Skip to main content

ALERT SERVICE BULLETIN

BELL 407GXP · Service Bulletins

Free account — keep the POHs & checklists you reference in one place.

Overview

This document is an Alert Service Bulletin for the Bell 407 model helicopters, specifically addressing the replacement of tailboom attachment hardware. It outlines compliance requirements, installation procedures, and necessary materials for ensuring the safety and integrity of the tailboom attachment.

  • Applies to Bell 407 helicopters with serial numbers 53000 through 53990.
  • Mandates replacement of tailboom attachment hardware due to excessive torque values.
  • Compliance required by December 31, 2010, for helicopters with 7,000 flight hours or less.
  • Requires approximately 2.0 man-hours to complete the bulletin.
  • New hardware must be used; old hardware should be discarded properly.
  • Torque checks are required 1 to 5 flight hours after installation and every 300 hours thereafter.
  • Eligible for warranty credit if compliance is met by the deadline.
  • No labor credit associated with this bulletin.

Document

Source

Originally published by regulations.gov. Sprinkle hosts a reference copy with an added summary, specifications and searchable full text.

Report a problem or request removal

Document details

Type
·
Service Bulletins
Year
·
2010
File size
·
245 KB
Publisher
·
regulations.gov
Language
·
en
About this document
What is the ALERT SERVICE BULLETIN?

The ALERT SERVICE BULLETIN is a service bulletins for the BELL 407GXP, dated 2010.

Where does the ALERT SERVICE BULLETIN come from?

This copy of the ALERT SERVICE BULLETIN was originally published by regulations.gov and is hosted on Sprinkle as a free, searchable reference copy.

What year was the ALERT SERVICE BULLETIN published?

The ALERT SERVICE BULLETIN — the BELL 407GXP service bulletins on file — is dated 2010.

Documentation completeness
4/7

Most owners only have the POH. Here's the essential set for the BELL 407GXP.

More BELL 407GXPmanuals & documents

In this document

Compliance

Helicopters with 7,000 flight hours or less must comply at the next 600-hour inspection or by December 31, 2010. Those with more than 7,000 flight hours must comply within 150 hours or 90 days.

Description

The bulletin addresses the torque values for tailboom attachment bolts, which exceed recommended limits, necessitating the replacement of the hardware.

Materials Required

Specific bolts and nuts are required for the replacement, along with anti-corrosion compound and special tools.

Accomplishment Instructions

Detailed steps for removing old hardware and installing new hardware, including torque specifications and anti-corrosion measures.

Special Inspection

Torque checks are required 1 to 5 flight hours after installation and recurring checks every 300 hours.

Maintenance of Tailboom Hardware

All hardware must be discarded each time the tailboom assembly is removed or installed, and only new hardware should be used.

Safety notes

  • Use a hacksaw to mark old hardware before discarding to prevent reuse.
  • Ensure proper torque values are applied during installation.
  • Discard all mating nuts and bolts each time the tailboom is removed.
  • Use only new hardware from approved sources for installation.
  • Torque checks are critical to ensure safety and compliance.

