Document
DEPARTMENT TRANSPORTATION OF
TURM
FEDERAL AVIATION ADMINISTRATION 6340 .2A SW SUP 1 SOUTHWEST REGION 16 Nov 72 FORT WORTH, TEXAS Cancellation Date : When basic is canceled RECONDITIONING OF RIGID RADOMES IN THE NATIONAL SU BJ : AIRSPACE SYSTEM (RIS : SM 6340-1) for 1 . PURPOSE . This supplement provides Southwest Regional procedures submitting Pre-DLM radome evaluation data .
for the 2 . EXPLANATION OF CHANGE . Regional requirements are established the findings using airway Facilities Sector offices to submit Pre-DLM ASW-400, attention : FAA Form 6340-1 to the Airway Facilities Division, 1 August of each year .
Maintenance Operations Branch, ASW-460, prior to PAGE CONTROL CHART Remove Pages Dated Insert Pages Dated 16 Nov 72 None Pie 2-Sl 'facing page 2) RICHARD R . STRYKER Chief, Airway Facilities Division U G W i-> . .J a: Fa fW LL!
h f, w INITIAL --,_ cipl .
U U- +) m li.
oc o _- Distribution : Initiated By : (Minimum) RAF/LG-2 ; FAF-2 ASW-460 AAF-210 (2 copies) 6340 .2A SW SUP 16 Nov 72 SUPPLEMENTAL PAGE SW Sectors for Submitting FAA Form 6340-1 .
8a-S1 Sector Requirement rigid radome in survey on each shall perform a yearly Pre-DLM be reconditioned except those that have been or will service using FAA Form the report year . Report the findings during attention : 6340-1 to the Airway Facilities Division, ASW-400, to 1 August of Branch, ASW-460, prior Maintenance Operations individual panels The degree of deterioration of each year .
section of the radome .
been noted to vary from section to has reflect the condition condition of the base panels may not The maximum effectiveness, this of the top most panels . To be of to one area of the radome evaluation should not be restricted surface .
Page 2-S1 Par 8-S1