HIGH PRESSURE STANDS. ALL SAFETY PRECAUTIONS CONSISTENT WITH PROPER HANDLING OF PRESSURIZED VESSELS USING APPROPRIATE FIXTURES MUST BE TAKEN AT ALL TIMES. CAUTION: ALWAYS PRESSURIZE THE TEST CONTAINER USING SAFETY SHIELDS AND OR ENCLOSURES. FAILURE TO COMPLY CAN RESULT IN SEVERE INJURY TO PERSONNEL. MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE 106 MAR 3/10 REV. 2, APR 13/10 Relief Valve (5) Leak Check Method 1. Remove the relief valve (5) from the plug assembly (20). 2. Place the relief valve in the Relief Valve Leak Check Fixture (Table 101) and connect the pressure source to the other end of the fitting. 3. Slowly pressurize the fixture holding the relief valve using Nitrogen gas to 3125 to 3175 psig (21547 to 21892 kPag). 4. Hold the pressure for a minimum period of one-minute. 5. Maintain the 3125 to 3175 psig (21547 to 21892 kPag) pressure in the relief valve. 6. Slowly increase the pressure in the relief valve using Nitrogen gas until pressure loss is noticed on the pressure gauge stand indicating pressure relief. Record the relief pressure (pressure at the first leak) in the Test Record Table 102. 7. Slowly decrease the pressure in the relief valve or close off the Nitrogen gas and wait for the pressure to settle in the container indicating reseat pressure. Record the reseat pressure in the Test Record Table 102. 8. Depressurize and thoroughly clean the exterior of the relief valve as necessary, refer to section 4.0 Cleaning. Optional Relief Valve (5) Leak Check Method (Bubble Check) 1. Fill a see through glass/cup with alcohol. 2. Turn the relief valve (5) so that the relief valve sits comfortably in the cup with alcohol. 3. Slowly increase the pressure in the relief valve until a bubble is detected at the relief valve vent holes. Record cracking pressure (pressure at first bubble) in the Test Record Table 102. 4. While the relief valve is still in the see through alcohol cup, slowly decrease the pressure in the relief valve until no bubbles are seen exiting the relief valve vent holes (reseat pressure). Record the reseat pressure in the Test Record Table 102. 5. Depressurize and thoroughly clean the exterior of the relief valve as necessary, refer to section 4.0 Cleaning. Final Assembly Leakage Check Test 1. See the leak test setup Figure 102 for the emergency air reservoir assembly (-1) and the relief valve (5) tests. 2. Assembly the relief valve onto the plug assembly (20) using 15 foot-pounds (20,3 N.m) of torque using torque wrench (Table 801). MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE 107 MAR 3/10 REV. 2, APR 13/10 3. Connect a standard MS33649-4 male-to-male fitting to the pressure source and to the discharge port of the plug assembly. 4. Slowly pressurize the bottle weldment (35) using 5% Helium gas (156 to 159 psig) and 95% Nitrogen gas (2969 to 3016 psig) mixture between 3125 to 3175 psig at 70°F (21547 to 21892 kPag at 21°C). 5. Hold the pressure for a minimum period of one-minute and then test for leaks. 6. Verify no leaks are present by using the Helium Leak Detector (Table 101) probe to test all O-ring seals and ports. 7. Leakage rate shall not exceed 5 x 10-7 scc/sec of Helium gas. 8. Record results in the Test Record Table 102. 9. Depressurize and thoroughly clean the exterior of the bottle weldment as necessary, refer to section 4.0 Cleaning. Alternate Leakage Test Method (Weight Check) 1. Connect the pressure source to the male-to-male port on the plug assembly (20). 2. Slowly pressurize the bottle weldment (35) to 3125 to 3175 psig at 70°F (21547 to 21892 kPag at 21°C). 3. Hold the pressure and record the total weight of the container in Test Record Table 102. 4. After a minimum period of 24 hours, re-weight the container using the same scale as was used for the initial weight. A loss of .005 lbs (.002 kg) is an allowable condition. 5. Record the result in the Test Record Table 102. 6. Depressurize and thoroughly clean and dry the interior and exterior of the bottle weldment as necessary, refer to section 4.0 Cleaning. Alternate Leakage Test Method (Leak Check Solution) 1. Connect the pressure source to the male-to-male port on the plug assembly (20). 2. Slowly pressurize the bottle weldment (35) to 3125 to 3175 psig at 70°F (21547 to 21892 kPag at 21°C). 