STANDARD SPECIFICATIONS FOR HIGHWAYS AND STRUCTURES

CESSNA 172C · Specifications

Free account — keep the POHs & checklists you reference in one place.

Overview

This document outlines the standard specifications for highways and structures as established by the District of Columbia Department of Transportation. It serves as a comprehensive guide for construction activities and material control within the public space of the District. The specifications are applicable to all contracts awarded by the Mayor and the Council of the District of Columbia, ensuring consistency and quality in construction practices. The document is intended for use by contractors, engineers, and other stakeholders involved in public works projects, providing detailed requirements and guidelines for various construction processes.

  • Standard specifications apply to all District Department of Transportation contracts.
  • Contractors must comply with quality control measures for materials used.
  • Legal obligations include restoration of surfaces opened by permits and public safety provisions.
  • Bidding requirements and instructions are detailed for contractors.
  • Payment processes for construction activities are clearly defined.

Document

Source

Originally published by ddot.dc.gov. Sprinkle hosts a reference copy with an added summary, specifications and searchable full text.

Report a problem or request removal

Document details

Type
Specifications
Year
2013
Pages
888
File size
7.3 MB
Publisher
ddot.dc.gov
How rare is it?
472CESSNA 172C registered worldwide · 419 active

Common. One of the most common aircraft types we track.

Documentation completeness
6/7

Most owners only have the POH. Here's the essential set for the CESSNA 172C.

More CESSNA 172Cmanuals & documents

See all 29
Similar aircraft

If you fly the CESSNA 172C, you may also be researching these.

In this document

General Requirements

This section outlines the definitions, terms, and general provisions applicable to all construction contracts. It includes bidding requirements, instructions to bidders, and standard contract provisions.

Control of Work

This section details the authority of the Chief Engineer, conformity with plans and specifications, and the responsibilities of contractors regarding the quality and execution of work.

Control of Materials

This section specifies the requirements for materials used in construction, including source of supply, quality control measures, and compliance certification.

Legal Relations & Responsibility to Public

This section covers the legal obligations of contractors, including restoration of surfaces, public safety provisions, and environmental protection measures.

Measurement and Payment

This section explains how quantities will be measured and the payment processes for various construction activities.

Safety notes

  • Ensure compliance with safety provisions to protect public convenience during construction.
  • Adhere to environmental protection measures to minimize impact on the community.

