Skip to main content

N316CJ STATUS REPORT BOMBARDIER

BOMBARDIER Learjet 45 XR · Maintenance Manual

Free account — keep the POHs & checklists you reference in one place.

Overview

This document is a status report for the Bombardier Learjet 45 XR, detailing maintenance records and compliance with various service bulletins. It includes information on flight hours, landing counts, and upcoming maintenance checks.

  • Owner: Jet America Inc
  • Aircraft: Learjet 45, Serial Number: 45-359
  • Total Airframe Hours: 5,274.8
  • Total Landings: 3,272
  • Engines: TFE731-20BR, Hours: 5,274.8 each
  • APU Hours: 2,107
  • Next maintenance checks due around July 2024
  • Multiple phases of maintenance checks outlined

Document

Source

Originally published by jetamericainc.com. Sprinkle hosts a reference copy with an added summary, specifications and searchable full text.

Report a problem or request removal

Document details

Type
·
Maintenance Manual
Year
·
2024
File size
·
5.3 MB
Publisher
·
jetamericainc.com
Language
·
en
About this document
What is the N316CJ STATUS REPORT BOMBARDIER?

The N316CJ STATUS REPORT BOMBARDIER is a maintenance manual for the BOMBARDIER Learjet 45 XR, dated 2024.

Where does the N316CJ STATUS REPORT BOMBARDIER come from?

This copy of the N316CJ STATUS REPORT BOMBARDIER was originally published by jetamericainc.com and is hosted on Sprinkle as a free, searchable reference copy.

What year was the N316CJ STATUS REPORT BOMBARDIER published?

The N316CJ STATUS REPORT BOMBARDIER — the BOMBARDIER Learjet 45 XR maintenance manual on file — is dated 2024.

Documentation completeness
2/7

Most owners only have the POH. Here's the essential set for the BOMBARDIER Learjet 45 XR.

  • Pilot's Operating Handbook / AFM
  • Checklist
  • Maintenance Manual
  • Parts Catalog (IPC)
  • Systems & Wiring
  • Service Bulletins on file
  • Type Certificate (TCDS)

More BOMBARDIER Learjet 45 XRmanuals & documents

In this document

General Information

The report includes general information about the aircraft, including owner, operator, and maintenance compliance history.

Maintenance Checks

Details various phases of maintenance checks, including Phase A, B, C, and D, with specific hour requirements and due dates.

Performance Enhancement Upgrade

Outlines the installation of performance enhancement upgrades, indicating compliance with specific bulletins.

Time Limits

Lists time limits for various maintenance checks and inspections, including estimated due dates.

Inspection Requirements

Describes unscheduled maintenance checks and inspections required for various conditions such as bird strikes and hard landings.

Analyst Information

Provides contact information for the analyst responsible for the report.

Safety notes

  • Complied with Bulletin 45-78-9 prior to August 19, 2014.
  • Inspections required for overweight landings.
  • Unscheduled maintenance checks required for hard landings.
  • Inspections necessary after severe turbulence or maneuvers.

Full document text

N316CJ STATUS REPORT BOMBARDIER Owner: Jet America Inc Operator: Airframe Learjet 45 45-359 30-Apr-2024 5,274.8 Hrs 3,272 Ldg 2,107 Hrs(APU) Eng 1 TFE731-20BR P-116949C 30-Apr-2024 5,274.8 Hrs 3,271 Enc Eng 2 TFE731-20BR P-116950C 30-Apr-2024 5,274.8 Hrs 3,271 Enc APU 1 RE100[LJ] APU P-393 27-Mar-2024 2,107 Hrs 4,036 APUS Program Type: Standard - Program No.1, General Categories: RVSM,EMM,FAR 91,Ch.5 Interval Cost: 78,389.23+ Man Hrs: 11,817.65+ Analyst: David White dwhite@traxxall.com Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining ▼ 0 - GENERAL 2014-13-06 Para (g)(1) RE (-) 0 ENG1 Complied With BULLETIN 45-78-9 DATED FEBRUARY 27, 2012 WAS COMPLIED WITH PRIOR TO AUGUST 19, 2014 Mos 14-Nov-2013 Hrs Enc 2014-13-06 Para (g)(1) RE (-) 0 ENG2 Complied With BULLETIN 45-78-9 DATED FEBRUARY 27, 2012 WAS COMPLIED WITH PRIOR TO AUGUST 19, 2014 Mos 14-Nov-2013 Hrs Enc ▼ 1 - -- 45-00-1 General - Installation of Performance Enhancement Upgrade RE (-) Optional 1 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-00-1 Rev 1 General - Installation of Performance Enhancement Upgrade RE (-) Optional 1 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-00-1 Rev 2 General - Installation of Performance Enhancement Upgrade RE (-) Optional 1 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-00-1 Rev 3 General - Installation of Performance Enhancement Upgrade RE (-) Optional 1 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-00-1 Rev 4 General - Installation of Performance Enhancement Upgrade RE (-) Optional 1 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-00-1 Rev 5 General - Installation of Performance Enhancement Upgrade RE (-) Optional 1 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-00-1 Rev 6 General - Installation of Performance Enhancement Upgrade RE (-) Optional 1 A/F Eff: 10-Nov-2000 Not Applicable Mos 29-Aug-2019 Hrs 4,516.2 Ldg 2,733 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 1/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining ▼ 5 - TIME LIMITS/MAINTENANCE CHECKS 05-11-01 Phase A1 - 300 Hour Checks RE TLMC 05-10-00 ≈24-Jul-2024 5 A/F (SOURCE: MM-104, MM-105) Mos 09-Feb-2024 12 -/+14d 09-Feb-2025 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 5,553.5 278.7 Hrs (+25) Ldg 3,757 05-11-02 Phase A2 - 300 Hour Checks RE TLMC 05-10-00 ≈24-Jul-2024 5 A/F (SOURCE: MM-104, MM-105) Mos 09-Feb-2024 12 -/+14d 09-Feb-2025 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 5,553.5 278.7 Hrs (+25) Ldg 3,757 05-11-03 Phase A3 - 300 Hour Checks RE TLMC 05-10-00 ≈24-Jul-2024 5 A/F (SOURCE: MM-104, MM-105) Mos 09-Feb-2024 12 -/+14d 09-Feb-2025 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 5,553.5 278.7 Hrs (+25) Ldg 3,757 05-11-04 Phase A4 - 300 Hour Checks RE TLMC 05-10-00 ≈24-Jul-2024 5 A/F (SOURCE: MM-104, MM-105) Mos 09-Feb-2024 12 -/+14d 09-Feb-2025 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 5,553.5 278.7 Hrs (+25) Ldg 3,757 05-11-05 Phase A5 - 300 Hour Checks RE TLMC 05-10-00 ≈24-Jul-2024 5 A/F (SOURCE: MM-104, MM-105) Mos 09-Feb-2024 12 -/+14d 09-Feb-2025 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 5,553.5 278.7 Hrs (+25) Ldg 3,757 05-11-06 Phase A6 - 300 Hour Checks RE TLMC 05-10-00 ≈24-Jul-2024 5 A/F (SOURCE: MM-104, MM-105) Mos 09-Feb-2024 12 -/+14d 09-Feb-2025 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 5,553.5 278.7 Hrs (+25) Ldg 3,757 05-12-01 Phase B1 - 600 Hour Checks RE TLMC 05-10-00 ≈24-Oct-2024 5 A/F (Tol. Adjustment: -30d) (SOURCE: MM-104, MM-105) Mos 09-Feb-2024 24 -/+14d 09-Jan-2026 1.6 Years (+14 Days) Hrs 5,253.5 600 -/+25 5,853.5 578.7 Hrs (+25) Ldg 3,757 05-12-02 Phase B2 - 600 Hour Checks RE TLMC 05-10-00 ≈24-Oct-2024 5 A/F (Tol. Adjustment: -30d) (SOURCE: MM-104, MM-105) Mos 09-Feb-2024 24 -/+14d 09-Jan-2026 1.6 Years (+14 Days) Hrs 5,253.5 600 -/+25 5,853.5 578.7 Hrs (+25) Ldg 3,757 05-12-03 Phase B3 - 600 Hour Checks RE TLMC 05-10-00 ≈24-Oct-2024 5 A/F (Tol. Adjustment: -30d) (SOURCE: MM-104, MM-105) Mos 09-Feb-2024 24 -/+14d 09-Jan-2026 1.6 Years (+14 Days) Hrs 5,253.5 600 -/+25 5,853.5 578.7 Hrs (+25) Ldg 3,757 05-12-04 Phase B4 - 600 Hour Checks RE TLMC 05-10-00 ≈24-Oct-2024 5 A/F (Tol. Adjustment: -30d) (SOURCE: MM-104, MM-105) Mos 09-Feb-2024 24 -/+14d 09-Jan-2026 1.6 Years (+14 Days) Hrs 5,253.5 600 -/+25 5,853.5 578.7 Hrs (+25) Ldg 3,757 05-12-05 Phase B5 - 600 Hour Checks RE TLMC 05-10-00 ≈24-Oct-2024 5 A/F (Tol. Adjustment: -30d) (SOURCE: MM-104, MM-105) Mos 09-Feb-2024 24 -/+14d 09-Jan-2026 1.6 Years (+14 Days) Hrs 5,253.5 600 -/+25 5,853.5 578.7 Hrs (+25) Ldg 3,757 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 2/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining 05-12-06 Phase B6 - 600 Hour Checks RE TLMC 05-10-00 ≈24-Oct-2024 5 A/F (Tol. Adjustment: -30d) (SOURCE: MM-104, MM-105) Mos 09-Feb-2024 24 -/+14d 09-Jan-2026 1.6 Years (+14 Days) Hrs 5,253.5 600 -/+25 5,853.5 578.7 Hrs (+25) Ldg 3,757 05-13-01 Phase C1 - 1200 Hour Checks RE TLMC 05-10-00 ≈24-Apr-2025 5 A/F (Tol. Adjustment: -30d) (SOURCE: MM-104, MM-105) Mos 09-Feb-2024 48 -/+14d 09-Jan-2028 3.6 Years (+14 Days) Hrs 5,253.5 1,200 -/+25 6,453.5 1,178.7 Hrs (+25) Ldg 3,757 05-13-02 Phase C2 - 1200 Hour Checks RE TLMC 05-10-00 ≈24-Apr-2025 5 A/F (Tol. Adjustment: -30d) (SOURCE: MM-104, MM-105) Mos 09-Feb-2024 48 -/+14d 09-Jan-2028 3.6 Years (+14 Days) Hrs 5,253.5 1,200 -/+25 6,453.5 1,178.7 Hrs (+25) Ldg 3,757

