Cessna 150 Checklist
Checklist for the Cessna 150 G5
PDF, 1 page, 57 KB, from Sprinkle’s own files.
What it covers
This document is a checklist specifically for the Cessna 150 aircraft. It provides a comprehensive guide for pilots to perform pre-flight inspections, engine starting procedures, takeoff, landing, and emergency procedures. The checklist is structured to ensure that all critical systems and components are checked and verified before and during flight operations. It is designed for use by pilots to enhance safety and operational efficiency during flight preparation and execution.
Key points
- Mixture settings: RICH for starting and takeoff, LEAN 1 INCH for taxiing, IDLE/CUTOFF for securing the engine.
- Minimum oil level: 4 quarts, maximum: 6 quarts.
- Final approach airspeed: 60 KIAS with full flaps.
- Emergency landing airspeed: 60 KIAS with flaps up, 55 KIAS with flaps down.
- Normal climb speed: 60-70 KIAS.
Main sections
Pre-Flight Inspection
The pre-flight inspection section outlines the necessary checks to be performed before flight. This includes verifying documentation, checking the control lock, ensuring the ignition switch is off, and confirming fuel quantity. Specific checks are detailed for the empennage, wings, and nose of the aircraft, including securing surfaces and checking fluid levels.
Starting Engine
This section details the steps required to start the engine safely. Pilots are instructed to set the mixture to rich, ensure carb heat is cold, and prime as required. The checklist emphasizes the importance of checking the oil pressure after starting and ensuring the prop area is clear before ignition.
Normal Takeoff
The normal takeoff section provides critical parameters for takeoff, including setting the mixture to rich, ensuring flaps are at 0°, and achieving a rotation speed of 50-55 KIAS. It also specifies a climb speed of 60-70 KIAS.
Emergency Procedures
The emergency procedures section outlines actions to take in various scenarios, such as engine failure after takeoff and during flight. It includes specific airspeed targets and actions for managing fuel and ignition systems in emergencies.
Securing Aircraft
This section provides a checklist for securing the aircraft after landing, including setting the brakes, leaning the mixture, and turning off electrical systems.
Safety notes
- Always ensure the prop area is clear before starting the engine.
- Monitor oil pressure immediately after starting the engine.
- In case of engine failure, maintain airspeed of 60 KIAS.
The document’s text
Show the text read from the PDF
CESSNA 150 CHECKLIST PRE-FLIGHT INSPECTION CABIN 1. Document – A.R.R.O.W. 2. Control Lock – REMOVE 3. Ignition Switch – OFF 4. Master Switch – ON 5. Flaps – DOWN 6. Fuel Quantity – CHECK 7. Master Switch – OFF 8. Fuel Valve – ON EMPENNAGE 1. Empennage surface – CHK 2. Horizontal stabilizer – SECURE 3. Elevator – FREE & SECURE 4. Rudder – FREE & SECURE 5. Tail tie-down – DISCONNECT 6. Lights & Antenna – CHK 7. ELT Antenna – CHK RIGHT WING 1. Flap – FREE & SECURE 2. Aileron – FREE & SECURE 3. Lights & Wingtip – CHK 4. Leading edge – CHK 5. Wing tie-down – DISCONNECT 6. Main wheel & tire – CHK 7. Fuel tank sump drain – SAMPLE 8. Fuel quantity – VISUAL CHK 9. Fuel filler cap – SECURE NOSE 1. Engine oil – CHK LEVEL MIN 4 qts. MAX 6 qts. 2. Strainer drain – SAMPLE/CHK 3. Prop/Spinner – CHK 4. Air filter – CHK CLEAR 5. Landing light – CHK 6. Nose strut/tire – CHK 7. Static port – CHK OPEN LEFT WING 1. Main wheel & tire – CHK 2. Fuel tank sump drain – SAMPLE 3. Fuel quantity – VISUALLY CHK 4. Fuel filler cap – SECURE 5. Pitot tube cover – REMOVE/CHK 6. Stall warning opening – CHK 7. Fuel tank vent – OPEN 8. Wing tie-down – DISCONNECT 9. Leading edge – CHK 10. Lights/Wingtip – CHK 11. Aileron – FREE & SECURE 12. Flaps – FREE & SECURE [See POH for details] BEFORE STARTING ENGINE 1. Pre-flight – COMPLETE 2. Passengers briefed, seatbelts, harnesses – ON 3. Fuel shutoff valve – ON 4. Radios - OFF 5. Electrical Equipment – OFF 6. Circuit breakers – CHECK IN 7. Brakes – TEST / SET STARTING ENGINE 1. Mixture – RICH 2. Carb heat – COLD 3. Prime – AS REQUIRED 4. Master switch -- ON 5. Beacon Light – ON 6. Throttle – OPEN 1/8” 7. Prop Area – CLEAR 8. Ignition – START 9. Oil Pressure – CHK 10. Radio – ON/SET 11. Transponder – ON /ALT 12. Wing Flaps – UP 13. Mixture – LEAN 1 INCH 14. READY TO TAXI BEFORE TAKE OFF 1. Doors – CLOSED/LATCHED 2. Brakes – ON 3. Flight controls - FREE/CORRECT 4. Flight instruments – SET 5. Fuel valve – ON 6. Mixture – RICH 7. Trim – SET FOR TAKEOFF 8. Throttle – 1700 RPM - Mags – 150 DROP / 75 DIFF - Carb heat – CHK - Engine instr. – CHK - Ammeter – CHK - Suction – CHK - Idle – CHK WITH CARB HEAT ON 9. Throttle – BELOW 1000 RPM 10. Radios – SET 11. Transponder – ON ALT 12. Lights – ON 13. Throttle friction lock – ADJ NORMAL TAKEOFF 1. Mixture – RICH 2. Wing flaps - 0° 3. Carb heat – COLD 4. Throttle – FULL OPEN 5. Elevator – ROTATE 50Þ55 KIAS 6. Climb Speed – 60Þ70 KIAS ENROUTE CLIMB 1. Airspeed – 65Þ75 KIAS CRUISE 1. Power – 2000Þ2700 RPM 2. Elevator – TRIM 3. Mixture – LEAN CESSNA 150 CHECKLIST CONT’D BEFORE LANDING 1. Seats, seatbelts, harnesses - ON 2. Mixture – RICH OR DENSITY ALT 3. Radio – SET 4. Landing Light - ON 5. Carb heat – ON BEFORE CLOSING THROTTLE LANDING 1. Final Approach Airspeed 60 KIAS 2. Flaps – Full 3. Final approach Airspeed –60 KIAS Þ W/ FLAPS DOWN 40 Degrees 4. Touchdown at stall – MAINS FIRST 5. Landing roll – GENTLY LOWER NOSE 6. Braking – MINIMUM REQ’D AFTER LANDING 1. Wing Flaps – UP 2. Carb heat – COLD 3. Lights – STROBES/LANDING OFF 4. Trim – RESET SECURING AIRCRAFT 1. Brakes – ON 2. Mixture -- LEAN 1 INCH, 3. 1700 rpm 15 sec. 4. Radios/Transponder – OFF 5. 1000 rpm 6. Mixture – IDLE/CUTOFF 7. Magnetos—OFF KEYS OUT 8. Master switch – OFF 9. Electrical switches – OFF 10. Control lock – INSTALL EMERGENCY PROCEDURES ENGINE FAILURE AFTER TAKEOFF 1. Airspeed – 60 KIAS 2. Mixture – IDLE/CUTOFF 3. Fuel valve – OFF 4. Ignition switch – OFF 5. Doors – OPEN ENGINE FAILURE DURING FLIGHT 1. Airspeed – 60 KIAS 2. Carb heat – ON 3. Primer – IN & LOCKED 4. Fuel valve – ON 5. Mixture – RICH 6. Ignition – BOTH/START EMERGENCY LANDING W/O POWER 1. Airspeed – 60 KIAS [FLAPS UP] -55 KIAS [FLAPS DOWN] 2. Mixture – IDLE/CUTOFF 3. Fuel valve – OFF 4. Ignition switch – OFF 5. Wing Flaps – AS REQUIRED 6. Master switch – OFF 7. Doors – OPEN BEFORE TOUCHDOWN 8. Touchdown – TAIL LOW 9. Brakes – APPLY HEAVILY ENGINE FIRE ON GROUND 1. CONTINUE CRANKING TO START ENGINE 2. Engine Starts – POWER1700 for few minutes AND THEN SHUT DOWN 3. No Start – SHUTDOWN • THROTTLE FULL OPEN • MIXTURE IDLE CUTOFF • CONTINUE CRANKING ENGINE SECURE: • MASTER SWITCH OFF • IGNITION OFF • FUEL VALVE OFF • FIRE EXTINGUISH • INSPECT FOR DAMAGE ENGINE FIRE IN FLIGHT 1. Mixture – IDLE/CUTOFF 2. Fuel valve – OFF 3. Master switch – OFF 4. Cabin heat/air – OFF 5. Airspeed – 85 KIAS OR AS NECESSARY TO EXTINGUISH FIRE 6. Forced landing – EXECUTE ELECTRICAL FIRE IN FLIGHT 1. Master switch – OFF 2. All other switches (except ignition) OFF 3. Vents/cabin air/heat – OFF 4. Fire extinguisher – ACTIVATE WHEN FIRE APPEARS OUT 1. Master switch – ON 2. Circuit breakers – CHK, DON’T RESET 3. Radio & Electric – ON, ONE AT A TIME 4. VENTILATE CABIN OVER VOLTAGE LIGHT 1. Master switch – OFF 2. Master switch – ON 3. Light – OFF, IF ON, TERMINATE FLIGHT AMMETER DISCHARGE 1. Alternator – OFF 2. Electrical load – REDUCE 3. Flight – TERMINATE ASAP -- 1 of 1 --
Read from the PDF by machine, so tables and diagrams come out rough. The PDF is the document.