Full document text

DISTRICT OF COLUMBIA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR HIGHWAYS AND STRUCTURES 2013 DISTRICT OF COLUMBIA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR HIGHWAYS AND STRUCTURES 2013 DISTRICT OF COLUMBIA DEPARTMENT OF TRANSPORTATION TERRY BELLAMY, DIRECTOR RONALDO T. NICHOLSON, P.E., CHIEF ENGINEER MUHAMMED KHALID, P.E., DEPUTY CHIEF ENGINEER RAVINDRA GANVIR, P.E., DEPUTY CHIEF ENGINEER WASI KHAN, P.E., CHIEF QA/QC DIVISION Specifications Task Force Wasi Khan, P.E. Rezene Medhani, P.E. Abdullahi Mohamed Dawit Muluneh, P.E. Larry Chung Konjit Eskender, P.E. Keith Foxx, P.E. Albert Ladipoh Cherwin Baga Bill McGuirk James Cheeks, FITE Rahul Jain Ray Robbins, P.E., DC Water INTRODUCTION These Standard Specifications for Highways and Structures are standard for all District Department of Transportation contracts awarded by the Mayor of the District of Columbia, the Council of the District of Columbia, and/or the Contracting Officer. The requirements stated herein may be revised or amended from time to time, but only to the extent specified under a supplemental specification or special provision included in the specific contract. These Standard Specifications shall further be the standard specifications for all the construction activities and material control within the Public Space of the District of Columbia. Reference by date and title shall be made to these specifications with the Plans or other Contract Documents as notification of their application to those documents. Ronaldo T. Nicholson, P.E. Chief Engineer i TABLE OF CONTENTS DIVISION 100 GENERAL REQUIREMENTS 1 101 DEFINITIONS AND TERMS 5 101.01 GENERAL 5 101.02 ABBREVIATIONS 5 101.03 DEFINITIONS 6 102 BIDDING REQUIREMENTS GOVERNMENT OF THE DISTRICT OF COLUMBIA STANDARD CONTRACT PROVISIONS FOR USE WITH SPECIFICATIONS FOR DISTRICT OF COLUMBIA GOVERNMENT CONSTRUCTION PROJECTS 1973, AS AMENDED 11 102.01 INSTRUCTIONS TO BIDDERS (CONSTRUCTION) 11 102.02 PROPOSAL FORMS 15 102.03 RESERVED 15 102.04 AFFIRMATIVE ACTION PROGRAM 15 102.05 NON COLLUSION 16 102.06 ANTI-DISCRIMINATION CLAUSE 16 102.07 EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION 16 102.08 NONSEGREGATED FACILITIES CERTIFICATION 16 102.09 RESERVED 16 102.10 EMPLOYMENT OF THE HANDICAPPED 16 103 STANDARD CONTRACT PROVISIONS 17 103.01 GENERAL PROVISIONS (CONSTRUCTION CONTRACT) 17 103.02 CONTRACT LABOR PROVISIONS 33 103.03 EQUAL EMPLOYMENT OPPORTUNITY RESPONSIBILITIES 44 103.04 EMPLOYEE TRAINING REQUIREMENTS 48 104 SCOPE OF WORK 50 104.01 INTENT OF CONTRACT 50 104.02 MAINTENANCE OF TRAFFIC 50 104.03 VALUE ENGINEERING PROPOSALS BY CONTRACTOR 52 105 CONTROL OF WORK 54 105.01 CHIEF ENGINEER’S AUTHORITY 54 105.02 PLANS AND WORKING DRAWINGS 54 105.03 CONFORMITY WITH PLANS AND SPECIFICATIONS 55 105.04 COORDINATION OF PLANS AND SPECIFICATIONS 55 105.05 COOPERATION WITH UTILITY RELOCATION 55 105.06 FIELD LAYOUT 56 105.07 INSPECTOR’S AUTHORITY 56 