Show full text

05-13-03 Phase C3 - 1200 Hour Checks RE TLMC 05-10-00 ≈24-Apr-2025 5 A/F (Tol. Adjustment: -30d) (SOURCE: MM-104, MM-105) Mos 09-Feb-2024 48 -/+14d 09-Jan-2028 3.6 Years (+14 Days) Hrs 5,253.5 1,200 -/+25 6,453.5 1,178.7 Hrs (+25) Ldg 3,757 05-13-04 Phase C4 - 1200 Hour Checks RE TLMC 05-10-00 ≈24-Apr-2025 5 A/F (Tol. Adjustment: -30d) (SOURCE: MM-104, MM-105) Mos 09-Feb-2024 48 -/+14d 09-Jan-2028 3.6 Years (+14 Days) Hrs 5,253.5 1,200 -/+25 6,453.5 1,178.7 Hrs (+25) Ldg 3,757 05-13-05 Phase C5 - 1200 Hour Checks RE TLMC 05-10-00 ≈24-Apr-2025 5 A/F (Tol. Adjustment: -30d) (SOURCE: MM-104, MM-105) Mos 09-Feb-2024 48 -/+14d 09-Jan-2028 3.6 Years (+14 Days) Hrs 5,253.5 1,200 -/+25 6,453.5 1,178.7 Hrs (+25) Ldg 3,757 05-13-06 Phase C6 - 1200 Hour Checks RE TLMC 05-10-00 ≈24-Apr-2025 5 A/F (Tol. Adjustment: -30d) (SOURCE: MM-104, MM-105) Mos 09-Feb-2024 48 -/+14d 09-Jan-2028 3.6 Years (+14 Days) Hrs 5,253.5 1,200 -/+25 6,453.5 1,178.7 Hrs (+25) Ldg 3,757 05-14-01 Phase D1 - 2400 Hour Checks RE TLMC 05-10-00 ≈12-Oct-2025 5 A/F (SOURCE: MM-104, MM-105) Mos 10-Feb-2021 96 -/+14d 10-Feb-2029 4.7 Years (+14 Days) Hrs 4,610.5 2,400 -/+25 7,010.5 1,735.7 Hrs (+25) Ldg 2,822 05-14-02 Phase D2 - 2400 Hour Checks RE TLMC 05-10-00 ≈12-Oct-2025 5 A/F (SOURCE: MM-104, MM-105) Mos 10-Feb-2021 96 -/+14d 10-Feb-2029 4.7 Years (+14 Days) Hrs 4,610.5 2,400 -/+25 7,010.5 1,735.7 Hrs (+25) Ldg 2,822 05-14-03 Phase D3 - 2400 Hour Checks RE TLMC 05-10-00 ≈12-Oct-2025 5 A/F (SOURCE: MM-104, MM-105) Mos 10-Feb-2021 96 -/+14d 10-Feb-2029 4.7 Years (+14 Days) Hrs 4,610.5 2,400 -/+25 7,010.5 1,735.7 Hrs (+25) Ldg 2,822 05-14-04 Phase D4 - 2400 Hour Checks RE TLMC 05-10-00 ≈12-Oct-2025 5 A/F (SOURCE: MM-104, MM-105) Mos 10-Feb-2021 96 -/+14d 10-Feb-2029 4.7 Years (+14 Days) Hrs 4,610.5 2,400 -/+25 7,010.5 1,735.7 Hrs (+25) Ldg 2,822 05-14-05 Phase D5 - 2400 Hour Checks RE TLMC 05-10-00 ≈12-Oct-2025 5 A/F (SOURCE: MM-104, MM-105) Mos 10-Feb-2021 96 -/+14d 10-Feb-2029 4.7 Years (+14 Days) Hrs 4,610.5 2,400 -/+25 7,010.5 1,735.7 Hrs (+25) Ldg 2,822 05-14-06 Phase D6 - 2400 Hour Checks RE TLMC 05-10-00 ≈12-Oct-2025 5 A/F (SOURCE: MM-104, MM-105) Mos 10-Feb-2021 96 -/+14d 10-Feb-2029 4.7 Years (+14 Days) Hrs 4,610.5 2,400 -/+25 7,010.5 1,735.7 Hrs (+25) Ldg 2,822 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 3/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining 05-15-00 4800 Hour Inspections RE TLMC 05-10-00 ≈14-Oct-2027 5 A/F (SOURCE: MM-104, MM-105) Mos 10-Feb-2021 Hrs 4,610.5 4,800 -/+25 9,410.5 4,135.7 Hrs (+25) Ldg 2,822 05-16-00 9600 Hour Inspections RE TLMC 05-10-00 ≈10-Dec-2027 5 A/F (SOURCE: MM-104, MM-105) Mos Hrs 9,600 -/+25 9,600 4,325.2 Hrs (+25) Ldg 05-17-00 Major Landing Gear Inspection RE TLMC 05-10-00 ≈12-Dec-2029 5 A/F (SOURCE: MM-104, MM-105) Mos Hrs Ldg 10,000 -/+25 10,000 6,728 Ldg (+25) 05-50-00-1 Bird Strike - Inspection RE (A/R) 05-50-00, Unscheduled Maintenance Check 5 A/F (SOURCE: MM-104, MM-105) Mos Hrs Ldg 05-50-00-10 High Ground Wind Gust - Inspection RE (A/R) 05-50-00, Unscheduled Maintenance Check 5 A/F (SOURCE: MM-104, MM-105) Mos Hrs Ldg 05-50-00-11 Heat Damage - Inspection RE (A/R) 05-50-00, Unscheduled Maintenance Check 5 A/F (SOURCE: MM-104, MM-105) Mos Hrs Ldg 05-50-00-12 Nacelle Heat Fail Message - Inspection RE (A/R) 05-50-00, Unscheduled Maintenance Check 5 A/F (SOURCE: MM-104, MM-105) Mos Hrs Ldg 05-50-00-13 Elevator Disconnect - Inspection RE (A/R) 05-50-00, Unscheduled Maintenance Check 5 A/F (SOURCE: MM-104, MM-105) Mos Hrs Ldg 05-50-00-14 Wing Flap System Overspeed Check RE (A/R) 05-50-00, Unscheduled Maintenance Check 5 A/F (SOURCE: MM-104, MM-105) Mos Hrs Ldg 05-50-00-15 Volcanic Ash Inspection and Maintenance Procedures RE (A/R) 05-50-00, Unscheduled Maintenance Check 5 A/F (SOURCE: MM-104, MM-105) Mos Hrs Ldg 05-50-00-16 Pressure cabin Skin Thickness Measurements - Inspection RE (A/R) 05-50-00, Unscheduled Maintenance Check 5 A/F (SOURCE: MM-104, MM-105) Mos Hrs Ldg [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 4/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining 05-50-00-17 Aircraft Operations in Salt Influenced Environments - Inspection RE (A/R) Unscheduled Maintenance Check 5 A/F Mos Hrs Ldg 05-50-00-18 Foreign Object Damage RE (A/R) 05-50-00, Unscheduled Maintenance Check 5 A/F (SOURCE: MM-104, MM-105) Mos Hrs Ldg 05-50-00-19 Engine Vibration Indication RE (A/R) 05-50-00, Unscheduled Maintenance Check 5 A/F (SOURCE: MM-104, MM-105) Mos Hrs Ldg 05-50-00-2 Overweight Landing (Weight in Excess of Maximun Landing Weight) - Inspection RE (A/R) 05-50-00, Unscheduled Maintenance Check 5 A/F (SOURCE: MM-104, MM-105) Mos Hrs Ldg 05-50-00-3 Hard landing - Inspection RE (A/R) 05-50-00, Unscheduled Maintenance Check 5 A/F (SOURCE: MM-104, MM-105) Mos Hrs Ldg 05-50-00-4 Sever turbulence and/or Maneuvers - Inspection RE (A/R) 05-50-00, Unscheduled Maintenance Check 5 A/F (SOURCE: MM-104, MM-105) Mos Hrs Ldg 05-50-00-5 Engine Change/Removal - Inspection RE (A/R) 05-50-00, Unscheduled Maintenance Check 5 A/F (SOURCE: MM-104, MM-105) Mos Hrs Ldg 05-50-00-6 High Energy Stop (Landing and Rejected Takeoff) - Inspection RE (A/R) 05-50-00, Unscheduled Maintenance Check 5 A/F (SOURCE: MM-104, MM-105) Mos Hrs Ldg 05-50-00-7 Thrust Reverser - Inspection RE (A/R) 05-50-00, Unscheduled Maintenance Check 5 A/F (SOURCE: MM-104, MM-105) Mos Hrs Ldg 05-50-00-8 Overspeed Recovery Landing Gear Inspection (landing Gear Extension at High Speed) RE (A/R) 05-50-00, Unscheduled Maintenance Check 5 A/F (SOURCE: MM-104, MM-105) Mos Hrs Ldg [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 5/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining 05-50-00-9 Lightning Strike - Inspection RE (A/R) 05-50-00, Unscheduled Maintenance Check 5 A/F (SOURCE: MM-104, MM-105) Mos Hrs Ldg 057110 Perform 150 to 250 Hour Routine Inspection Per Manufacturers Instructions RE ≈08-Jun-2024 5 ENG1 Brand C:057110 Mos 09-Feb-2024 Hrs 5,253.5 150 +100 5,403.5 128.7 Hrs (+100) Enc 3,756 057110 Perform 150 to 250 Hour Routine Inspection Per Manufacturers Instructions RE ≈08-Jun-2024 5 ENG2 Brand C:057110 Mos 09-Feb-2024 Hrs 5,253.5 150 +100 5,403.5 128.7 Hrs (+100) Enc 3,756 057120 Perform 300 to 440 Hour Routine Inspection Per Manufacturer's Instructions RE (N/A) 5 ENG1 Brand C:057120 Mos Hrs Enc 057120 Perform 300 to 440 Hour Routine Inspection Per Manufacturer's Instructions RE (N/A) 5 ENG2 Brand C:057120 Mos Hrs Enc 057130 Perform 500 to 650 Hour Routine Inspection Per Manufacturers Instructions RE ≈24-Oct-2024 5 ENG1 Brand C:057130 Mos 09-Feb-2024 Hrs 5,253.5 600 -100/+50 5,853.5 578.7 Hrs (+50) Enc 3,756 057130 Perform 500 to 650 Hour Routine Inspection Per Manufacturers Instructions RE ≈24-Oct-2024 5 ENG2 Brand C:057130 Mos 09-Feb-2024 Hrs 5,253.5 600 -100/+50 5,853.5 578.7 Hrs (+50) Enc 3,756 057140 Perform 500 to 850 Hour Routine Inspection Per Manufacturers Instructions RE ≈24-Dec-2024 5 ENG1 Brand C:057140 Mos 09-Feb-2024 Hrs 5,253.5 800 -300/+50 6,053.5 778.7 Hrs (+50) Enc 3,756 057140 Perform 500 to 850 Hour Routine Inspection Per Manufacturers Instructions RE ≈24-Dec-2024 5 ENG2 Brand C:057140 Mos 09-Feb-2024 Hrs 5,253.5 800 -300/+50 6,053.5 778.7 Hrs (+50) Enc 3,756 057150 Perform 1000 to 1300 Hour Routine Inspection Per Manufacturers Instructions RE ≈24-Apr-2025 5 ENG1 Brand C:057150 Mos 09-Feb-2024 Hrs 5,253.5 1,200 -200/+100 6,453.5 1,178.7 Hrs (+100) Enc 3,756 057150 Perform 1000 to 1300 Hour Routine Inspection Per Manufacturers Instructions RE ≈24-Apr-2025 5 ENG2 Brand C:057150 Mos 09-Feb-2024 Hrs 5,253.5 1,200 -200/+100 6,453.5 1,178.7 Hrs (+100) Enc 3,756 057160 Perform 1500 to 1650 Hour Routine Inspection Per Manufacturers Instructions RE ≈05-Feb-2025 5 ENG1 Brand C:057160 Mos 20-May-2020 Hrs 4,593.2 1,600 -100/+50 6,193.2 918.4 Hrs (+50) Enc 2,809 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 6/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining 057160 Perform 1500 to 1650 Hour Routine Inspection Per Manufacturers Instructions RE ≈05-Feb-2025 5 ENG2 Brand C:057160 Mos 20-May-2020 Hrs 4,593.2 1,600 -100/+50 6,193.2 918.4 Hrs (+50) Enc 2,809 2008-01-03 Principal structural elements (PSEs) RE (-) Mandatory 5 A/F Eff: 14-Feb-2008 Not Applicable BY SERIAL NUMBER Mos 11-Feb-2010 Hrs 1,203.8 Ldg 739 2012-0121 Time Limits / Maintenance Checks - Airworthiness Limitations Section - Implementation T (A/R) Mandatory 5 A/F Eff: 20-Jul-2012 Mos Hrs Ldg 2012-08-08 Periodic Inspections RE (-) Mandatory 5 A/F Eff: 29-May-2012 Complied With Mos 01-Aug-2012 Hrs 2,548.4 Ldg 1,517 45-5-1 Time Limits/Maintenance Checks - Transition To Evolved Maintenance Program T (-) Optional 5 A/F Eff: 16-Oct-2013 Mos Hrs Ldg 45-5-1 Rev 1 Time Limits/Maintenance Checks - Transition To Evolved Maintenance Program T (-) Optional 5 A/F Eff: 23-Mar-2015 (APX COST: 70,000) (NOTE: Except special mission air- craft. (Controlled by eINSPECTOR applicability list.)) Mos Hrs Ldg 45-5-1 Rev 2 Time Limits/Maintenance Checks - Transition To Evolved Maintenance Program T (A/R) Optional 5 A/F Eff: 05-Mar-2018 (NOTE: EFFECTIVITY: As per aircraft serialization, except special mission aircraft. (Controlled by eINSPECTOR applicability list.)) Mos Hrs Ldg ▼ 8 - LEVELING AND WEIGHING. 