More Cessna 150 G5 documents
All 11 →- Checklist for CESSNA 150 G5
This document serves as a checklist for the Cessna 150 G5, providing pilots with a structured guide to ensure all necessary pre-flight, in-flight, and post-flight procedures are followed. The checklist is designed to enhance safety and efficiency during flight operations. It includes critical steps that pilots must complete before and after flying, ensuring that the aircraft is in optimal condition for flight. The document is intended for use by pilots operating the Cessna 150 G5, whether for training or personal use, and emphasizes the importance of thorough preparation and adherence to safety protocols.
- Checklist for Cessna 150 G5
This document serves as a checklist for the Cessna 150 G5, providing pilots with a structured approach to preflight, flight, and post-flight procedures. It is designed to ensure that all critical steps are followed to maintain safety and compliance with operational standards. The checklist includes various sections that cover essential tasks and checks that pilots must perform before and during flight, as well as after landing. This document is intended for use by pilots operating the Cessna 150 G5, offering a clear and concise reference to enhance flight safety and efficiency.
- Data Sheet AD5940/AD5941
The document is a data sheet for the AD5940 and AD5941, which are high precision, low power analog front ends designed for portable applications requiring electrochemical-based measurement techniques. It provides detailed specifications, features, and applications for these devices, which are suitable for various measurement techniques including amperometric, voltammetric, and impedance measurements. The document includes information on the devices' performance characteristics, power requirements, and operational capabilities, making it a valuable resource for engineers and developers working with these components.
- CESSNA 150 G5 Model Guide
CESSNA 150 G5 is a single-engine piston aircraft in the Cessna 150 family. The library entry has no year, seat or spec data, so the figures here come from two pilot checklists plus family-level registry maximums. Use them as a starting point and verify against the aircraft's POH and logbooks before buying.
- Product Data Sheet
This document is a Product Data Sheet for the Rosemount 8700M Magnetic Flow Meter, detailing its specifications, features, and configurations. It is intended for engineers and technicians involved in the selection and installation of magnetic flow meters in various industrial applications. The document outlines the performance characteristics, available models, and options for the Rosemount 8700M series, including transmitters and sensors. Key information includes accuracy ratings, diagnostic capabilities, and installation requirements, making it a comprehensive resource for users looking to optimize flow measurement solutions.
- A Comparison of the V2X Communication Systems: ITS-G5 and C-V2X
This document presents a comparison of two vehicle-to-everything (V2X) communication systems: ITS-G5 and C-V2X. It evaluates the performance of both systems in terms of their physical and MAC layers, focusing on their capabilities in optimizing road traffic and improving safety. The paper discusses the technical specifications, performance evaluations, and the impact of network congestion on both systems. The findings are based on simulations and field tests, providing insights into the advantages and limitations of each communication standard under various conditions.
- Product Information Sheet
This document serves as a product information sheet for DeoxIT® products, specifically detailing the D-Series, Gold G-Series, and Shield S-Series. It provides comprehensive information on the applications, formulations, and usage instructions for these cleaning and lubricating products. While it does not directly pertain to aircraft specifications, it is relevant for aviation enthusiasts and technicians who may use these products for maintenance on aircraft components. The document outlines the cleaning actions, compatibility, and application methods of various DeoxIT® products, emphasizing their importance in maintaining electrical connections and preventing corrosion.
- Airworthiness Directives for CESSNA 150 G5
This document is an Airworthiness Directive (AD) specifically for the Cessna 150 G5. It outlines mandatory actions that must be taken to ensure the continued airworthiness of the aircraft. The directive is issued by the Federal Aviation Administration (FAA) and is intended for aircraft owners, operators, and maintenance personnel. The document provides detailed instructions on compliance requirements, including timelines and specific procedures that must be followed to mitigate safety risks associated with the aircraft. The AD is crucial for maintaining operational safety and compliance with federal regulations.
Cessna 150 for sale now
View all 36 for sale →Aircraft that this checklist covers, listed on the sites Sprinkle reads. Asking prices, not sales. Cessna 150 asking prices by year built.
Also useful for the Cessna 150 G5
From Sprinkle’s library of aircraft documents. PDFs open from Sprinkle’s own files. Read Mar 6, 2026.
Want this document taken down? Request removal