3. Hold the pressure and record the total weight of the container in Test Record Table 102. 4. Using Quick-Spot Bubble-Forming Leak Detector Solution, apply the solution to all ports, weld joints, outlets etc. 5. Record the result in the Test Record Table 102. 6. Depressurize and thoroughly clean and dry the interior and exterior of the bottle weldment (35) as necessary, refer to section 4.0 Cleaning. MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE 108 MAR 3/10 REV. 2, APR 13/10 Leak Test & Relief Valve Test Setup Figure 102 FAULT ISOLATION NOTE: Detailed fault isolation procedures are not required. 1. If excessive leakage is detected during the above Leak Test for the Emergency Air Reservoir Assembly (-1), repair or replace the components, as required. 2. If the increase in permanent volumetric expansion exceeds ten-percent during the Hydrostatic (Proof) Pressure Test, replace the bottle weldment (35). MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE 109 MAR 3/10 REV. 2, APR 13/10 Test Record Table 102 MASS SYSTEMS PART NO.: M6600194-7 DESCRIPTION: Reservoir Assembly – Emergency Air SERIAL NO. CUSTOMER PART NO.: 6600194-1, -4, -6 WORK ORDER NO.: MFG DATE: TEST PERFORMED BY: DATE: QA APPROVAL: DATE: DESCRIPTION LIMITS / SPECS ACTUAL VALUES PASS / FAIL DATE INSPECTOR APPROVAL Hydrostatic (Proof) Test of Empty Bottle Weldment (35) Volumetric Expansion not to exceed 10% _________ P / F _________ Leakage Check of Bottle Weldment (35) Leakage not to exceed 5 x 10 -7 scc/sec of Helium Alt 1: Initial Weight Check Method Final weight after 24 hrs later Alt 2: Leak Check Solution ________ scc/sec He ________ lbs P / F P / F P / F _________ _________ ________ Leakage Check of Emergency Air Reservoir Assembly (-1) Leakage not to exceed 5 x 10 -7 scc/sec of Helium Alt 1: Initial Weight Check Method Final weight after 24 hrs later Alt 2: Leak Check Solution ________ scc/sec He ________ lbs P / F P / F P / F _________ _________ ________ Relief Valve (5) Functional Test Relief Valve Data: A. Relief Pressure: 3300- to 3500-psig (22754 to 24133 kPag) B. Reseat Pressure: ≥ 3050 psig (21030 kPag) ________ Psig (kPag) ________ Psig (kPag) P / F P / F _________ _________ MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE 301 MAR 3/10 REV. 2, APR 13/10 DISASSEMBLY GENERAL Perform the Testing and Fault Isolation or the Check procedures, as applicable, to determine probable cause of malfunction. Then use the appropriate procedure listed below to remove the component part. Before proceeding with any removal or disassembly, personnel must familiarize themselves with the various components, their locations, and terminology. WARNING: BEFORE PROCEEDING ENSURE THAT THE EMERGENCY AIR RESERVOIR IS COMPLETELY DEPRESSURIZED. DISASSEMBLY TOOLS The recommended disassembly tools are listed in Table 301. Equivalent items may be used. Disassembly Tools Table 301 Nomenclature Part or Specification Number Source (CAGE)* Hand Tools --- Commercially available *Refer to the IPL, paragraph 2, for the address. PLUG ASSEMBLY 1. Unthread the relief valve (5) from the plug assembly (20). 2. Unthread the plug fitting (10) from the plug assembly, remove the o-ring (15) from the plug fitting and discard. 3. Unthread the plug assembly from the bottle weldment (35), remove the o-ring (25) and discard. MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE 401 MAR 3/10 REV. 2, APR 13/10 CLEANING CLEANING MATERIALS The recommended cleaning materials and equipment are listed in Table 401. Equivalent items may be used. Cleaning Materials and Equipment Table 401 Nomenclature Part or Specification Number Source (CAGE)* Alcohol, Isopropyl Federal Specification TT-I-735 Commercially available Cloth, Lint-Free --- Commercially available Detergent Solution --- Commercially available Light Probe --- Commercially available Oven or Heater, 250F (121C) --- Commercially available Tape --- Commercially available *Refer to the IPL, paragraph 2, for the address. METAL PARTS WARNING: USE CLEANING SOLVENT IN A WELL-VENTILATED AREA. AVOID PROLONGED INHALATION OF FUMES. KEEP THE CLEANING SOLVENT AWAY FROM OPEN FLAMES. 1. Clean all metal parts by wiping parts with a lint-free cloth moistened with a detergent solution. 