08-10-01-001 Aircraft Weighing and Balancing RE 8 A/F Inspected Date 17-Feb-2022 (AVG MAN HRS: 45.5) (APX COST: 325) (UPDATE NOTE: 5 YEAR REWEIGHT AND BALANCE C/O IAW IR 45 AMM 08-10-00.) Mos 03-Mar-2022 36 17-Feb-2025 9 Months Hrs 4,883 Ldg 3,012 45-8-1 Leveling and Weighing - Ballast Weight Installation, Fuselage Station 630 T (A/R) Optional 8 A/F Eff: 09-Aug-2010 Mos Hrs Ldg 45-8-2 Ballast Weight Installation - Fuselage Station 623 (This is an un-released SB available for Proof) T (A/R) Optional 8 A/F Eff: 09-Aug-2010 (NOTE: NOTE: THIS IS NOT FAA APPROVED DATA FOR INSTALLATION ON THE AIRCRAFT.) Mos Hrs Ldg 45-8-3 Ballast Weight Installation - Fuselage Station 602 Mid shelf (This is an un-released SB available for Proof) T (A/R) Optional 8 A/F Eff: 09-Aug-2010 (NOTE: NOTE; THIS IS NOT FAA APPROVED DATA FOR INSTALLATION ON THE AIRCRAFT.) Mos Hrs Ldg 45-8-4 Ballast Weight Installation - Fuselage Station 609 Upper Shelf (This is an un-released SB available for Proof) T (A/R) Optional 8 A/F Eff: 09-Aug-2010 (NOTE: NOTE: THIS IS NOT FAA APPROVED DATA FOR INSTALLATION ON THE AIRCRAFT.) Mos Hrs Ldg [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 7/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining 45-8-5 Ballast Weight Installation - Aft Equipment Shelf (Bottom Shelf) (This is an un-released SB available for Proof) T (A/R) Optional 8 A/F Eff: 09-Aug-2010 (NOTE: NOTE: THIS IS NOT FAA APPROVED DATA FOR INSTALLATION ON THE AIRCRAFT.) Mos Hrs Ldg ▼ 11 - PLACARDS AND MARKINGS 45-11-1 Placard - Removal of Anti-Icing Additive Requirement from Placard RE (-) Optional 11 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-11-1 Rev 1 Placard - Removal of Anti-Icing Additive Requirement from Placard RE (-) Optional 11 A/F Eff: 10-Dec-1999 Not Applicable Mos 29-Aug-2019 Hrs 4,516.2 Ldg 2,733 45-11-2 Placards and Markings - Installation of U.S. and Metric Oxygen Fill Table Placard RE (-) Optional 11 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-11-2 Rev 1 Placards and Markings - Installation of U.S. and Metric Oxygen Fill Table Placard RE (-) Optional 11 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-11-2 Rev 2 Placards and Markings - Installation of U.S. and Metric Oxygen Fill Table Placard RE (-) Optional 11 A/F Eff: 30-Nov-2004 Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-11-3 Placards and Markings - Installation of Upper Entry Door Emergency Exit Placard RE (-) Recommended 11 A/F Eff: 17-May-2002 Not Applicable Mos 14-Dec-2020 Hrs 4,610.5 Ldg 2,822 45-11-4 Placards and Markings - Increase Maximum Take-Off Weight to 21,500 Pounds RE (-) Optional 11 A/F Not Applicable NO ACTION REQUIRED SB SUPERCEDED Mos 13-Mar-2008 Hrs Ldg 45-11-4 Rev 1 Placards and Markings - Increase Maximum Take-Off Weight to 21,500 Pounds RE (-) Optional 11 A/F Not Applicable NO ACTION REQUIRED SB SUPERCEDED Mos 01-Apr-2008 Hrs Ldg 45-11-4 Rev 2 Placards and Markings - Increase Maximum Take-Off Weight to 21,500 Pounds RE (-) Optional 11 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-11-4 Rev 3 Placards and Markings - Increase Maximum Take-Off Weight to 21,500 Pounds RE (-) Optional 11 A/F Complied With Mos 13-Mar-2008 Hrs Ldg 45-11-4 Rev 4 Placards and Markings - Increase Maximum Take-Off Weight to 21,500 Pounds RE (-) Optional 11 A/F Eff: 11-Feb-2013 Not Applicable Mos 29-Aug-2019 Hrs 4,516.2 Ldg 2,733 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 8/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining 45-11-5 Placards and Markings - Increase Maximum Zero Fuel Weight (16,500 pounds) RE (-) Optional 11 A/F Eff: 24-Sep-2007 (AVG MAN HRS: 1) Mos Hrs Ldg 45-11-5 Rev 1 Placards and Markings - Increase Maximum Zero Fuel Weight (16,500 pounds) RE (-) Optional 11 A/F Eff: 04-Feb-2008 (AVG MAN HRS: 1) Mos Hrs Ldg 45-11-5 Rev 2 Placards and Markings - Increase Maximum Zero Fuel Weight (16,500 pounds) RE (-) Optional 11 A/F Eff: 12-May-2008 (AVG MAN HRS: 1) Mos Hrs Ldg 45-11-5 Rev 3 Placards and Markings - Increase Maximum Zero Fuel Weight (16,500 pounds) RE (-) Optional 11 A/F Eff: 18-Mar-2013 (AVG MAN HRS: 1) Mos Hrs Ldg 45-11-5 Rev 4 Placards and Markings - Increase Maximum Zero Fuel Weight (16,500 pounds) RE (-) Optional 11 A/F Eff: 20-Oct-2014 Mos Hrs Ldg 45-11-5 Rev 5 Placards and Markings - Increase Maximum Zero Fuel Weight (16,500 pounds) T (-) Optional 11 A/F Eff: 24-Sep-2007 (AVG MAN HRS: 1) Mos Hrs Ldg 45-11-5 Rev 6 Placards and Markings - Increase Maximum Zero Fuel Weight (16,500 pounds) T (A/R) Optional 11 A/F Eff: 09-Nov-2015 (AVG MAN HRS: 1) (NOTE: ForLearjet 45-368, when equipped with Garmin Avionics) Mos Hrs Ldg 45-11-6 Placards and Markings - Replacement of Nose Strut Servicing Placards RE (-) Recommended 11 A/F Eff: 10-Dec-2012 (AVG MAN HRS: 4) Mos Hrs Ldg 45-11-6 Rev 1 Placards and Markings - Replacement of Nose Strut Servicing Placards RE (-) Recommended 11 A/F Eff: 21-Jan-2013 Complied With (AVG MAN HRS: 4) Mos 01-Mar-2013 Hrs 2,753.9 Ldg 1,625 45-11-6 Rev 2 Placards and Markings - Replacement of Nose Strut Servicing Placards RE (-) Recommended 11 A/F Eff: 28-May-2013 Complied With NO REWORK IF PREVIOUS C/W (AVG MAN HRS: 4) Mos 01-Jul-2013 Hrs 2,890.4 Ldg 1,692 45-11-6 Rev 3 Placards and Markings - Replacement of Nose Strut Servicing Placards RE (-) Recommended 11 A/F Eff: 19-May-2014 Complied With NO REWORK REQUIRED IF PREVIOUS COMPLIED WITH (AVG MAN HRS: 4) Mos 13-Jun-2014 Hrs 3,195.4 Ldg 1,869 45-11-6 Rev 4 Placards and Markings - Replacement of Nose Strut Servicing Placards RE (-) Recommended 11 A/F Eff: 05-Jan-2015 Not Applicable NO WORK IS REQUIRED FOR AIRCRAFT WHICH HAVE COMPLIED WITH PREVIOUS ISSUES (AVG MAN HRS: 4) Mos 08-Jan-2015 Hrs 3,360 Ldg 1,961 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 9/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining 45-11-6 Rev 5 Placards and Markings - Replacement of Nose Strut Servicing Placards RE (-) Recommended 11 A/F Eff: 27-Feb-2017 Not Applicable (AVG MAN HRS: 4) Mos 29-Aug-2019 Hrs 4,516.2 Ldg 2,733 G1130000 Check brightness level of all self-luminous placards. RE TLMC 05-13-01 ≈24-Apr-2025 11 A/F 05-13-01 Alias1:11-30-00 (ZONE: 220) (Tol. Adjustment: -30d) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 11-30-00.)) Mos 09-Feb-2024 48 -/+14d (09-Jan-2028) 3.6 Years (+14 Days) Hrs 5,253.5 1,200 -/+25 (6,453.5) 1,178.7 Hrs (+25) Ldg 3,757 ▼ 12 - SERVICING - ROUTINE MAINTENANCE 45-12-1 Servicing - Installation of Remote Oxygen Servicing Provisions RE (-) Optional 12 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-12-1 Rev 1 Servicing - Installation of Remote Oxygen Servicing Provisions RE (-) Optional 12 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-12-1 Rev 2 Servicing - Installation of Remote Oxygen Servicing Provisions RE (-) Optional 12 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-12-1 Rev 3 Servicing - Installation of Remote Oxygen Servicing Provisions RE (-) Optional 12 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-12-1 Rev 4 Servicing - Installation of Remote Oxygen Servicing Provisions RE (-) Optional 12 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-12-1 Rev 5 Servicing - Installation of Remote Oxygen Servicing Provisions RE (-) Optional 12 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-12-1 Rev 6 Servicing - Installation of Remote Oxygen Servicing Provisions RE (-) Optional 12 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-12-1 Rev 7 Servicing - Installation of Remote Oxygen Servicing Provisions RE (-) Optional 12 A/F Eff: 30-Jul-2009 Not Applicable Mos 29-Aug-2019 Hrs 4,516.2 Ldg 2,733 AB1210060 Main Landing Gear Up-Lock Actuator - Lubricate RE TLMC 05-11-05 ≈24-Jul-2024 12 A/F Left05-11-05 3000H000-006 2317 Ref:12-21-01 (ZONE: 720BL) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 12-21-01)) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 AB1210060 Main Landing Gear Up-Lock Actuator - Lubricate RE TLMC 05-11-05 ≈24-Jul-2024 12 A/F Right05-11-05 3000H000-006 2031 Ref:12-21-01 (ZONE: 730BR) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 12-21-01.)) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 10/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining AW 12-001 Aircraft Upper Cabin Door Pin Lubrication RE (-) Advisory Wire 12 A/F Mos 13-Mar-2008 Hrs Ldg O1210002 Flap Actuators - Check oil level. RE TLMC 05-12-04 ≈24-Oct-2024 12 A/F 05-12-04 Alias1:12-21-03 (ZONE: 540/640) (Tol. Adjustment: -30d) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 12-21- 03.)) Mos 09-Feb-2024 24 -/+14d (09-Jan-2026) 1.6 Years (+14 Days) Hrs 5,253.5 600 -/+25 (5,853.5) 578.7 Hrs (+25) Ldg 3,757 Q1221064 Flap Actuator Joint (P/N 145673-1) - Apply Corrosion Preventive Compound (CPC). RE (N/A) TLMC 05-19-00 12 A/F Left Inboard 159174-1 Unknown Alias1:12-21-03 (ZONE: 540BL,540JL,540CL,540KL, 640BR,640JR,640CR,640KR) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 12-21-03.)) Mos 07-Apr-2013 Hrs 2,797.6 Ldg 1,647 Q1221064 Flap Actuator Joint (P/N 145673-1) - Apply Corrosion Preventive Compound (CPC). RE (N/A) TLMC 05-19-00 12 A/F Left Outboard 159174-1 Unknown Alias1:12-21-03 (ZONE: 540BL,540JL,540CL,540KL, 640BR,640JR,640CR,640KR) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 12-21-03.)) Mos 07-Apr-2013 Hrs 2,797.6 Ldg 1,647 Q1221064 Flap Actuator Joint (P/N 145673-1) - Apply Corrosion Preventive Compound (CPC). RE (N/A) TLMC 05-19-00 12 A/F Right Inboard 159174-1 Unknown Alias1:12-21-03 (ZONE: 540BL,540JL,540CL,540KL, 640BR,640JR,640CR,640KR) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 12-21-03.)) Mos 07-Apr-2013 Hrs 2,797.6 Ldg 1,647 Q1221064 Flap Actuator Joint (P/N 145673-1) - Apply Corrosion Preventive Compound (CPC). RE (N/A) TLMC 05-19-00 12 A/F Right Outboard 159174-1 Unknown Alias1:12-21-03 (ZONE: 540BL,540JL,540CL,540KL, 640BR,640JR,640CR,640KR) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 12-21-03.)) Mos 07-Apr-2013 Hrs 2,797.6 Ldg 1,647 U1210004 Flap Flexible Transmission Shafts - Hand Lubricate. RE TLMC 05-19-00 ≈14-Oct-2027 12 A/F (ZONE: 540/640) (SOURCE: MM-104, MM-105) (NOTE: Note: On Aircraft with over 4,800 Hours from C of A or from the last replacement date of the flexible drive shaft, perform at the next 1,200 Hour C-Phase (C4) inspection.) Mos 10-Feb-2021 Hrs 4,610.5 4,800 -/+25 9,410.5 4,135.7 Hrs (+25) Ldg 2,822 Y1210000 Nose Landing Gear Shock Strut - Check for Proper Fluid Level and Inflation Pressure. RE TLMC 05-11-05 ≈24-Jul-2024 12 A/F 05-11-05 Alias1:12-10-02 (ZONE: 710) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 12-10-02.)) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 Y1210001 Main Landing Gear Shock Struts - Check for Proper Fluid Level and Inflation Pressure. RE TLMC 05-11-05 ≈24-Jul-2024 12 A/F 05-11-05 Alias1:12-10-03 (ZONE: 720/730) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 12-10-03.)) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 Y1210003 Flap Actuator Ballnut - Lubricate. RE TLMC 05-11-04 ≈24-Jul-2024 12 A/F 05-11-04 Alias1:12-21-03 (ZONE: 540/640) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 12-21- 03.) Note: On aircraft that have exceeded 300 Hours total time, perform at next 300 Hour inspection.) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 Y1210005 Nose Landing Gear Trunnion Pin - Lubricate. RE TLMC 05-11-05 ≈24-Jul-2024 12 A/F 05-11-05 Ref:12-21-01 (ZONE: 710) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 12-21-01.)) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 11/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining Y1210006 Nose Landing Gear Actuator Attach Fitting - Lubricate. RE TLMC 05-11-05 ≈24-Jul-2024 12 A/F 05-11-05 Alias1:12-21-01 (ZONE: 710) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 12-21-01.)) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 Y1210007 Nose and Main Tires - Check for proper inflation. RE TLMC 05-11-05 ≈24-Jul-2024 12 A/F 05-11-05 Alias1:12-10-04 (ZONE: 710 720/730) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 12-10-04)) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 Y1210009 Nose Gear Door Hinge - Lubricate. RE TLMC 05-11-01 ≈24-Jul-2024 12 A/F 05-11-01 Alias1:12-21-02 (ZONE: 710) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 12- 21-02.)) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 Y1210011 Main Landing Gear Actuator Joints - Lubricate. RE TLMC 05-11-05 ≈24-Jul-2024 12 A/F 05-11-05 Alias1:12-21-01 (ZONE: 720/730) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 12-21-01.)) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 Y1210012 Main Landing Gear Axle Beam/Piston Joints - Lubricate. RE TLMC 05-11-05 ≈24-Jul-2024 12 A/F 05-11-05 Alias1:12-21-01 (ZONE: 720/730) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 12-21-01.)) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 Y1210013 Main Landing Gear Torque Links - Lubricate . RE TLMC 05-11-05 ≈24-Jul-2024 12 A/F 05-11-05 Alias1:12-21-01 (ZONE: 720/730) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 12-21-01.)) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 Y1210014 Main Gear Door Hinge - Lubricate. RE TLMC 05-11-05 ≈24-Jul-2024 12 A/F 05-11-05 Alias1:12-21-02 (ZONE: 720/730) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 12-21-02.)) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 Y1210016 Passenger/Crew Door Hinge - Lubricate. RE TLMC 05-11-06 ≈24-Jul-2024 12 A/F 05-11-06 Alias1:12-21-02 (ZONE: 810AL) (SOURCE: MM-104, MM-105) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 Y1210017 Passenger/Crew Door Pins - Lubricate. RE TLMC 05-11-06 ≈24-Jul-2024 12 A/F 05-11-06 Alias1:12-21-02 (ZONE: 810AL) (SOURCE: MM-104, MM-105) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 Y1210018 Passenger/Crew Door Tension Bolts - Lubricate. RE TLMC 05-11-06 ≈24-Jul-2024 12 A/F 05-11-06 Alias1:12-21-02 (ZONE: 810AL) (SOURCE: MM-104, MM-105) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 12/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining Y1210019 Emergency Exit Door Latching Mechanism - Lubricate. RE TLMC 05-11-06 ≈24-Jul-2024 12 A/F 05-11-06 Alias1:12-21-02 (ZONE: 820AR) (SOURCE: MM-104, MM-105) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 Y1210020 Emergency Exit Door Pins - Lubricate. RE TLMC 05-11-06 ≈24-Jul-2024 12 A/F 05-11-06 Alias1:12-21-02 (ZONE: 820AR) (SOURCE: MM-104, MM-105) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 Y1210021 Baggage Compartment Door Latch Pins - Lubricate. RE TLMC 05-11-06 ≈24-Jul-2024 12 A/F 05-11-06 Alias1:12-21-02 (ZONE: 830AR) (SOURCE: MM-104, MM-105) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 Y1210022 Baggage Compartment Door Hinge - Lubricate. RE TLMC 05-11-06 ≈24-Jul-2024 12 A/F 05-11-06 Alias1:12-21-02 (ZONE: 830AR) (SOURCE: MM-104, MM-105) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 Y1210023 Oxygen System Servicing Door Hinge - Lubricate. RE TLMC 05-11-01 ≈24-Jul-2024 12 A/F 05-11-01 Alias1:12-21-02 (ZONE: 120BR) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 12-21-02.)) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 Y1210024 Toilet Servicing Door Hinge - Lubricate. RE TLMC 05-11-04 ≈24-Jul-2024 12 A/F 05-11-04 Alias1:12-21-02 (ZONE: 610DR) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 12-21-02.)) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 Y1210025 Pressure Refueling Door Hinge - Lubricate. RE TLMC 05-11-02 ≈24-Jul-2024 12 A/F 05-11-02 Alias1:12-21-02 (ZONE: 300/ 310HR) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 12-21-02.)) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 Y1210026 Fuselage Fuel Filler Door Hinge - Lubricate. RE TLMC 05-11-02 ≈24-Jul-2024 12 A/F 05-11-02 Alias1:12-21-02 (ZONE: 300/ 310CR) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 12-21-02.)) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 Y1210027 Tailcone Access Door Pins - Lubricate. RE TLMC 05-11-06 ≈24-Jul-2024 12 A/F 05-11-06 Alias1:12-21-02 (ZONE: 840AR) (SOURCE: MM-104, MM-105) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 Y1210028 Tailcone Access Door Hinge - Lubricate. RE TLMC 05-11-06 ≈24-Jul-2024 12 A/F 05-11-06 Alias1:12-21-02 (ZONE: 840AR) (SOURCE: MM-104, MM-105) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 13/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining Y1210029 Main Landing Gear Trunnion Pin - Lubricate. RE TLMC 05-11-05 ≈24-Jul-2024 12 A/F 05-11-05 Alias1:12-21-01 (ZONE: 720/730) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 12-21-01.)) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 Y1221037 Flaps - Lubricate rolling surfaces of main and nose roller tracks. RE TLMC 05-11-04 ≈24-Jul-2024 12 A/F 05-11-04 Ref:12-21-03 (ZONE: 500/600) (SOURCE: MM-104, MM-105) (NOTE: (Effective on Aircraft 45-005 thru 45-367, 45-369 thru 45-445, (Effective on Aircraft 45-005 thru 45-367, 45-369 thru 45-445, 45-447 thru 45-451 not modified by SB45-27-46.)) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 Y1221042 Horizontal Stabilizer Upper and Lower Torque Links - Lubricate. RE TLMC 05-12-03 ≈24-Oct-2024 12 A/F 05-12-03 Ref:12-21-03 (ZONE: 330AC, 330BC, 330CC) (Tol. Adjustment: -30d) (SOURCE: MM-104, MM-105) (NOTE: (Effective on Aircraft 45-005 thru 45-241 modified by SB 45- 27-13, “Replacement of Upper and Lower Torque Link Assemblies”, and 45-242 and subsequent.)) Mos 09-Feb-2024 24 -/+14d (09-Jan-2026) 1.6 Years (+14 Days) Hrs 5,253.5 600 -/+25 (5,853.5) 578.7 Hrs (+25) Ldg 3,757 Y1227000 Emergency Park Brake Handle Shaft - Lubricate. RE TLMC 05-11-01 ≈24-Jul-2024 12 A/F 05-11-01 Ref:12-27-00 (ZONE: 200) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 12-27-00.)) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 ▼ 20 - STANDARD PRACTICES – AIRFRAME 45-20-1 Standard Practices - Modification of the Relay Panel Wire Harness Installation RE (-) Recommended 20 A/F Not Applicable PER A/C S/N Mos 08-Jun-2009 Hrs 801 Ldg 521 45-20-1 Rev 1 Standard Practices - Modification of the Relay Panel Wire Harness Installation RE (-) Recommended 20 A/F Eff: 09-Mar-2009 Not Applicable Mos 14-Dec-2020 Hrs 4,610.5 Ldg 2,822 45-20-2 Standard Practices - Inspection/Modification of Wire Chafe Behind Center Switch Panel (P5) RE (-) Optional 20 A/F Mos Hrs Ldg 45-20-2 Rev 1 Standard Practices - Inspection/Modification of Wire Chafe Behind Center Switch Panel (P5) RE (-) Optional 20 A/F Eff: 04-Mar-2013 Not Applicable DID NOT APPLY TO AIRCRAFT SERIAL NUMBER BUT DID ANY WAY Mos 07-Apr-2013 Hrs 2,797.6 Ldg 1,647 AW 20-007 Flight Compartment Window Maintenance/Cleaning RE (-) Advisory Wire 20 A/F Mos 13-Mar-2008 Hrs Ldg AW 20-008 Engine Hydraulic Line + Wiring Chafing RE (-) Advisory Wire 20 A/F Mos 13-Mar-2008 Hrs Ldg [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 14/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining ▼ 21 - AIR CONDITIONING AND PRESSURIZATION ACM Bypass Check Valve RE (O/C) 21 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 ACM Precooler Assembly RE (O/C) 21 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Air Conditioning Compressor RE (O/C) 21 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Air Conditioning Compressor Drive Motor RE (O/C) 21 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Air Cycle Machine RE (O/C) 21 A/F P14126 1412616819 Mos 24-Mar-2021 Hrs Ldg Air Cycle Machine Turbine RE (O/C) 21 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Avionics Cooling (B13) Fan RE (O/C) 21 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Bi-Level Pressure Regulating & Shutoff (L19) Valve RE (O/C) 21 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Blower Motor RE (O/C) 21 A/F Aft Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Blower Motor RE (O/C) 21 A/F Fwd Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 15/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining Cabin Air Check Valve RE (O/C) 21 A/F Left Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Cabin Air Check Valve RE (O/C) 21 A/F Right Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Cabin Duct Overtemp Limiter RE (O/C) 21 A/F 627962-2/N531-9056 627962-21177 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Cabin Overheat Thermostat RE (O/C) 21 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Cabin Pressure Controller RE (O/C) 21 A/F 2119858-10 27-50182 Repaired 0 Mos 14-Dec-2010 0 Hrs 1,704.2 0 Ldg 1,036 Cabin Pressurization Check Valve RE (O/C) 21 A/F 130158-3-1 77-A1025 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Cabin Refrigeration Condenser RE (O/C) 21 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Cabin Temp 28Vdc Sensor/Fan Assembly RE (O/C) 21 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Cabin Temperature Control Selector RE (O/C) 21 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Cabin Temperature Control Valve RE (O/C) 21 A/F 3291222-1 1065 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Cabin Temperature, Duct Sensor RE (O/C) 21 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 16/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining Cabin Temperature, Low Limit Sensor RE (O/C) 21 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Check, Ecs (3.0 Diameter) Valve RE (O/C) 21 A/F Left Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Check, Ecs (3.0 Diameter) Valve RE (O/C) 21 A/F Right Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Cockpit Air Check Valve RE (O/C) 21 A/F Left Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Cockpit Air Check Valve RE (O/C) 21 A/F Right Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Cockpit Duct Temperature Sensor RE (O/C) 21 A/F 627962-2/N531-9056 627962-21120 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Cockpit Overheat Thermostat RE (O/C) 21 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Cockpit Temperature Control Selector RE (O/C) 21 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Cockpit Temperature Control Valve RE (O/C) 21 A/F 3291222-1 1062 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Cockpit Temperature Sensor RE (O/C) 21 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Ecs Transition Duct RE (O/C) 21 A/F Left Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 17/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining Ecs Transition Duct RE (O/C) 21 A/F Right Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Emergency Pressure Aneroid Switch RE (O/C) 21 A/F E45C-47 5615 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Emergency Pressure Shutoff Valve RE (O/C) 21 A/F Left 3291224-1 1053 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Emergency Pressure Shutoff Valve RE (O/C) 21 A/F Right 3291224-1 1033 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Emergency Pressurization Isolation Check Valve RE (O/C) 21 A/F Left 3202744-1 2913 