Full document text

NO. DATE PAGE DATE REV ALERT SERVICE BULLETIN AN APPROPRIATE ENTRY SHOULD BE MADE IN THE AIRCRAFT LOGBOOK UPON ACCOMPLISHMENT IF OWNERSHIP OF AIRCRAFT HAS CHANGED PLEASE FORWARD TO NEW OWNER 407-10-93 Aug 30, 2010 May 03, 2010 A 1 of 11 MODEL AFFECTED: 407 SUBJECT: TAILBOOM ATTACHMENT HARDWARE, REPLACEMENT OF. HELICOPTERS AFFECTED: Model 407 Helicopters serial number 53000 through 53990. [Model 407 helicopters serial number 53991 and subsequent will have the intent of this bulletin accomplished prior to delivery.] COMPLIANCE: For helicopters with cumulative flight time of 7,000 flight-hours or less: Accomplish this bulletin at the next 600 Hour scheduled inspection but no later than December 31st , 2010. For helicopters with cumulative flight time of more than 7,000 flight-hours: Accomplish this bulletin within 150 hours or 90 days, whichever comes first, following release date of this bulletin. DESCRIPTION: Bell Helicopter has reviewed the tailboom attachment installation of the Model 407. It has been determined that the torque values specified in the maintenance manual and used during assembly of the 407 for the tailboom attachment bolts exceed the specified torque range recommended for subject bolts. This bulletin mandates the removal of the existing tailboom attachment hardware and the installation of new hardware with reduced torque values. In addition, specific hardware installation/torquing procedure is provided for the tailboom to aft fuselage joint. ASB 407-10-93 Page 2 of 11 APPROVAL: The engineering design aspects of this bulletin are Transport Canada Civil Aviation (TCCA) approved. MANPOWER: Approximately 2.0 man-hours are required to complete this bulletin. Man-hours are based on hands-on time, and may vary with personnel and facilities available. This time estimated does not include post installation torque checks as required. WARRANTY: Owners / Operators of Bell Helicopters who comply with the instructions in this Bulletin will be eligible to receive a credit for the replacement parts outlined in the materials section of this bulletin. To receive this credit: • Comply with the instructions contained in this Bulletin no later than the applicable hours in the “compliance section” of this ASB, or before December 31st , 2010. • Purchase replacement parts as required in the materials section of this bulletin from a Bell approved source. • Submit an MMIR to the Bell Warranty Department. Customers who fail to comply with the instructions in this Bulletin after December 31 st , 2010 are not eligible for the special warranty credit listed above. There is no labor credit associated with this bulletin. MATERIAL: Required Material: The following material is required for the accomplishment of this bulletin and may be obtained through your Bell Helicopter Textron Supply Center. Part Number Nomenclature Quantity NAS627-30 Bolt 2 42FLW-720 Nut 2 NAS626-26 Bolt 2 42FLW-624 Nut 2 A ASB 407-10-93 Page 3 of 11 Consumable Material: The following material is required to accomplish this bulletin, but may not require ordering, depending on the operator’s consumable material stock levels. This material may be obtained through your Bell Helicopter Textron Supply Center. Part Number Nomenclature Quantity Reference CA1000 6OZ Anti-corrosion compound 1 C-586( Note 1) Note 1: Mastinox 6858KD (C-128) can be used as an alternate as prescribed in the current maintenance manual. This product can be obtained from BHT- approved supply sources under P/N XMAS6856K/160CTG. SPECIAL TOOLS: Socket P/N 407-230-001-101 or equivalent Note: an equivalent tool may be locally fabricated using a commercial 12-point socket. Refer to Figure 1. WEIGHT AND BALANCE: Not affected ELECTRICAL LOAD DATA: Not affected REFERENCES: BHT-407-IPB Illustrated Parts Breakdown BHT-407-MM Maintenance Manual BHT-ALL-SPM Standard Practices Manual PUBLICATIONS AFFECTED: BHT-407-MM Maintenance Manual A ASB 407-10-93 Page 4 of 11 ACCOMPLISHMENT INSTRUCTIONS: 1. Prepare helicopter for maintenance. 2. Remove the access panel from the right aft fuselage to gain access to the tailboom attachment hardware. Refer to BHT-407-MM, chapter 53 3. Support weight of the tailboom with an appropriate support device or stand. Replacement of tailboom attachment bolts and nuts; NOTE To prevent using the discrepant hardware again, it is recommended to use a hacksaw or an equivalent tool and make a .125 to .250 inch (3.175 to 6.35 mm) deep cut at any location on the bolt (1) and the nut (2) removed before discarding. 1. (Ref. Figure 2) Remove left upper attachment bolt (1) and nut (2) but retain the chamfered washer (4) and the regular washers (3). Discard the nut (2) and the bolt (1) you have removed. NOTE Replacement hardware (bolt (1) and nut (2)) shall be new. Hardware with unknown origin should not be used and must be discarded appropriately to prevent further usage. 2. Install a new bolt (1) procured from a BHT-Approved supply source as follows: a) Coat the shank of the new bolt (1) and the faying surfaces of the chamfered washer (4) with anti-corrosion compound (C-586). Do not apply compound on any threads of the bolt (1). b) Fit the new bolt (1) (with the chamfered washer (4) against head of bolt (1)) through the tailboom and the fuselage upper mating fittings. c) Select a sufficient number of washers (3) for opposite end of bolt (1) to obtain a minimum of 1 to a maximum of 3 threads showing beyond the nut (2) after proper torque is obtained. Coat the faying surfaces of these washers (3) with anti-corrosion compound (C-586) and fit over shank of the new bolt (1). A ASB 407-10-93 Page 5 of 11 NOTE Upper nut (2) must have a minimum tare value of 14 inch/lbs (1.58 Nm) or more. 3. Install a new nut (2) on the forward end of the bolt (1) as follows; a) Coat the nut (2) faying surface prior to assembly. Do not apply compound on any threads of the nut (2).