105.08 LOAD RESTRICTIONS 57 105.09 FAILURE TO MAINTAIN ROADWAY OR STRUCTURE 57 105.10 WEEKEND WORK 57 105.11 NIGHT WORK AND NOISE LEVEL RESTRICTIONS 57 105.12 REMOVAL OF UNACCEPTABLE AND UNAUTHORIZED WORK AND MATERIALS 58 105.13 INSPECTION – ACCEPTANCE 58 i 106 CONTROL OF MATERIALS 59 106.01 SOURCE OF SUPPLY AND QUALITY 59 106.02 SAMPLES, TESTS AND CITED SPECIFICATIONS 59 106.03 MATERIALS COMPLIANCE CERTIFICATION 61 106.04 PLANT INSPECTION 62 106.05 QUALITY CONTROL OF PLANTS 62 106.06 FIELD FACILITIES 62 106.07 STORAGE OF MATERIALS 64 106.08 HANDLING OF MATERIALS 64 106.09 UNACCEPTABLE MATERIALS 64 106.10 MATERIAL SHORTAGES 65 106.11 MATERIALS ORDER 65 106.12 PROCESSING OF MATERIALS 65 106.13 CONTRACTOR PROCESS QUALITY CONTROL AT ASPHALT AND CONCRETE PLANTS 65 106.14 MINIMUM REQUIREMENTS FOR TESTING LABORATORIES AT ASPHALT AND CONCRETE PLANTS 69 107 LEGAL RELATIONS & RESPONSIBILITY TO PUBLIC 70 107.01 RESTORATION OF SURFACES OPENED BY PERMIT 70 107.02 FEDERAL PARTICIPATION (FEDERAL-AID PROJECTS) 70 107.03 SANITARY, HEALTH AND SAFETY PROVISIONS 70 107.04 PUBLIC CONVENIENCE AND SAFETY 70 107.05 RAILWAY-HIGHWAY PROVISIONS 70 107.06 CONSTRUCTION OVER OR ADJACENT TO NAVIGABLE WATERS 70 107.07 BARRICADES AND WARNING SIGNS 71 107.08 EMERGENCY PROCESS 71 107.09 USE OF EXPLOSIVES 71 107.10 PROTECTION AND RESTORATION OF PROPERTY AND LANDSCAPE 71 107.11 NATIONAL HISTORIC PRESERVATION ACT OF 1966 71 107.12 TREE PROTECTION AND REPLACEMENT 72 107.13 INSURANCE 72 107.14 OPENING OF SECTIONS OF PROJECT TO TRAFFIC 73 107.15 CONTRACTOR’S RESPONSIBILITY FOR WORK 73 107.16 UTILITY PROTECTIVE ALERT 73 107.17 ENVIRONMENTAL PROTECTION 74 107.18 WATER SUPPLY 78 107.19 CIVIL RIGHTS 78 108 PROSECUTION AND PROGRESS 79 108.01 SUBLETTING OF CONTRACT 79 108.02 NOTICE TO PROCEED 79 108.03 CONSTRUCTION SCHEDULING 79 108.04 MOBILIZATION 80 108.05 ENGINEER’S FIELD FACILITIES 81 108.06 LIMITATION OF OPERATIONS 83 108.07 METHODS AND EQUIPMENT 83 108.08 DETERMINATION OF CONTRACT TIME AND PARTIAL SUSPENSION 83 108.09 SUBSTANTIAL COMPLETION AND FINAL ACCEPTANCE 84 ii 108.10 PROGRESS PHOTOGRAPHS 86 108.11 DIMENSIONS OF EXISTING FACILITIES 86 108.12 ADVERSE WEATHER PRECAUTIONS 86 108.13 PRECONSTRUCTION SURVEY 86 108.14 FIELD LAYOUT 86 108.15 AS BUILT DRAWINGS 87 109 MEASURE AND PAYMENT 88 109.01 MEASUREMENT OF QUANTITIES 88 109.02 SCOPE OF PAYMENT 88 109.03 EXTRA AND FORCE ACCOUNT WORK 88 109.04 ELIMINATED ITEMS 89 109.05 PROGRESS PAYMENTS 89 109.06 PAYMENT TO SUBCONTRACTORS AND SUPPLIERS CERTIFICATE 89 109.07 PAYMENT FOR STOCKPILED MATERIALS 89 109.08 ACCEPTANCE AND FINAL PAYMENT 90 DIVISION 200 EARTHWORK AND EXCAVATION 91 201 CLEARING AND GRUBBING 95 201.01 DESCRIPTION 95 201.02 LIMITS 95 201.03 CONSTRUCTION REQUIREMENTS 95 201.04 MEASURE AND PAYMENT 95 202 ROADWAY EXCAVATION 96 202.01 DESCRIPTION 96 202.02 COMMON EXCAVATION 96 202.03 HARD SURFACE PAVEMENT EXCAVATION 96 202.04 CONSTRUCTION REQUIREMENTS 96 202.05 MEASURE AND PAYMENT 97