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Emergency Pressurization Isolation Check Valve RE (O/C) 21 A/F Right 3202744-1 2914 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Engine Ozone Converter RE (O/C) 21 A/F Left 4520000100-801 1900 New 0 Mos 22-Dec-2015 0 Hrs 3,621.8 0 Ldg 2,105 Engine Ozone Converter RE (O/C) 21 A/F Right 4520000100-801 1875 New 0 Mos 22-Dec-2015 0 Hrs 3,621.8 0 Ldg 2,105 Environmental Control Unit RE (O/C) 21 A/F 2215150-3 577 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Evaporator RE (O/C) 21 A/F Aft Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Evaporator RE (O/C) 21 A/F Fwd Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 18/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining Foot Warmer (S167) Thermostat RE (O/C) 21 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Gasper Air Check Valve RE (O/C) 21 A/F Left Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Gasper Air Check Valve RE (O/C) 21 A/F Right Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Heat, Primary, Secondary Exchanger RE (O/C) 21 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Integrated Ecs Temperature Controller RE (O/C) 21 A/F 6621000000-081 070C-0498 9 Mos 09-Oct-2012 Hrs 2,650.5 Ldg 1,567 Jet Pump Ejector RE (O/C) 21 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Left Heel Plate Assembly, Foot Warmer RE (O/C) 21 A/F Copilot Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Left Heel Plate Assembly, Foot Warmer RE (O/C) 21 A/F Pilot Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Linear Electro-Mechanical Actuator RE (O/C) 21 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Low Limit Temperature Control Valve RE (O/C) 21 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Mount Assy Fan Avionics Cooling RE (O/C) 21 A/F 4521208521-009 A00806543-01 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 19/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining Outflow, Secondary Valve RE (O/C) 21 A/F 6621300000-021 45-B0039 Repaired 0 Mos 08-Nov-2010 0 Hrs 1,639 0 Ldg 995 Plenum Check Valve RE (O/C) 21 A/F Left 6621000000-037 3835 New 0 Mos 28-Apr-2009 0 Hrs 753 0 Ldg 494 Plenum Check Valve RE (O/C) 21 A/F Right 6621000000-037 3947 New 0 Mos 28-Apr-2009 0 Hrs 753 0 Ldg 494 Pressure Switch RE (O/C) 21 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Primary Outflow Valve RE (O/C) 21 A/F 103858-1 89-A0164 Repaired 0 Mos 11-Mar-2011 0 Hrs 1,857.4 0 Ldg 1,121 Regulating, Servo Air Pressure Valve RE (O/C) 21 A/F 6600245-004 1717 New Mos 14-Jan-2022 Hrs 4,857.3 Ldg 2,991 Right Heel Plate Assembly, Foot Warmer RE (O/C) 21 A/F Copilot Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Right Heel Plate Assembly, Foot Warmer RE (O/C) 21 A/F Pilot Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Servo Air Pressure Regulating Valve RE (O/C) 21 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Tailcone Check Valve RE (O/C) 21 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Thermal Control Actuator RE (O/C) 21 A/F No.1 Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 20/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining Thermal Control Actuator RE (O/C) 21 A/F No.2 Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Water Separator Assembly RE (O/C) 21 A/F 2341168-1 109-214 Overhauled 0 Mos 09-May-2008 0 Hrs 125.6 0 Ldg 102 Water Seperator Bypass Valve RE (O/C) 21 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 2002-17-01 Foot Warm Circuit Breaker RE (-) Mandatory 21 A/F Eff: 12-Sep-2002 Not Applicable BY SERIAL NUMBER Mos 11-Feb-2010 Hrs 1,203.8 Ldg 739 2017-06-03 Paragraph (g) Heating System - Inspection and Pressure Decay Test (PDT) of the Combustion Heater RE (-) Mandatory (Appliance AD) 21 A/F Eff: 05-May-2017 Mos Hrs Ldg 2017-06-03 Paragraph (k) Heating System - Disable or Removal of the Combustion Heater RE (-) Mandatory (Appliance AD) 21 A/F Eff: 05-May-2017 Mos Hrs Ldg 45-21-1 Air Conditioning - Installation of Aft Lavatory Cabin Air Plenum RE (-) Optional 21 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-21-1 Rev 1 Air Conditioning - Installation of Aft Lavatory Cabin Air Plenum RE (-) Optional 21 A/F Eff: 11-Jan-2002 Not Applicable Mos 29-Aug-2019 Hrs 4,516.2 Ldg 2,733 45-21-10 Air Conditioning - Replacement of Cabin Overhead Registers RE (-) Optional 21 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-21-10 Rev 1 Air Conditioning - Replacement of Cabin Overhead Registers RE (-) Optional 21 A/F Eff: 09-Mar-2005 Not Applicable Mos 29-Aug-2019 Hrs 4,516.2 Ldg 2,733 45-21-11 Air Conditioning - Installation of Cabin Pressure Controller Bonding Jumper RE (-) Recommended 21 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-21-11 Rev 1 Air Conditioning - Installation of Cabin Pressure Controller Bonding Jumper RE (-) Recommended 21 A/F Eff: 12-Apr-2002 Not Applicable Mos 14-Dec-2020 Hrs 4,610.5 Ldg 2,822 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 21/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining 45-21-12 Air Conditioning - Reactivation of Auxiliary Cabin Heat RE (-) Recommended 21 A/F Eff: 23-Jan-2004 Not Applicable Mos 14-Dec-2020 Hrs 4,610.5 Ldg 2,822 45-21-13 Air Conditioning - Upgrade of the Cabin Pressure Controller RE (-) Recommended 21 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-21-13 Rev 1 Air Conditioning - Upgrade of the Cabin Pressure Controller RE (-) Recommended 21 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-21-13 Rev 2 Air Conditioning - Upgrade of the Cabin Pressure Controller RE (-) Recommended 21 A/F Eff: 11-Aug-2004 Not Applicable Mos 14-Dec-2020 Hrs 4,610.5 Ldg 2,822 45-21-15 Air Conditioning - Replacement/Modification of the Pilot and Copilot Heel Plate Assemblies RE (-) Recommended 21 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-21-15 Rev 1 Air Conditioning - Replacement/Modification of the Pilot and Copilot Heel Plate Assemblies RE (-) Recommended 21 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-21-15 Rev 2 Air Conditioning - Replacement/Modification of the Pilot and Copilot Heel Plate Assemblies RE (-) Recommended 21 A/F Eff: 25-Nov-2003 Not Applicable Mos 14-Dec-2020 Hrs 4,610.5 Ldg 2,822 45-21-16 Air Conditioning - Installation of Pneumatic Tube Assembly Filters RE (-) Recommended 21 A/F Eff: 22-Jul-2003 Not Applicable Mos 14-Dec-2020 Hrs 4,610.5 Ldg 2,822 45-21-17 Air Conditioning - Improvement of Keith R-134A Optional Heating/Cooling System RE (-) Recommended 21 A/F Eff: 29-Jul-2005 Not Applicable Mos 14-Dec-2020 Hrs 4,610.5 Ldg 2,822 45-21-18 Air Conditioning - Installation of ECS Diverter Doors RE (-) Optional 21 A/F Mos Hrs Ldg 45-21-18 Rev 1 Air Conditioning - Installation of ECS Diverter Doors T (A/R) Optional 21 A/F Eff: 19-Jan-2009 Mos Hrs Ldg 45-21-19 Air Conditioning - Cabin Air Supply Duct Assembly Domenut Replacement T (-) Optional 21 A/F Eff: 16-Jun-2008 Mos Hrs Ldg 45-21-19 Rev 1 Air Conditioning - Cabin Air Supply Duct Assembly Domenut Replacement T (A/R) Optional 21 A/F Eff: 22-May-2017 (AVG MAN HRS: 90) Mos Hrs Ldg [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 22/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining 45-21-2 Air Conditioning - Installation of Improved Cockpit Foot Warmers RE (-) Recommended 21 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-21-2 Rev 1 Air Conditioning - Installation of Improved Cockpit Foot Warmers RE (-) Recommended 21 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-21-2 Rev 2 Air Conditioning - Installation of Improved Cockpit Foot Warmers RE (-) Recommended 21 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-21-2 Rev 3 Air Conditioning - Installation of Improved Cockpit Foot Warmers RE (-) Recommended 21 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-21-2 Rev 4 Air Conditioning - Installation of Improved Cockpit Foot Warmers RE (-) Recommended 21 A/F Eff: 19-Mar-2004 Not Applicable Mos 14-Dec-2020 Hrs 4,610.5 Ldg 2,822 45-21-20 Air Conditioning - Inspection/Replacement of PerkinElmer Bleed Air Couplings in the Anti-Ice System RE (-) Recommended 21 A/F Eff: 12-Apr-2006 Not Applicable Mos 14-Dec-2020 Hrs 4,610.5 Ldg 2,822 45-21-21 Air Conditioning - Inspection/Modification of the Keith Products R-134A System Wiring RE (-) Recommended 21 A/F Eff: 26-Nov-2007 Not Applicable Mos 14-Dec-2020 Hrs 4,610.5 Ldg 2,822 45-21-22 Air Conditioning - Modification of the Keith Products Heating Power/Ground Contact Installation RE (-) Recommended 21 A/F Eff: 21-May-2007 Not Applicable Mos 14-Dec-2020 Hrs 4,610.5 Ldg 2,822 45-21-23 Air Conditioning - Modification of the Cabin Blower Circuit Wiring RE (-) Recommended 21 A/F Eff: 18-May-2009 (AVG MAN HRS: 7) Mos Hrs Ldg 45-21-23 Rev 1 Air Conditioning - Modification of the Cabin Blower Circuit Wiring RE (-) Recommended 21 A/F Eff: 29-Nov-2010 Not Applicable (AVG MAN HRS: 7) Mos 14-Dec-2020 Hrs 4,610.5 Ldg 2,822 45-21-24 Air Conditioning - Replacement of Keith Products Air Conditioning Terminal Lugs RE (-) Recommended 21 A/F Eff: 21-Sep-2009 (AVG MAN HRS: 65) Mos Hrs Ldg 45-21-24 Rev 1 Air Conditioning - Replacement of Keith Products Air Conditioning Terminal Lugs RE (-) Recommended 21 A/F Eff: 11-Jan-2010 (AVG MAN HRS: 65) Mos Hrs Ldg 45-21-24 Rev 2 Air Conditioning - Replacement of Keith Products Air Conditioning Terminal Lugs RE (-) Recommended 21 A/F Eff: 16-Aug-2010 (AVG MAN HRS: 65) Mos Hrs Ldg [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 23/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining 45-21-24 Rev 3 Air Conditioning - Replacement of Keith Products Air Conditioning Terminal Lugs RE (-) Recommended 21 A/F Eff: 01-Dec-2010 Not Applicable (AVG MAN HRS: 65) Mos 14-Dec-2020 Hrs 4,610.5 Ldg 2,822 45-21-25 Air Conditioning - Modification of the Environmental Control System (ECS) Plenum Assembly Duct Flange RE (-) Recommended 21 A/F Eff: 01-Aug-2011 (AVG MAN HRS: 20) Mos Hrs Ldg 45-21-25 Rev 1 Air Conditioning - Modification of the Environmental Control System (ECS) Plenum Assembly Duct Flange RE (-) Recommended 21 A/F Eff: 30-Jan-2012 Complied With MODIFICATION OF THE ENVIRONMENTAL CONTROL SYATTEM (ECS) PLENUM ASSEMBLY DUCT FLANGE (AVG MAN HRS: 20) Mos 14-May-2012 Hrs 2,466.6 Ldg 1,468 45-21-26 Air Conditioning - Inspection of Air Conditioning System Power Distribution Panel RE (-) Recommended 21 A/F Eff: 25-Nov-2013 Not Applicable (AVG MAN HRS: 5) Mos 14-Dec-2020 Hrs 4,610.5 Ldg 2,822 45-21-27 Air Conditioning - Baggage Compartment Heater Replacement - Special Spares Kit T (A/R) Optional 21 A/F Eff: 07-Jul-2014 Mos Hrs Ldg 45-21-28 Air Conditioning - Cabin Pressure Controller Inspection/Replacement RE (-) Recommended 21 A/F Eff: 29-Sep-2014 Not Applicable (AVG MAN HRS: 