2. Dry the parts thoroughly using a clean lint-free cloth. MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE 402 MAR 3/10 REV. 2, APR 13/10 BOTTLE WELDMENT 1. Clean the interior of the bottle weldment (35) after removal of the relief valve (5), the plug fitting (10), and the plug assembly (20) as follows: 2. Pour a small amount (1/4-to 1/2- cups) of the detergent solution (Table 401) into the bottle weldment. 3. Shake the bottle weldment in a circular motion, and drain into a disposal container. 4. Repeat steps 2 and 3 using isopropyl alcohol (Table 401) until no further contamination is evident in the drained alcohol. Use a light probe; inspect the interior of the bottle weldment. 5. Glass bead hone the exterior of the bottle weldment, if necessary: 6. Plug and protect the port boss threads. Cover the identification plate (30) with tape (Table 401). 7. Glass bead hone the exterior of the bottle weldment (wet or dry glass bead), except the threads of the fill boss. 8. After Glass bead hone remove the tape from the identification place and the plug from the port boss and thoroughly clean the bottle weldment. CAUTION: IT IS EXTREMELY IMPORTANT TO COMPLETELY DRY THE BOTTLE WELDMENT (35), ANY WATER LEFT INSIDE DEGRADES PERFORMANCE OF THE BOTTLE WELDMENT. 9. Insert the bottle weldment in an oven or place on a dryer heated (Table 401) at 225F to 250F (107C to 121C), until completely dry and all traces of moisture are removed. MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE 501 MAR 3/10 REV. 2, APR 13/10 CHECK CHECK TOOLS AND EQUIPMENT The recommended check tools and equipment are listed in Table 501. Equivalent items may be used. Check Tools and Equipment Table 501 Nomenclature Part or Specification Number Source (CAGE)* Light Probe --- Commercially available *Refer to the IPL, paragraph 2, for the address. BOTTLE WELDMENT 1. Inspect the bottle weldment (35) for scratches or dents that could reduce its strength as a pressure vessel. Dents deeper than 0.030 inch per inch (0,76 mm per mm) of average dent diameter, or scratches deeper than 0.005 inch (0,13 mm) or longer than 2-inches (50,8 mm) shall be cause for rejection. 2. Inspect all welded joints, external and internal, for fine cracks, or other irregularities, per CGA C-6. 3. Verify the hydrostatic (proof) test date is within the DOT regulation requirement and the bottle weldment is properly marked with the required DOT data. Refer to the Testing and Fault Isolation section. 4. Check the fill boss for stripped or damaged threads. RELIEF VALVE, PLUG FITTING, AND PLUG ASSEMBLY Check the relief valve (5), the plug fitting (10) and the plug assembly (25) for stripped or damaged threads. MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE 601 MAR 3/10 REV. 2, APR 13/10 REPAIR GENERAL The repair instructions are limited. Refer to the Disassembly and Assembly sections to replace component parts. REPAIR TOOLS AND MATERIALS The recommended repair tools and materials are listed in Table 601. Equivalent items can be used. Repair Tools and Materials Table 601 Nomenclature Part or Specification Number Source (CAGE)* Alcohol, Isopropyl Federal Specification TT-I-735 Commercially available Cloth, Crocus P-C-458 Commercially available Cloth, Lint-Free --- Commercially available *Refer to the IPL, paragraph 2, for the address. WARNING: DO NOT ATTEMPT ANY REPAIRS TO THE RESERVOIR WELDMENT (35) UNTIL THE HIGH PRESSURE GAS HAS BEEN DISCHARGED. REPAIRS 1. Replace all the component parts that fail to meet the Check requirements, or the Test requirements, or are damaged beyond minor repair. 2. Repair minor damage to threads, not exceeding one complete thread, by carefully tapping or chasing the thread. If more than one thread is affected, replace the component part. 3. Polish out minor nicks, scratches, and corrosion with a crocus cloth. MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE 701 MAR 3/10 REV. 2, APR 13/10 ASSEMBLY (INCLUDING STORAGE) ASSEMBLY TOOLS AND MATERIALS The recommended assembly tools and materials are listed in Table 701. Equivalent items may be used. Assembly Tools and Materials Table 701 Nomenclature Part or Specification Number Source (CAGE)* Lubricant, Grease DC55 (SCD SU00357-2) Dow Corning Corp. (71984) Wrench, Torque 0 to 50 foot-pounds Commercially available *Refer to the IPL, paragraph 2, for the address. RESERVOIR WELDMENT 1. Apply the lubricant (Table 701) to the threads of the plug assembly (20), the plug fitting (10), and the relief valve (5). Apply the lubricant (Table 701) to the o-rings (15 and 25). 