Show full text

203 SOILS CONSTRUCTION – GENERAL 98 203.01 DESCRIPTION 98 203.02 MATERIALS 98 203.03 CONSTRUCTION REQUIREMENTS 98 204 EMBANKMENT FILL 100 204.01 DESCRIPTION 100 204.02 MATERIALS 100 204.03 CONSTRUCTION REQUIREMENTS 100 204.04 MEASURE AND PAYMENT 100 205 STRUCTURE EXCAVATION AND DEMOLITION 101 205.01 STRUCTURE EXCAVATION 101 205.02 DEMOLITION 103 205.03 STRUCTURE HARD SURFACE EXCAVATION 103 205.04 STREETCAR TRACK REMOVAL 104 205.05 MEASURE AND PAYMENT 104 206 STRUCTURE BACKFILL 106 206.01 DESCRIPTION 106 iii 206.02 MATERIALS 106 206.03 CONSTRUCTION REQUIREMENTS 106 206.04 MEASURE AND PAYMENT 106 207 TRENCH EXCAVATION AND BACKFILL 107 207.01 DESCRIPTION 107 207.02 TRENCH SHORING 107 207.03 TRENCH EXCAVATION 107 207.04 TRENCH BACKFILL 109 207.05 MEASURE AND PAYMENT 109 207.06 TRENCH UNDERCUT EXCAVATION 110 207.07 BORROW TRENCH BACKFILL 110 208 PERVIOUS FILL 112 208.01 DESCRIPTION 112 208.02 MATERIALS 112 208.03 CONSTRUCTION REQUIREMENTS 112 208.04 MEASURE AND PAYMENT 112 209 AGGREGATE BASE COURSE 113 209.01 DESCRIPTION 113 209.02 MATERIALS 113 209.03 CONSTRUCTION REQUIREMENTS 113 209.04 PLACING 113 209.05 MIXING 113 209.06 SHAPING AND COMPACTION 113 209.07 MEASURE AND PAYMENT 114 210 RE-COMPACT EXISTING BASE COURSE 115 210.01 DESCRIPTION 115 210.02 MATERIALS 115 210.03 CONSTRUCTION REQUIREMENTS 115 210.04 MEASURE AND PAYMENT 115 211 SCARIFYING 116 211.01 DESCRIPTION 116 211.02 CONSTRUCTION REQUIREMENTS 116 211.03 MEASURE AND PAYMENT 116 212 TEST PITS 117 212.01 DESCRIPTION 117 212.02 SUBMITTALS 117 212.03 MATERIALS 117 212.04 CONSTRUCTION REQUIREMENTS 117 212.05 MEASURE AND PAYMENT 117 213 GEOSYNTHETIC STABILIZED SUBGRADE USING GRADED AGGREGATE BASE 118 213.01 DESCRIPTION 118 213.02 MATERIALS 118 213.03 CONSTRUCTION REQUIREMENTS 119 213.04 MEASURE AND PAYMENT 120 iv 214 PERMEABLE BASE 121 214.01 DESCRIPTION 121 214.02 MATERIALS 121 214.03 CONSTRUCTION REQUIREMENTS 121 214.04 PROTECTION 122 214.05 TOLERANCES 122 214.06 TESTING 122 214.07 MEASURE AND PAYMENT 122 215 EXCAVATIONS AND RESTORATIONS (UTILITY LINES) 123 215.01 DESCRIPTION 123 215.02 USE OF STEEL PLATES 123 215.03 COMPOSITE PAVEMENTS 123 215.04 PCC PAVEMENTS 124 215.05 FLEXIBLE PAVEMENTS 124 215.06 CROSSWALKS AND SIDEWALKS 125 215.07 PAVEMENT MARKINGS 125 215.08 REMOVAL OF PAVEMENT MARKINGS 125 215.09 MEASURE AND PAYMENT 125 216 IN-SITU SOIL STABILIZATION 126 216.01 DESCRIPTION 126 216.02 CONSTRUCTION REQUIREMENTS 126 216.03 MEASURE AND PAYMENT 127 DIVISION 300 WATER AND SEWER SERVICES 129 301 H PILES-THRUST BLOCK 133 301.01 DESCRIPTION 133 301.02 SUBMITTALS 133 301.03 MATERIALS 133 301.04 CONSTRUCTION REQUIREMENTS 133 301.05 MEASURE AND PAYMENT 133 302 VALVE CASINGS 134 302.01 DESCRIPTION 134 302.02 SUBMITTALS 134 302.03 MATERIALS 