13) Mos 14-Dec-2020 Hrs 4,610.5 Ldg 2,822 45-21-3 Air Conditioning - Relocation of Baggage Heater Switch RE (-) Optional 21 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-21-3 Rev 1 Air Conditioning - Relocation of Baggage Heater Switch RE (-) Optional 21 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-21-3 Rev 2 Air Conditioning - Relocation of Baggage Heater Switch RE (-) Optional 21 A/F Eff: 12-Apr-2002 Not Applicable Mos 29-Aug-2019 Hrs 4,516.2 Ldg 2,733 45-21-4 Air Conditioning - Modification of the Environmental Control System for Reduced Cabin Noise Levels RE (-) Recommended 21 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-21-4 Rev 1 Air Conditioning - Modification of the Environmental Control System for Reduced Cabin Noise Levels RE (-) Recommended 21 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-21-4 Rev 2 Air Conditioning - Modification of the Environmental Control System for Reduced Cabin Noise Levels RE (-) Recommended 21 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 24/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining 45-21-4 Rev 3 Air Conditioning - Modification of the Environmental Control System for Reduced Cabin Noise Levels RE (-) Recommended 21 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-21-4 Rev 4 Air Conditioning - Modification of the Environmental Control System for Reduced Cabin Noise Levels RE (-) Recommended 21 A/F Eff: 20-Nov-2003 Not Applicable Mos 14-Dec-2020 Hrs 4,610.5 Ldg 2,822 45-21-4 Rev 5 Air Conditioning - Modification of the Environmental Control System for Reduced Cabin Noise Levels RE (-) Recommended 21 A/F Eff: 12-Jun-2023 (AVG MAN HRS: 35) Mos Hrs Ldg 45-21-5 Air Conditioning - Installation of ECS Diverter Doors RE (-) Recommended 21 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-21-5 Rev 1 Air Conditioning - Installation of ECS Diverter Doors RE (-) Recommended 21 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-21-5 Rev 2 Air Conditioning - Installation of ECS Diverter Doors RE (-) Recommended 21 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-21-5 Rev 3 Air Conditioning - Installation of ECS Diverter Doors RE (-) Recommended 21 A/F Eff: 19-Jan-2009 Not Applicable Mos 14-Dec-2020 Hrs 4,610.5 Ldg 2,822 45-21-6 Air Conditioning - Restrictor Plate Installation RE (-) Optional 21 A/F Not Applicable PER THIS EQUIPMENT NOT INSTALLED ON THIS AIRCRAFT Mos 17-Jan-2014 Hrs 3,055.8 Ldg 1,792 45-21-6 Rev 1 Air Conditioning - Restrictor Plate Installation RE (-) Optional 21 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-21-6 Rev 2 Air Conditioning - Restrictor Plate Installation RE (-) Optional 21 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-21-6 Rev 3 Air Conditioning - Restrictor Plate Installation RE (-) Optional 21 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-21-6 Rev 4 Air Conditioning - Restrictor Plate Installation RE (-) Optional 21 A/F Eff: 11-Feb-2005 Not Applicable Mos 29-Aug-2019 Hrs 4,516.2 Ldg 2,733 45-21-7 Air Conditioning - Inspection of Check Valve RE (-) Recommended 21 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 25/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining 45-21-7 Rev 1 Air Conditioning - Inspection of Check Valve RE (-) Recommended 21 A/F Eff: 12-Oct-2001 Not Applicable Mos 14-Dec-2020 Hrs 4,610.5 Ldg 2,822 45-21-8 Air Conditioning - Installation of Environmental Control System Noise Reduction Kit RE (-) Optional 21 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-21-8 Rev 1 Air Conditioning - Installation of Environmental Control System Noise Reduction Kit RE (-) Optional 21 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-21-8 Rev 2 Air Conditioning - Installation of Environmental Control System Noise Reduction Kit RE (-) Optional 21 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-21-8 Rev 3 Air Conditioning - Installation of Environmental Control System Noise Reduction Kit RE (-) Optional 21 A/F Eff: 06-Jul-2009 Not Applicable Mos 29-Aug-2019 Hrs 4,516.2 Ldg 2,733 A45-21-14 Electrical Power - Deactivation of Cockpit Foot Warmers RE (-) Alert 21 A/F Eff: 24-May-2002 Not Applicable (AVG MAN HRS: 0.5) Mos 14-Dec-2020 Hrs 4,610.5 Ldg 2,822 A45-21-9 Air Conditioning - Deactivation of Auxiliary Cabin Heat RE (-) Alert 21 A/F Eff: 27-Feb-2001 Not Applicable BY SERIAL NUMBER (AVG MAN HRS: 3.5) Mos 13-Mar-2008 Hrs Ldg A45-21-9 Rev 1 Air Conditioning - Deactivation of Auxiliary Cabin Heat RE (-) Alert 21 A/F Eff: 18-Jun-2003 Not Applicable (AVG MAN HRS: 3.5) Mos 14-Dec-2020 Hrs 4,610.5 Ldg 2,822 AW 21-004 Uncommanded Cabin Altitude Increase RE (-) Advisory Wire 21 A/F Mos 13-Mar-2008 Hrs Ldg AW 21-006 Learjet 45 Foot Warmer Reactivation RE (-) Advisory Wire 21 A/F Mos 13-Mar-2008 Hrs Ldg AW 21-010 Inspection of Keith Products Air Conditioning Power Panel Hardware RE (-) Advisory Wire 21 A/F Not Applicable WE DO NOT HAVE THIS SYSTEM. Mos Hrs Ldg AW21-010 Inspection of Keith Products - Air Conditioning Power - Panel Hardware RE (-) Mandatory 21 A/F Eff: 02-Aug-2013 Not Applicable WE DO NOT HAVE THIS SYSTEM Mos Hrs Ldg [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 26/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining J2160007 Temperature Control System - Inspect and clean cabin and cockpit temperature control valve servo air filters. RE TLMC 05-12-02 ≈24-Oct-2024 21 A/F 05-12-02 Alias1:21-60-11 (ZONE: 300) (Tol. Adjustment: -30d) (SOURCE: MM-104) (NOTE: (Refer to 21-60-11.)) Mos 09-Feb-2024 24 -/+14d (09-Jan-2026) 1.6 Years (+14 Days) Hrs 5,253.5 600 -/+25 (5,853.5) 578.7 Hrs (+25) Ldg 3,757 L2150054 Air Conditioning Compressor Drive Motor Brushes - Perform Wear Inspection. (Return Drive Motor to authorized service facility for overhaul.) RE (N/A) TLMC 05-19-00 21 A/F (ZONE: 300) (SOURCE: MM-104, MM-105) (NOTE: (Effective on Aircraft 45-250 and subsequent equipped with Keith Products vapor cycle air conditioning system using refrigerant R-134.)) Mos Hrs Ldg L2150055 Air Conditioning Compressor Motor - Perform Overhaul. (Return Drive Motor to authorized service facility for overhaul.) RE (N/A) TLMC 05-19-00 21 A/F Unknown Unknown (ZONE: 300) (SOURCE: MM-104, MM-105) (NOTE: (Effective on Aircraft 45-250 and subsequent equipped with Keith Products vapor cycle air conditioning system using refrigerant R-134.)) Mos Hrs Ldg L2150056 ** Auxiliary Heat System - Perform Functional Test. RE TLMC 04-10-00, TLMC 05-12-02, Ch.5 Interval ≈24-Oct-2024 21 A/F 05-12-02 Alias1:21-51-00 (ZONE: 300) (Tol. Adjustment: -30d) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 21-51-00.) (Effective on Aircraft 45-250 and subsequent equipped with Keith Products vapor cycle air conditioning system using refrigerant R-134.)) Mos 09-Feb-2024 24 -/+14d (09-Jan-2026) 1.6 Years (+14 Days) Hrs 5,253.5 600 -/+25 (5,853.5) 578.7 Hrs (+25) Ldg 3,757 L2150057 ** Auxiliary Heat System - Perform Auxiliary Heater Electrical and Temperature Switch Test. RE TLMC 04-10-00, TLMC 05-13-02, Ch.5 Interval ≈24-Apr-2025 21 A/F 05-13-02 Alias1:21-51-00 (ZONE: 300) (Tol. Adjustment: -30d) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 21-51-00.) (Effective on Aircraft 45-250 and subsequent equipped with Keith Products vapor cycle air conditioning system using refrigerant R-134.)) Mos 09-Feb-2024 48 -/+14d (09-Jan-2028) 3.6 Years (+14 Days) Hrs 5,253.5 1,200 -/+25 (6,453.5) 1,178.7 Hrs (+25) Ldg 3,757 O2130000 Primary and Secondary Outflow Valves - Perform Inspection. RE TLMC 05-13-01 ≈24-Apr-2025 21 A/F 05-13-01 Alias1:21-30-01, 21-30-02 (ZONE: 210) (Tol. Adjustment: -30d) (SOURCE: MM-104, MM-105) (NOTE: (refer to 21-30-01 and 21-30-02)) Mos 09-Feb-2024 48 -/+14d (09-Jan-2028) 3.6 Years (+14 Days) Hrs 5,253.5 1,200 -/+25 (6,453.5) 1,178.7 Hrs (+25) Ldg 3,757 O2130001 Outflow Valve Air Filter - Remove and replace. RE TLMC 05-14-01 ≈12-Oct-2025 21 A/F 05-14-01 Alias1:21-30-04 (ZONE: 210) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 21-30-04.)) Mos 10-Feb-2021 96 -/+14d (10-Feb-2029) 4.7 Years (+14 Days) Hrs 4,610.5 2,400 -/+25 (7,010.5) 1,735.7 Hrs (+25) Ldg 2,822 O2130002 ** Pressurization Control System - Perform Functional Test. RE TLMC 04-10-00, TLMC 05-13-01, Ch.5 Interval ≈24-Apr-2025 21 A/F 05-13-01 Alias1:21-30-00 (ZONE: 220) (Tol. Adjustment: -30d) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 21-30-00.)) Mos 09-Feb-2024 48 -/+14d (09-Jan-2028) 3.6 Years (+14 Days) Hrs 5,253.5 1,200 -/+25 (6,453.5) 1,178.7 Hrs (+25) Ldg 3,757 WYB-2022-02-15-02 RE/RE SENSOR, DUCT TEMP (COCKPIT) RE (-) 21 A/F 6600423-4 Unknown (AVG MAN HRS: 6) (UPDATE NOTE: SENSOR BENCH CHECKED SERVICEABLE. UNIT TO BE RE INSTALLED IN COCKPIT DUCT.) Mos 03-Mar-2022 Hrs 4,883 Ldg 3,012 Y2130003 Pressurization Control System - Perform Operational Check. RE TLMC 05-12-01 ≈24-Oct-2024 21 A/F 05-12-01 Alias1:21-30-00 (ZONE: 220) (Tol. Adjustment: -30d) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 21-30-00.)) Mos 09-Feb-2024 24 -/+14d (09-Jan-2026) 1.6 Years (+14 Days) Hrs 5,253.5 600 -/+25 (5,853.5) 578.7 Hrs (+25) Ldg 3,757 Y2130065 Cabin Pressurization System - Perform Cabin Leakage Test. RE TLMC 05-19-00 ≈05-Oct-2024 21 A/F Alias1:21-30-00 (ZONE: 200) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 21-30-00.)) Mos 22-May-2020 Hrs 4,593.2 1,200 -/+25 5,793.2 518.4 Hrs (+25) Ldg 2,809 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 27/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining Y2140000 Air Cycle Machine Heat Exchanger Inlet - Perform visual inspection. RE TLMC 05-13-02 ≈24-Apr-2025 21 A/F 05-13-02 Alias1:5-10-00 (ZONE: 310FR) (Tol. Adjustment: -30d) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 5-10-00.)) Mos 09-Feb-2024 48 -/+14d (09-Jan-2028) 3.6 Years (+14 Days) Hrs 5,253.5 1,200 -/+25 (6,453.5) 1,178.7 Hrs (+25) Ldg 3,757 Y2140001 Ozone Converters - Perform Efficiency Test. RE TLMC 05-19-00 ≈15-Dec-2025 21 A/F Left 4520000100-801 1900 Ref:05-19-01 (ZONE: 340FL, 340FR, 340CL, 340CR) (SOURCE: MM-104, MM-105) (NOTE: NOTE: Ship ozone converter to RSA Engineered Products, 110-A W. Cochran St., Simi Valley, California (93065), for cleaning and efficiency testing.) Mos 22-Dec-2015 Hrs 3,621.8 3,600 -/+25 7,221.8 1,947 Hrs (+25) Ldg 2,105 Y2140001 Ozone Converters - Perform Efficiency Test. RE TLMC 05-19-00 ≈15-Dec-2025 21 A/F Right 4520000100-801 1875 Ref:05-19-01 (ZONE: 340FL, 340FR, 340CL, 340CR) (SOURCE: MM-104, MM-105) (NOTE: NOTE: Ship ozone converter to RSA Engineered Products, 110-A W. Cochran St., Simi Valley, California (93065), for cleaning and efficiency testing.) Mos 22-Dec-2015 Hrs 3,621.8 3,600 -/+25 7,221.8 1,947 Hrs (+25) Ldg 2,105 Y2141000 Environmental Control Unit - Perform visual