Show full text

b) Run the nut (2) on the threads of the mating bolt (1) with a dial indicator type torque wrench and measure existing tare. c) Torque the nut (2) between 570 to 580 inch/lbs (64.4 to 65.5 Nm) of torque plus the tare of the nut (2), using socket P/N 407-230-001-101 or equivalent tool. d) Back off nut (2) at least a minimum of ¾ of a turn before re-applying the same torque between 570 to 580 inch/lbs (64.4 to 65.5 Nm) plus the existing tare of the nut (2). e) Coat bolt (1) head, nut (2) and washers (3, 4) with anti-corrosion compound (C- 586). 4. Repeat Steps 1 through Step 3 for the opposite right upper bolt (1) and mating nut (2). NOTE To prevent using the discrepant hardware again, it is recommended to use a hacksaw or an equivalent tool and make a .125 to .250 inch (3.175 to 6.35 mm) deep cut at any location on the bolt (10) and the nut (7) removed before discarding. 5. (Ref. Figure 2) Remove left lower attachment bolt (10) and nut (7) but retain the chamfered washers (8) and the regular washers (9). Discard the nut (7) and the bolt (10) you have removed. ASB 407-10-93 Page 6 of 11 NOTE Replacement hardware (bolt (10) and nut (7)) shall be new. Hardware with unknown origin should not be used and must be discarded appropriately to prevent further usage. 6. Install a new bolt (10) procured from a BHT-Approved supply source as follows: a) Coat the shank of the new bolt (10) and the faying surfaces of the chamfered washer (8) with anti-corrosion compound (C-586). Do not apply compound on any threads of the bolt (10). b) Fit the new bolt (10) (with the chamfered washer (8) against head of bolt (10)) through the tailboom and the fuselage lower mating fittings. c) Select a sufficient number of washers (9) for opposite end of bolt (10) to obtain a minimum of 1 to a maximum of 3 threads showing beyond the nut (7) after proper torque is obtained. Coat the faying surfaces of these washers (9) with anti-corrosion compound (C-586) and fit over shank of the new bolt (10). NOTE Lower nut (7) must have a minimum tare value of 9.5 inch/lbs (1.07Nm) or more. 7. Install a new nut (7) on the forward end of the bolt (10) as follows; a) Coat the nut (7) faying surface prior to assembly. Do not apply compound on any threads of the nut (7). b) Run the nut (7) on the threads of the mating bolt (10) with a dial indicator type torque wrench and measure existing tare. c) Torque the nut (7) between 360 to 370 inch/lbs (40.6 to 41.8 Nm) of torque plus the tare of the nut, (7) using proper tool. d) Back off nut (7) at least a minimum of ¾ of a turn before re-applying the same torque between 360 to 370 inch/lbs (40.6 to 41.8 Nm) plus the existing tare of the nut (7). e) Coat bolt (10) head, nut (7) and washers (8, 9) with anti-corrosion compound (C-586) 8. Repeat Steps 5 through Step 7 for the opposite right lower bolt (10) and nut (7). ASB 407-10-93 Page 7 of 11 9. Reinstall aft fuselage access cover using the screws retained earlier. 10. Annotate technical records to indicate replacement of the tailboom assembly attachment hardware in compliance with this bulletin. SPECIAL INSPECTION: Torque check 1 to 5 flight hours following initial installation; NOTE For torque check purposes, the assembly torque to be applied is the minimum specified torque (see Figure 2) plus the minimum acceptable tare torque of 14 inch/lbs(1.58 Nm) for the upper nuts (2) and 9.5 inch/Lbs (1.07Nm) for the lower nuts(7). 1. Torque check the upper and lower nuts (2, 7) as per procedure found in Chapter 2 of the Standard Practices Manual every 1 to 5 flight hours until torque stabilized. 2. Annotate technical records to indicate compliance with this special inspection. SCHEDULED INSPECTION: Recurring torque check every 300 hours of operations. NOTE For torque check purposes, the assembly torque to be applied is the minimum specified torque (see Figure 2) plus the minimum acceptable tare torque of 14 inch/lbs(1.58 Nm) for the upper nuts (2) and 9.5 inch/Lbs (1.07Nm) for the lower nuts(7). 1. (Ref. BHT-ALL-SPM, Chapter 2)Gain access and perform a recurring torque check at all four attachment positions; a) Attachment that has not retained proper torque will require disassembly and inspection. The assembly shall be inspected for damage, corrosion, improper assembly, and condition. b) The mating hardware (fastener(s) and nut (s)) must be replaced with new one(s) and torqued to the Assembly Torque value following the procedure outline in this bulletin. ASB 407-10-93 Page 8 of 11 c) The affected hardware(s) would have to be Torque Checked again at the same scheduled intervals (special inspections) set following initial installation. 2. Annotate technical records to indicate compliance with this special inspection. 3. Repeat this torque check at every 300 hours of component operation. MAINTENANCE OF TAILBOOM HARDWARE: 1. Discard all hardware (mating nuts (2, 7) and bolts (1, 10)) each time the tailboom assembly is removed from or installed on the fuselage; a) Use a hacksaw or an equivalent tool and make a .125 to .250 inch (3.175 to 6.35 mm) deep cut at any location on the bolt (1) and the nut (2) removed before discarding. b) Install only new hardware using the procedure outlined in this bulletin. ASB 407-10-93 Page 9 of 11 FIGURE 1: Maximum and minimum reference dimensions of socket A ASB 407-10-93 Page 10 of 11 FIGURE 2: Replacement of tailboom upper attachment bolts (Sheet 1 of 2) ASB 407-10-93 Page 11 of 11 LEGEND FIGURE 2: Replacement of tailboom upper attachment bolts (Sheet 2 of 2)