134 302.04 CONSTRUCTION REQUIREMENTS 134 302.05 MEASURE AND PAYMENT 134 303 ABANDONING VALVE CASING AND HYDRANTS 135 303.01 DESCRIPTION 135 303.02 MATERIALS 135 303.03 CONSTRUCTION REQUIREMENTS 135 303.04 MEASURE AND PAYMENT 135 304 BUTTERFLY VALVE MANHOLES 136 304.01 DESCRIPTION 136 304.02 SUBMITTALS 136 304.03 MATERIALS 136 v 304.04 CONSTRUCTION REQUIREMENTS 136 304.05 MEASURE AND PAYMENT 136 305 WATER MAIN PIPE – DUCTILE-IRON 137 305.01 DESCRIPTION 137 305.02 SUBMITTALS 137 305.03 MATERIALS 137 305.04 MATERIALS SUPPLIED BY DISTRICT 137 305.05 CONSTRUCTION REQUIREMENTS 138 305.06 WATER MAIN TESTS 138 305.07 MEASURE AND PAYMENT 138 306 GATE/BUTTERFLY VALVES 139 306.01 DESCRIPTION 139 306.02 SUBMITTALS 139 306.03 MATERIALS 140 306.04 CONSTRUCTION REQUIREMENTS 140 306.05 MEASURE AND PAYMENT 140 307 FIRE HYDRANTS 141 307.01 DESCRIPTION 141 307.02 SUBMITTALS 141 307.03 MATERIALS 142 307.04 CONSTRUCTION REQUIREMENTS 142 307.05 MEASURE AND PAYMENT 142 308 WATER SERVICE CONNECTIONS 143 308.01 DESCRIPTION 143 308.02 PERMITS 143 308.03 SUBMITTALS 143 308.04 MATERIALS 143 308.05 CONSTRUCTION REQUIREMENTS 144 308.06 MEASURE AND PAYMENT 146 309 SEWER MANHOLES 147 309.01 DESCRIPTION 147 309.02 SUBMITTALS 147 309.03 MATERIALS 147 309.04 CONSTRUCTION REQUIREMENTS 147 309.05 MEASURE AND PAYMENT 147 310 CATCH BASINS AND CONNECTING PIPE 149 310.01 DESCRIPTION 149 310.02 SUBMITTALS 149 310.03 MATERIALS 149 310.04 CONSTRUCTION REQUIREMENTS 149 310.05 MEASURE AND PAYMENT 150 311 ADJUSTING MANHOLES AND ADJUSTING, REBUILDING, AND REPLACING CATCH BASINS 151 311.01 DESCRIPTION 151 311.02 MATERIALS 151 vi 311.03 ADJUST MANHOLE FRAMES/DROP INLET FRAMES 151 311.04 RESET MANHOLE FRAMES/DROP INLET FRAMES 151 311.05 ADJUST STANDARD BASIN TOPS/ELONGATION TOPS 152 311.06 FURNISH INLET FRAME AND MANHOLE FRAME UNITS 152 311.07 MANHOLE ADAPTER RINGS 152 311.08 REBUILD SEWER-WATER MANHOLES AND STANDARD BASINS 152 311.09 REPLACE BASINS 152 311.10 MEASURE AND PAYMENT 153 312 REPLACING SEWER/WATER MANHOLE FRAMES AND BASIN TOPS 154 312.01 DESCRIPTION 154 312.02 MATERIALS 154 312.03 CONSTRUCTION REQUIREMENTS 154 312.04 MEASURE AND PAYMENT 154 313 ABANDONING SEWER FACILITIES 156 313.01 DESCRIPTION 156 313.02 MATERIALS 156 313.03 CONSTRUCTION REQUIREMENTS 156 313.04 MEASURE AND PAYMENT 156 314 PIPE SEWER 157 314.01 DESCRIPTION 157 314.02 SUBMITTALS 157 314.03 MATERIALS 157 314.04 CONSTRUCTION REQUIREMENTS 157 314.05 MEASURE AND PAYMENT 158 315 PIPE SEWER TV INSPECTION 159 315.01 DESCRIPTION 159 315.02 SUBMITTALS 159 315.03 EQUIPMENT 160 315.04 EXECUTION 160 315.05 MEASURE AND PAYMENT 160 316 BUILDING SEWER CONNECTIONS AND CLEANOUTS 161 316.01 DESCRIPTION 161 316.02 SUBMITTALS 161 316.03 MATERIALS 161 316.04 CONSTRUCTION REQUIREMENTS 162 316.05 