inspection. RE TLMC 05-13-02 ≈24-Apr-2025 21 A/F 05-13-02 Alias1:5-10-00 (ZONE: 310HL, 310QR) (Tol. Adjustment: -30d) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 5-10-00.)) Mos 09-Feb-2024 48 -/+14d (09-Jan-2028) 3.6 Years (+14 Days) Hrs 5,253.5 1,200 -/+25 (6,453.5) 1,178.7 Hrs (+25) Ldg 3,757 Y2141001 Water Separator Coalescer Bag - Perform Visual Inspection. Clean if necessary. RE TLMC 05-11-02 ≈24-Jul-2024 21 A/F 05-11-02 Alias1:5-10-00 (ZONE: 310HL, 310RR) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 5-10-00.) Note: The servicing activity may require a more frequent interval, depending on environmental and operational requirements, and should be adjusted by individual operators.) Mos 09-Feb-2024 12 -/+14d (09-Feb-2025) 8.7 Months (+14 Days) Hrs 5,253.5 300 -/+25 (5,553.5) 278.7 Hrs (+25) Ldg 3,757 Y2141002 Water Separator Coalescer Bag - Replace. RE (-) TLMC 05-19-01 21 A/F Brand C:Y2141002 (ZONE: 310HL, 310RR) (SOURCE: MM-104, MM-105) Mos 18-Mar-2009 Hrs 697.2 Ldg 470 Y2142000 Baggage Compartment Heating System - Perform Functional Test. RE TLMC 05-14-02 ≈12-Oct-2025 21 A/F 05-14-02 Alias1:21-40-00 (ZONE: 310) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 21-40-00.)) Mos 10-Feb-2021 96 -/+14d (10-Feb-2029) 4.7 Years (+14 Days) Hrs 4,610.5 2,400 -/+25 (7,010.5) 1,735.7 Hrs (+25) Ldg 2,822 Y2145000 ECS Plenum Assembly Check Valves - Perform visual inspection. Verify freedom of movement of butterfly assembly. RE TLMC 05-13-02 ≈24-Apr-2025 21 A/F 05-13-02 Alias1:21-20-03, 21-20-09 (ZONE: 310) (Tol. Adjustment: -30d) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 21-20-03 for the Emergency Pressurization Isolation Check Valve.) (Refer to 21-20-09 for Plenum Assembly Check Valve.)) Mos 09-Feb-2024 48 -/+14d (09-Jan-2028) 3.6 Years (+14 Days) Hrs 5,253.5 1,200 -/+25 (6,453.5) 1,178.7 Hrs (+25) Ldg 3,757 Y2150058 Perform visual inspection of air conditioning system components, including compressor motor belt for wear and proper V-belt tension, condenser coils for cleanliness and hoses for chafing and wear. If oil leaks are visible and/or refrigerant dumped, check compressor oil level (some leakage is allowable around shaft.) RE TLMC 05-13-02 ≈24-Apr-2025 21 A/F 05-13-02 Alias1:5-10-00 (ZONE: 300) (Tol. Adjustment: -30d) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 5-10- 00.) (Effective on Aircraft 45-250 and Subsequent equipped with Keith Products vapor cycle air conditioning system using refrigerant R-134.)) Mos 09-Feb-2024 48 -/+14d (09-Jan-2028) 3.6 Years (+14 Days) Hrs 5,253.5 1,200 -/+25 (6,453.5) 1,178.7 Hrs (+25) Ldg 3,757 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 28/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining Y2150059 Air Conditioning System - Perform Load Shed Assembly Check. RE TLMC 05-13-02 ≈24-Apr-2025 21 A/F 05-13-02 Alias1:21-51-00 (ZONE: 300) (Tol. Adjustment: -30d) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 21-51-00.) (Effective on Aircraft 45-250 and subsequent equipped with Keith Products vapor cycle air conditioning system using refrigerant R-134.)) Mos 09-Feb-2024 48 -/+14d (09-Jan-2028) 3.6 Years (+14 Days) Hrs 5,253.5 1,200 -/+25 (6,453.5) 1,178.7 Hrs (+25) Ldg 3,757 ▼ 22 - AUTOFLIGHT Autopilot, Pitch Servo RE (O/C) 22 A/F 4006719-923 0705H764 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Autopilot, Roll Servo RE (O/C) 22 A/F 4006719-949 0701H564 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Autopilot, Yaw Servo RE (O/C) 22 A/F 7012919-904 0510H008 Repaired 0 Mos 30-Nov-2009 0 Hrs 1,072.6 0 Ldg 667 Flight Guidance, Autopilot Controller RE (O/C) 22 A/F 7021170-901 02021113 4 Mos 27-Apr-2012 Hrs Ldg Servo, Pitch Bracket RE (O/C) 22 A/F 4005842 0701H615 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Servo, Roll Bracket RE (O/C) 22 A/F 4005842 0612H579 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Servo, Yaw Bracket RE (O/C) 22 A/F 7012098-902 0705H060 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Yaw Force, Rudder Boost System Sensor RE (O/C) 22 A/F Pilot Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Yaw Force, Rudder Boost System. Sensor RE (O/C) 22 A/F Copilot Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 29/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining Yaw Interface Unit RE (O/C) 22 A/F 4522108501-013 884003 Repaired 0 Mos 06-Jul-2011 0 Hrs 2,059.6 0 Ldg 1,239 2000-05-24 Honeywell KAP 140/KFC 225 Autopilot System RE (-) Mandatory (Appliance AD) 22 A/F Eff: 12-Apr-2000 Complied With AT MANUFACTURE Mos 13-Mar-2008 Hrs 8.7 Ldg 8 2001-10-09 Automatic Flight Control Systems RE (-) Mandatory (Appliance AD) 22 A/F Eff: 15-Jun-2001 Not Applicable Mos 31-Mar-2008 Hrs 11.6 Ldg 11 2002-22-13 Rockwell Collins, Inc. - Flight management computers (FMC) RE (-) Mandatory (Appliance AD) 22 A/F Eff: 20-Dec-2002 Not Applicable Mos 31-Mar-2008 Hrs 11.6 Ldg 11 45-22-1 Auto Flight - Honeywell Phase II/IIA Software Upgrade RE (-) Optional 22 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-22-1 Rev 1 Auto Flight - Honeywell Phase II/IIA Software Upgrade RE (-) Optional 22 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-22-1 Rev 2 Auto Flight - Honeywell Phase II/IIA Software Upgrade RE (-) Optional 22 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-22-1 Rev 3 Auto Flight - Honeywell Phase II/IIA Software Upgrade RE (-) Optional 22 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-22-1 Rev 4 Auto Flight - Honeywell Phase II/IIA Software Upgrade RE (-) Optional 22 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-22-1 Rev 5 Auto Flight - Honeywell Phase II/IIA Software Upgrade RE (-) Optional 22 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-22-1 Rev 6 Auto Flight - Honeywell Phase II/IIA Software Upgrade RE (-) Optional 22 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-22-1 Rev 7 Auto Flight - Honeywell Phase II/IIA Software Upgrade RE (-) Optional 22 A/F Eff: 08-Dec-2000 Not Applicable Mos 29-Aug-2019 Hrs 4,516.2 Ldg 2,733 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 30/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining 45-22-10 Auto Flight - Honeywell Phase VI Avionics Upgrade RE (-) Recommended 22 A/F Complied With Mos 21-Sep-2009 Hrs 959.2 Ldg 607 45-22-10 Rev 1 Auto Flight - Honeywell Phase VI Avionics Upgrade RE (-) Recommended 22 A/F Mos Hrs Ldg 45-22-10 Rev 2 Auto Flight - Honeywell Phase VI Avionics Upgrade RE (-) Recommended 22 A/F Eff: 20-Apr-2009 Complied With Mos 21-Sep-2009 Hrs 959.2 Ldg 607 45-22-11 Auto Flight - Inspection/Replacement of Safety Wire or Cable on the Aileron Servo Cable Lower Quadrant RE (-) Recommended 22 A/F Eff: 17-Mar-2014 Complied With (AVG MAN HRS: 3) Mos 29-Apr-2014 Hrs 3,155.3 Ldg 1,843 45-22-12 Auto Flight - Modification of Garmin Servo Actuator Mounts RE (-) Recommended 22 A/F Eff: 18-Aug-2014 Not Applicable (AVG MAN HRS: 6) Mos 14-Dec-2020 Hrs 4,610.5 Ldg 2,822 45-22-2 Auto Flight - Installation of Yaw Damper Disconnect Resistor RE (-) Optional 22 A/F Eff: 16-Apr-1999 Not Applicable Mos 29-Aug-2019 Hrs 4,516.2 Ldg 2,733 45-22-3 Auto Flight - Replacement of Autopilot Yaw Servo RE (-) Optional 22 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-22-3 Rev 1 Auto Flight - Replacement of Autopilot Yaw Servo RE (-) Optional 22 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-22-3 Rev 2 Auto Flight - Replacement of Autopilot Yaw Servo RE (-) Optional 22 A/F Eff: 16-Feb-2001 Not Applicable Mos 29-Aug-2019 Hrs 4,516.2 Ldg 2,733 45-22-4 Auto Flight - Honeywell Phase III Software Upgrade RE (-) Recommended 22 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-22-4 Rev 1 Auto Flight - Honeywell Phase III Software Upgrade RE (-) Recommended 22 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-22-4 Rev 2 Auto Flight - Honeywell Phase III Software Upgrade RE (-) Recommended 22 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-22-4 Rev 3 Auto Flight - Honeywell Phase III Software Upgrade RE (-) Recommended 22 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 31/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining 45-22-4 Rev 4 Auto Flight - Honeywell Phase III Software Upgrade RE (-) Recommended 22 A/F Eff: 17-May-2002 Not Applicable Mos 14-Dec-2020 Hrs 4,610.5 Ldg 2,822 45-22-5 Auto Flight - Honeywell Phase IV Upgrade RE (-) Recommended 22 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-22-5 Rev 1 Auto Flight - Honeywell Phase IV Upgrade RE (-) Recommended 22 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-22-5 Rev 2 Auto Flight - Honeywell Phase IV Upgrade RE (-) Recommended 22 A/F Eff: 29-Mar-2005 Not Applicable Mos 14-Dec-2020 Hrs 4,610.5 Ldg 2,822 45-22-6 Flight Controls - Modification of Rudder Force Sensor Installation & Routing RE (-) Optional 22 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-22-6 Rev 1 Flight Controls - Modification of Rudder Force Sensor Installation & Routing RE (-) Optional 22 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-22-6 Rev 2 Flight Controls - Modification of Rudder Force Sensor Installation & Routing RE (-) Optional 22 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-22-6 Rev 3 Flight Controls - Modification of Rudder Force Sensor Installation & Routing RE (-) Optional 22 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-22-6 Rev 4 Flight Controls - Modification of Rudder Force Sensor Installation & Routing RE (-) Optional 22 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-22-6 Rev 5 Flight Controls - Modification of Rudder Force Sensor Installation & Routing RE (-) Optional 22 A/F Eff: 02-Aug-2010 Not Applicable Mos 29-Aug-2019 Hrs 4,516.2 Ldg 2,733 45-22-7 Auto Flight - Honeywell Phase V Avionics Upgrade (IC-600 Integrated Computer Replacement) RE (-) Optional 22 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-22-7 Rev 1 Auto Flight - Honeywell Phase V Avionics Upgrade (IC-600 Integrated Computer Replacement) RE (-) Optional 22 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-22-7 Rev 2 Auto Flight - Honeywell Phase V Avionics Upgrade (IC-600 Integrated Computer Replacement) RE (-) Optional 22 A/F Eff: 24-Nov-2008 Mos Hrs Ldg [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 32/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining 45-22-8 Auto Flight - Honeywell Brakes Fail CAS Inhibit Accessory Kit RE (-) Optional 22 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-22-8 Rev 1 Auto Flight - Honeywell Brakes Fail CAS Inhibit Accessory Kit RE (-) Optional 22 A/F Mos Hrs Ldg 45-22-8 Rev 2 Auto Flight - Honeywell Brakes Fail CAS Inhibit Accessory Kit RE (-) Optional 22 A/F Eff: 20-Dec-2010 Mos Hrs Ldg 45-22-9 Autoflight - Honeywell