2. Install o-ring (25) onto the plug assembly and thread into the bottle weldment (35). Torque the plug assembly 45 foot-pounds (61,0 Nm), using torque wrench (Table 701). 3. Install the o-ring onto the plug fitting and thread into the plug assembly. 4. Thread the relief valve into the plug assembly using 15 foot-pounds (20,3 N.m) of torque using torque wrench (Table 701). MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE 702 MAR 3/10 REV. 2, APR 13/10 STORAGE INSTRUCTIONS The recommended storage materials are given in Table 702. Equivalent items may be used. Storage Materials Table 702 Nomenclature Part or Specification Number Source (CAGE)* Cardboard Carton 18 x 8 x 8 inch (46 x 20 x 20 cm) Commercially available Packing Material --- Commercially available Plastic Bag Suitably sized Commercially available Protective Cap PD-40 (SCD SU00864-3) Commercially available 1. Install the protective caps on all threaded ports. 2. Place the Emergency Air Reservoir Assembly (-1) in a suitable sized storage container. Seal the storage container. 3. Mark the storage container. a. Part number e. UN1066 b. Serial number f. Class 2.2 c. Last hydrostatic test date g. Emergency Air Reservoir Assembly d. Overhaul date 4. The storage temperature is +40ºF to +100ºF (+4ºC to +38ºC). MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE 801 MAR 3/10 REV. 2, APR 13/10 FITS AND CLEARANCES TORQUE LIMITS The torque limits for the Emergency Air Reservoir Assembly are listed in Table 801. Torque Limits Table 801 Nomenclature Torque Range Plug Assembly (20) 45 foot-pounds (54,2 to 61,0 Nm) Relief Valve (5) 15 foot-pounds (20,3 Nm) MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE 901 MAR 3/10 REV. 2, APR 13/10 SPECIAL TOOLS, FIXTURES, AND EQUIPMENT Special tools, fixtures, and equipment required for maintenance of the reservoir assembly are listed in Table 901. Equivalent items may be used. Special Tools, Fixtures, and Equipment Table 901 Nomenclature Part or Specification Number Source (CAGE)* Alcohol, Isopropyl Federal Specification TT-I-735 Commercially available Cardboard Carton 18 x 8 x 8 (46 x 20 x 20 cm) Cloth, Crocus P-C-458 Commercially available Cloth, Lint-Free --- Commercially available Detergent Solution --- Commercially available Fill Tool 91200-1 MASS Systems, A Unit of Ameron Global, Inc. (0FRR4) Fitting, Test --- Commercially available Hand Tools --- Commercially available Helium Gas (He) 6000 psig (41370 kPag) Commercially available Hydrostatic (Proof) Test Setup --- DOT approved hydrostatic test facility Leak Detector, Helium HLD 3000 Leybold Inficon, Inc. (56507) Light Probe --- Commercially available Lubricant, Grease DC 55 (SCD SU00357-2) Dow Corning Co. (71984) Nitrogen Gas (GN2 ) 6000 psig (41370 kPag) Commercially available Oven or Heater 250F (121C) Commercially available Packing Material --- Commercially available Plastic Bag Suitably sized Commercially available Protective Cap PD-4D (SCD SU00864-3) Commercially available Tape --- Commercially available Wrench, Torque 0 to 50 foot-pounds Commercially available *Refer to IPL, paragraph 2, for the address. MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE 1001 MAR 3/10 REV. 2, APR 13/10 ILLUSTRATED PARTS LIST INTRODUCTION 1. Purpose This IPL illustrates and lists the spare parts with attaching hardware. 2. Manufacturer Name and Address Cage Code Name and Address Telephone TeleFAX 0FRR4 MASS Systems AMETEK Ameron, LLC 4750 Littlejohn Street Baldwin Park, CA 91706-2285 U.S.A. 626-337-4640 FAX 626-337-1641 service@MASS.AMETEK.com 56507 Leybold Inficon, Inc. Two Technology Place East Syracuse, New York 13057-9714 U.S.A. 315-434-1129 FAX 315-437-3803 71984 Dow Corning Corporation 2200 West Salzburg Road P. O. Box 997 Midland, Michigan 48640 U.S.A. 800-248-2481 FAX 517-496-4586 EXPLANATION OF PARTS LIST COLUMN The Detail Parts List is arranged in general sequence of disassembly. The parts are illustrated in an exploded-view illustration and listed in the related parts list. FIG. ITEM Column 1. The first number at the top of each FIG. Item column is the figure number of the corresponding illustration. The number given opposite each part number is the item number assigned to the part in the illustration. 