MEASURE AND PAYMENT 164 317 SEWER/WATER PCC FORMWORK CONSTRUCTION 165 317.01 DESCRIPTION 165 317.02 SUBMITTALS 165 317.03 MATERIALS 165 317.04 CONSTRUCTION REQUIREMENTS 165 317.05 MEASURE AND PAYMENT 165 318 REINFORCING STEEL – SEWER/WATER WORK 166 318.01 DESCRIPTION 166 318.02 SUBMITTALS 166 vii 318.03 MATERIALS 166 318.04 CONSTRUCTION REQUIREMENTS 166 318.05 MEASURE AND PAYMENT 166 319 SEWER/WATER PCC ACCESSORIES 167 319.01 DESCRIPTION 167 319.02 SUBMITTALS 167 319.03 MATERIALS 167 319.04 CONSTRUCTION REQUIREMENTS 167 319.05 MEASURE AND PAYMENT 168 320 SEWER/WATER PCC CONSTRUCTION 169 320.01 DESCRIPTION 169 320.02 SUBMITTALS 169 320.03 MATERIALS 169 320.04 MEASURING/MIXING 169 320.05 TESTING AND ACCEPTANCE 170 320.06 CONSTRUCTION REQUIREMENTS 170 320.07 MEASURE AND PAYMENT 170 321 PCC VALVE/VENTURI VAULTS 171 321.01 DESCRIPTION 171 321.02 SUBMITTALS 171 321.03 MATERIALS 171 321.04 CONSTRUCTION REQUIREMENTS 172 321.05 MEASURE AND PAYMENT 172 322 PCC THRUST BLOCK 173 322.01 DESCRIPTION 173 322.02 SUBMITTALS 173 322.03 MATERIALS 173 322.04 CONSTRUCTION REQUIREMENTS 173 322.05 MEASURE AND PAYMENT 173 323 REINFORCED PCC COLLAR 174 323.01 DESCRIPTION 174 323.02 SUBMITTALS 174 323.03 MATERIALS 174 323.04 CONSTRUCTION REQUIREMENTS 174 323.05 MEASURE AND PAYMENT 174 324 PCC IN-LINE THRUST BLOCK 175 324.01 DESCRIPTION 175 324.02 SUBMITTALS 175 324.03 MATERIALS 175 324.04 CONSTRUCTION REQUIREMENTS 175 324.05 MEASURE AND PAYMENT 175 325 NON-SHRINK GROUTING 176 325.01 DESCRIPTION 176 325.02 SUBMITTALS 176 325.03 PRODUCT DELIVERY, STORAGE, AND HANDLING 176 viii 325.04 MATERIALS 176 325.05 CONSTRUCTION REQUIREMENTS 176 325.06 MEASURE AND PAYMENT 177 326 MOISTURE-PROOFING – PCC VALVE/VENTURI VAULTS 178 326.01 DESCRIPTION 178 326.02 SUBMITTALS 178 326.03 MATERIALS 178 326.04 CONSTRUCTION REQUIREMENTS 178 326.05 MEASURE AND PAYMENT 179 327 SIDEWALK INTERCEPTOR DRAINS, CONNECTIONS, GRATINGS, AND TRAPS 180 327.01 DESCRIPTION 180 327.02 MATERIALS 180 327.03 CONSTRUCTION REQUIREMENTS 180 327.04 MEASURE AND PAYMENT 181 328 CLEAN EXISTING STORM SEWER STRUCTURES AND CONNECTING PIPE 182 328.01 DESCRIPTION 182 328.02 CONSTRUCTION REQUIREMENTS 182 328.03 MEASURE AND PAYMENT 182 DIVISION 400 ASPHALT CONSTRUCTION 183 401 PLANT MIX PAVEMENTS – GENERAL 185 401.01 DESCRIPTION 185 401.02 COMPOSITION OF MIXTURES 185 401.03 MATERIALS 185 401.04 WEATHER AND SEASONAL RESTRICTIONS 186 401.05 EQUIPMENT 186 401.06 HAULING OF ASPHALTIC MATERIALS 186 401.07 PREPARATION OF BASE COURSE OR EXISTING SURFACE 187 401.08 PREPARATION OF MATERIALS 187 401.09 MIXING AND HOLDING 187 401.10 SPREADING AND FINISHING 188 401.11 COMPACTION OF ASPHALTIC MIXTURES 189 401.12 SURFACE COURSE JOINTS 190 401.13 PAVEMENT SAMPLES 190 401.14 SURFACE TOLERANCES 190 