Phase V Avionics Upgrade (On Aircraft Software Load) RE (-) Optional 22 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-22-9 Rev 1 Autoflight - Honeywell Phase V Avionics Upgrade (On Aircraft Software Load) RE (-) Optional 22 A/F Not Applicable BY SERIAL NUMBER Mos 13-Mar-2008 Hrs 8.7 Ldg 8 45-22-9 Rev 2 Autoflight - Honeywell Phase V Avionics Upgrade (On Aircraft Software Load) RE (-) Optional 22 A/F Eff: 24-Nov-2008 Mos Hrs Ldg A2210033 ** Autopilot System - Perform Autopilot Disconnect Tone Test. RE TLMC 04-10-00, TLMC 05-12-01, Ch.5 Interval ≈24-Oct-2024 22 A/F 05-12-01 Alias1:22-10-00 (ZONE: 220) (Tol. Adjustment: -30d) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 22-10-00.)) Mos 09-Feb-2024 24 -/+14d (09-Jan-2026) 1.6 Years (+14 Days) Hrs 5,253.5 600 -/+25 (5,853.5) 578.7 Hrs (+25) Ldg 3,757 AW 22-004 Honeywell Primus 1000 as Installed In Model 45 RE (-) Advisory Wire 22 A/F Mos 13-Mar-2008 Hrs Ldg AW 22-005 Honeywell Phase III Program Information RE (-) Advisory Wire 22 A/F Mos 13-Mar-2008 Hrs Ldg AW 22-006 Model 45 Airplane Flight Manual Yaw Damper Change RE (-) Advisory Wire 22 A/F Mos 13-Mar-2008 Hrs Ldg G2210030 Pitch Servo Cables - Perform Cable Tension Check. RE TLMC 05-13-02 ≈24-Apr-2025 22 A/F 05-13-02 Alias1:22-10-03 (ZONE: 320EL) (Tol. Adjustment: -30d) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 22-10-03.)) Mos 09-Feb-2024 48 -/+14d (09-Jan-2028) 3.6 Years (+14 Days) Hrs 5,253.5 1,200 -/+25 (6,453.5) 1,178.7 Hrs (+25) Ldg 3,757 G2210031 Roll Servo Cables - Perform Cable Tension Check. RE TLMC 05-13-01 ≈24-Apr-2025 22 A/F 05-13-01 Alias1:22-10-05 (ZONE: 250CC) (Tol. Adjustment: -30d) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 22-10-05.)) Mos 09-Feb-2024 48 -/+14d (09-Jan-2028) 3.6 Years (+14 Days) Hrs 5,253.5 1,200 -/+25 (6,453.5) 1,178.7 Hrs (+25) Ldg 3,757 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 33/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining G2210032 Yaw Servo Cables - Perform Cable Tension Check. RE TLMC 05-13-02 ≈24-Apr-2025 22 A/F 05-13-02 Alias1:22-10-07 (ZONE: 320EL) (Tol. Adjustment: -30d) (SOURCE: MM-104, MM-105) (NOTE: (Refer to 22-10-07.)) Mos 09-Feb-2024 48 -/+14d (09-Jan-2028) 3.6 Years (+14 Days) Hrs 5,253.5 1,200 -/+25 (6,453.5) 1,178.7 Hrs (+25) Ldg 3,757 ▼ 23 - COMMUNICATIONS Garmin GDL-51R XM Data Receiver - EFB RE (O/C) 23 A/F 010-01561-55 4RF501535 Mos 27-Sep-2023 Hrs 5,197.3 Ldg 3,212 AFIS Configuration Module RE (O/C) 23 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 AIRSERV Transmitter Replace RE (O/C) 23 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 ARTU Tray RE (O/C) 23 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Audio Control Unit RE (O/C) 23 A/F No.1 4523558501-003 0709C331 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Audio Control Unit RE (O/C) 23 A/F No.2 4523558501-003 0709C332 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Audio Distribution Module RE (O/C) 23 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Audio/Video Controller RE (O/C) 23 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Bridging, HF Amplifier RE (O/C) 23 A/F No.1 Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Bridging, HF Amplifier RE (O/C) 23 A/F No.2 Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 34/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining Cabin Assembly Phone RE (O/C) 23 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Cabin Distribution Bus Repeater RE (O/C) 23 A/F No.1 Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Cabin Distribution Bus Repeater RE (O/C) 23 A/F No.2 Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Cabin Iridium Satcom Handset RE (O/C) 23 A/F No.1 Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Cabin Iridium Satcom Handset RE (O/C) 23 A/F No.2 Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Cabin Iridium Satcom Phone Cradle RE (O/C) 23 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Cabin Speaker RE (O/C) 23 A/F Aft - Left EN-MT-45A 110700248 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Cabin Speaker RE (O/C) 23 A/F Aft - Right EN-MT-45A 070700121 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Cabin Speaker RE (O/C) 23 A/F Fwd - Left EN-MT-45A 090700434 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Cabin Speaker RE (O/C) 23 A/F Fwd - Right EN-MT-45A 070700122 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Cabin Video Monitor RE (O/C) 23 A/F Aft Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 35/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining Cabin Video Monitor RE (O/C) 23 A/F Fwd LCD-9121-101-2 020800341 New 0 Mos 26-Jun-2008 0 Hrs 237 0 Ldg 182 Call Alerter (Cas) Switch RE (O/C) 23 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Cassette Tape Player RE (O/C) 23 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Clearance Delivery Unit RE (O/C) 23 A/F 7513000-835 07103574 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Cockpit Area Microphone RE (O/C) 23 A/F 980-6113-001 04940MFR97896 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Cockpit Assembly Phone RE (O/C) 23 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Cockpit Iridium Satcom Base Unit RE (O/C) 23 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Cockpit Iridium Satcom Handset RE (O/C) 23 A/F 9L8810A-B 500013 New Mos 10-Feb-2021 Hrs 4,610.5 Ldg 2,822 Cockpit Iridium Satcom Phone Cradle RE (O/C) 23 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Cockpit Speaker RE (O/C) 23 A/F Left Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Cockpit Speaker RE (O/C) 23 A/F Right Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 36/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining Cockpit Voice Recorder RE (O/C) 23 A/F CVR 980-6022-011 CVR120-63874 Tested/Inspected 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Cockpit Voice Recorder Pre-Amplifier RE (O/C) 23 A/F 980-6118-001 00715 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Cockpit Voice Recorder Underwater Locator Beacon RE (O/C) 23 A/F CVR DK120 ST11030 Tested/Inspected Mos 06-Feb-2022 Hrs 4,859.6 Ldg 2,992 Communication Strap Board RE (O/C) 23 A/F No.1 Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Communication Strap Board RE (O/C) 23 A/F No.2 Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 CVR Inertia Switch RE (O/C) 23 A/F 3LO-453/8 82451 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 DVD Player RE (O/C) 23 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 GDC34 Converter Replace RE (O/C) 23 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Headset RE (O/C) 23 A/F Copilot Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Headset RE (O/C) 23 A/F Pilot Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 HF (KCU-951) Control RE (O/C) 23 A/F No.1 Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 37/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining HF (KCU-951) Control RE (O/C) 23 A/F No.2 Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 HF SELCAL Antenna RE (O/C) 23 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 HF SELCAL Receiver/Exciter RE (O/C) 23 A/F No.1 Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 HF SELCAL Receiver/Exciter RE (O/C) 23 A/F No.2 Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Infrared Remote Module Receiver RE (O/C) 23 A/F IFR-485-05-1 120700749 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Interphone Jack Box Assembly RE (O/C) 23 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Iridium Phone System Base Unit RE (O/C) 23 A/F Aft Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Iridium Satcom Antenna RE (O/C) 23 A/F Aft Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Iridium Satcom Antenna RE (O/C) 23 A/F Fwd CI490-1/500644-1 212556 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Iridium Satcom Sonalert RE (O/C) 23 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 KHF-1050 High Frequency Communication System RE (O/C) 23 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 38/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining Lavatory Iridium Satcom Transceiver RE (O/C) 23 A/F Aft Not Installed Not Installed Mos 09-Feb-2024 Hrs 5,253.5 Ldg 3,757 Lavatory Master Control Switch RE (O/C) 23 A/F SP-45-55 010800044 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Magnastar Antenna RE (O/C) 23 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Master Control Switch RE (O/C) 23 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Navigation Strap Board RE (O/C) 23 A/F No.1 Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Navigation Strap Board RE (O/C) 23 A/F No.2 Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 No. 1 Comm. Circuit Card Assembly RE (O/C) 23 A/F No.1 Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 No. 2 Comm. Circuit Card Assembly RE (O/C) 23 A/F No.2 Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 PA System Amplifer RE (O/C) 23 A/F PA-7501-01-1 120600356 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 Panel Switch RE (O/C) 23 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Passenger Interface Unit RE (O/C) 23 A/F PIU-45-04-1 120700713 New 0 Mos 13-Mar-2008 0 Hrs 0 0 Ldg 0 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 39/452 Generated: 24-May-2024 2:11 PM N316CJ STATUS REPORT BOMBARDIER Owner/Operator: Jet America Inc Learjet 45 N316CJ,SN 45-359 Task No Description Categories Time SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining Phone Magnastar Transceiver RE (O/C) 23 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Power Amplifier/Hf Antenna Coupler RE (O/C) 23 A/F No.1 Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Power Amplifier/Hf Antenna Coupler RE (O/C) 23 A/F No.2 Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Radio Altimeter Transmit Antenna RE (O/C) 23 A/F Aft Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Radio Altimeter Transmit Antenna RE (O/C) 23 A/F Fwd Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Radio Management (RMU) Unit RE (O/C) 23 A/F No.1 7013270-985 02083791 Mos 30-Aug-2018 Hrs 4,334.1 Ldg 2,548 Radio Management (RMU) Unit RE (O/C) 23 A/F No.2 7013270-985 05024728 Mos 30-Aug-2018 Hrs 4,334.1 Ldg 2,548 Satellite Data (SDU) Unit RE (O/C) 23 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Selcal System Change RE (O/C) 23 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 Static Inverter RE (O/C) 23 A/F SS120(C) 256 New 0 Mos 25-Jun-2009 0 Hrs 818.5 0 Ldg 529 Subwoofer Speaker RE (O/C) 23 A/F Unknown Unknown Mos 13-Mar-2008 Hrs 0 Ldg 0 [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance 40/452 Generated: 24-May-2024 2:11 PM