2. A dash (-) in front of an item means the part is not illustrated. 3. Alpha-variants A through Z (except I and O) are assigned to item numbers, when necessary to identify: Added parts Alternate parts Service bulletin modified parts MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE 1002 MAR 3/10 REV. 2, APR 13/10 PART NUMBER Column This column contains the manufacturer’s part number for each part, as modified to meet the requirements of ATA 200/2000. These modifications can include. 1. Removal of blank spaces and special characters, with the possible exception of dashes. Dashes are permitted only between numeric characters. 2. Insertion of a reference part number compatible with ATA 200 if the manufacturer’s part number exceeds 15 characters. In these cases, the manufacturer’s part number is listed in the NOMENCLATURE column. NOMENCLATURE Column 1. This column contains descriptive nomenclature for each part, the manufacturer’s CAGE code (if the part is not manufactured or modified by MASS Systems), part number (if longer then 15 digits), service bulletins affecting the part, and obsolete part numbers. 2. The indenture system used in the NOMENCLATURE column indicates the relationship of one part to another, as follows: 1 2 3 End Item or Major Assembly ATTACHING PARTS Attaching Parts for End Item or Major Assembly * * * . Detail Parts for End Item or Major Assembly . Subassemblies ATTACHING PARTS Attaching Parts of Subassemblies * * * . . Detail parts for Subassemblies 3. Assemblies, subassemblies, and detail parts subject t o modification, deletion, addition, or replacement by an issued Service Bulletin are annotated to indicate both pre- and post-Service Bulletin configurations. The term (PRE SB XXXX) in designates the original configuration, and the term (POST SB XXXX) identifies assemblies and parts after the modification has been completed. MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE 1003 MAR 3/10 REV. 2, APR 13/10 4. The terms listed below are used when applicable to indicate the interchangeability of parts. Term Abbreviation Definition Optional OPT The listed part is optional to and interchangeable with other parts with the same item number variant group or other item numbers if designated. Superseded By SUSPD BY The part is replaced by and is not interchangeable with the item number shown in the notation. Supersedes SUPSDS The part replaces and is not interchangeable with the item number shown in the notation. Replaced By REPLD BY The part is replaced by and interchangeable with the item number shown in the notation. Replaces REPLS The part replaces and is interchangeable with the item number shown in the notation. EFF CODE Column This column contains letter codes (A, B, etc.) to indicate the alternate models or configurations of the end item to which the listed parts apply. Where this column has been left blank, the listed parts apply to all models or configurations included in the parts list. UNITS PER ASSY Column The quantity shown in this column represents the units required for one NHA or, when referring to attaching parts, the quantity to attach one such item. The abbreviation RF (reference) indicates that the end item or assembly is shown completely assembled on the illustration referenced in the NOMENCLATURE column. MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE 1004 MAR 3/10 REV. 2, APR 13/10 Emergency Air Reservoir Assembly Exploded View IPL Figure 1001 MASS SYSTEMS COMPONENT M AINTENANCE M ANUAL 52-10-05 PAGE 1005 MAR 3/10 REV. 2, APR 13/10 ILLUSTRATED PARTS LIST Reservoir Assembly - Emergency Air (200 CU-IN) IPL Table 1001 FIG. ITEM NO. PART NUMBER AIRLINE PART NO. NOMENCLATURE 1 2 3 4 5 6 7 EFF UNITS PER ASSY –1 M6600194-7 RESERVOIR ASSEMBLY, EMERGENCY AIR RF 5 PR02410-2 . VALVE, RELIEF 1 10 TL00805-3 . FITTING, PLUG 1 15 MS28775-10 . O-RING (SCD SU01251-10) 1 20 PR02415-1 . PLUG ASSEMBLY 1 25 MS28775-119 . O-RING (SCD SU01251-119) 1 30 PR02416-2 . PLATE, IDENTIFICATION 1 35 PR02455-1 . WELDMENT, BOTTLE 1 - Item not illustrated