401.15 PROTECTION OF ASPHALTIC PAVEMENT 190 401.16 CLEANING 190 401.17 PAVEMENT CORES 191 401.18 ADJUSTMENT OF PRICE FOR ASPHALT BINDER 191 402 HOT MIX ASPHALT PAVEMENT (HMA) 192 402.01 DESCRIPTION 192 402.02 MATERIALS 192 402.03 CONSTRUCTION REQUIREMENTS 192 402.04 MEASURE AND PAYMENT 193 ix 403 TACK COAT 194 403.01 DESCRIPTION 194 403.02 CERTIFICATION 194 403.03 CONSTRUCTION REQUIREMENTS 194 403.04 MEASURE AND PAYMENT 194 404 SLURRY SEAL 195 404.01 DESCRIPTION 195 404.02 COMPOSITION 195 404.03 MATERIALS 195 404.04 CONSTRUCTION REQUIREMENTS 195 404.05 MEASURE AND PAYMENT 195 405 TEMPORARY ASPHALT CONCRETE 196 405.01 DESCRIPTION 196 405.02 MATERIALS 196 405.03 ALTERNATE 196 405.04 MEASURE AND PAYMENT 196 406 STONE FILLED SHEET ASPHALT PATCHING 197 406.01 DESCRIPTION 197 406.02 MATERIALS 197 406.03 CONSTRUCTION REQUIREMENTS 197 406.04 MEASURE AND PAYMENT 197 407 ASPHALT PATCHING 198 407.01 DESCRIPTION 198 407.02 MATERIALS 198 407.03 CONSTRUCTION REQUIREMENTS 198 407.04 MEASURE AND PAYMENT 198 408 REPAIR – REPLACE BITUMINOUS SURFACES AND BASE 199 408.01 DESCRIPTION 199 408.02 MATERIALS 199 408.03 CONSTRUCTION REQUIREMENTS 199 408.04 WASTED MATERIAL 199 408.05 MEASURE AND PAYMENT 200 409 ASPHALT BIKE PATH 201 409.01 DESCRIPTION 201 409.02 MATERIALS 201 409.03 CONSTRUCTION REQUIREMENTS 201 409.04 MEASURE AND PAYMENT 201 410 PAVEMENT PROFILING (MILLING) 202 410.01 DESCRIPTION 202 410.02 EQUIPMENT AND CONSTRUCTION 202 410.03 MEASURE AND PAYMENT 202 411 FURNISHING BITUMINOUS MATERIALS 203 411.01 DESCRIPTION 203 411.02 MEASURE AND PAYMENT 203 x 412 CUT PAVEMENT CHANNEL 204 412.01 DESCRIPTION 204 412.02 MEASURE AND PAYMENT 204 413 WARM MIX ASPHALT PAVEMENT (WMA) 205 413.01 DESCRIPTION 205 413.02 MATERIALS 205 413.03 MIX DESIGN REQUIREMENTS 206 413.04 CONSTRUCTION 208 414 CRACK SEALING 209 414.01 DEFINITION 209 414.02 DESCRIPTION 209 414.03 MATERIALS 209 414.04 CONSTRUCTION METHODS 209 414.05 MEASURE AND PAYMENT 209 415 IN-PLACE RECYCLING OF HOT MIX ASPHALT PAVEMENT 210 415.01 DESCRIPTION 210 415.02 MATERIALS 210 415.03 CONSTRUCTION REQUIREMENTS 210 415.04 MEASURE AND PAYMENT 210 DIVISION 500 PORTLAND CEMENT CONCRETE CONSTRUCTION 211 501 PORTLAND CEMENT CONCRETE PAVEMENT 213 501.01 DESCRIPTION 213 501.02 MATERIALS 213 501.03 PROPORTIONING 213 501.04 EQUIPMENT 214 501.05 PREPARATION OF GRADE 214 501.06 SETTING FORMS 214 501.07 CONDITIONING OF BASE COURSE 214 501.08 HANDLING, MEASURING AND BATCHING MATERIALS 215 501.09 MIXING CONCRETE 215 501.10 LIMITATIONS ON MIXING AND PLACING 216 501.11 PLACING AND CONSOLIDATING CONCRETE 217 501.12 STRIKE-OFF OF CONCRETE AND PLACEMENT OF REINFORCEMENT 218 501.13 FINAL STRIKE-OFF, CONSOLIDATION, AND FINISHING 218 501.14 JOINTS 220 501.15 TESTING 222 501.16 SURFACE TESTING 223 501.17 CURING 223 501.18 REMOVING FORMS AND BACKFILLING 224 501.19 SEALING OF JOINTS 224 501.20 PROTECTION OF PAVEMENT 225 501.21 OPENING TO TRAFFIC 225 501.22 HIGH EARLY STRENGTH CONCRETE 225 501.23 TOLERANCE IN PAVEMENT THICKNESS 226 xi 501.24 MEASURE AND PAYMENT 226 502 PORTLAND CEMENT CONCRETE BASE 228 502.01 DESCRIPTION 228 502.02 CONSTRUCTION REQUIREMENTS 228 502.03 MEASURE AND PAYMENT 228 503 REINFORCED PORTLAND CEMENT CONCRETE ALLEY 229 503.01 DESCRIPTION 229 503.02 CONSTRUCTION REQUIREMENTS 229 503.03 MEASURE AND PAYMENT 229 504 PCC DRIVEWAY AND ALLEY ENTRANCES 230 504.01 DESCRIPTION 230 504.02 CONSTRUCTION REQUIREMENTS 230 504.03 MEASURE AND PAYMENT 230 505 REPAIR PCC PAVEMENT BASE, ALLEY, DRIVEWAY AND ALLEY ENTRANCES 231 505.01 DESCRIPTION 231 505.02 MATERIALS 231 505.03 PROPORTIONING 231 505.04 CONSTRUCTION REQUIREMENTS 231 505.05 CLEANING 232 505.06 MEASURE AND PAYMENT 232 506 BUS STOP PADS, MEDIAN STRIPS, AND ISLANDS 233 506.01 DESCRIPTION 233 506.02 MATERIALS 233 506.03 COMPOSITION 233 506.04 TESTING 233 506.05 CONSTRUCTION REQUIREMENTS 233 506.06 MEASURE AND PAYMENT 234 507 MINOR STRUCTURES 235 507.01 WALLS AND STEPS 235 507.02 PORTLAND CEMENT CONCRETE COPINGS 237 DIVISION 600 INCIDENTAL CONSTRUCTION 239 601 UNDERDRAINS 245 601.01 DESCRIPTION 245 601.02 MATERIALS 245 601.03 CONSTRUCTION REQUIREMENTS 245 601.04 MEASURE 246 601.05 PAYMENT 246 602 SLOPE AND FOUNDATION PROTECTION 247 602.01 DESCRIPTION 247 602.02 MATERIALS 247 602.03 CONSTRUCTION REQUIREMENTS 247 602.04 MEASURE AND PAYMENT 248 xii 603 GUARDRAILS AND GUARDRAIL TERMINALS 249 603.01 GUARDRAIL 249 603.02 GUARDRAIL TERMINAL SECTIONS 252 603.03 RUB RAIL 253 603.04 PCC TERMINAL BLOCK 253 603.05 REMOVE GUARDRAIL BURIED TERMINAL 253 603.06 REMOVE GUARDRAIL 254 603.07 RESET GUARDRAIL 254 603.08 EXTRA GUARDRAIL COMPONENTS 254 603.09 CABLE BARRIERS 255 604 MISCELLANEOUS FENCING 258 604.01 CHAIN LINK FENCE 258 604.02 VINYL CLAD CHAIN LINK FENCE WITH REDWOOD SLATS 260 604.03 SAFETY FENCE SHIELDING 260 604.04 CONSTRUCTION BOARD FENCE (SOLID WOOD FENCE) 261 604.05 TEMPORARY FENCE 262 604.06 ORNAMENTAL SAFETY FENCE 262 605 SIDEWALK AND DRIVEWAY 264 605.01 PORTLAND CEMENT CONCRETE SIDEWALK AND DRIVEWAY 264 605.02 PORTLAND CEMENT CONCRETE SIDEWALK REPAIR AND MISCELLANEOUS CONSTRUCTION 266 605.03 ASPHALTIC CONCRETE WALK 268 605.04 BRICK AND BLOCK SIDEWALK AND REPAIR 268 605.05 INVERTED-U BIKE RACK 271 605.06 REMOVE BIKE RACK 272 606 CURBS, GUTTERS, DITCHES, AND PAVED FLUMES 273 606.01 PORTLAND CEMENT CONCRETE CURB, CURB AND GUTTER, AND GUTTER 273 606.02 STONE CURB 275 606.03 ASPHALTIC CONCRETE CURB 279 606.04 PCC WHEELCHAIR/BICYCLE RAMPS 279 606.05 PORTLAND CEMENT CONCRETE DITCHES 280 606.06 PAVED BITUMINOUS CONCRETE DITCHES 281 606.07 BRICK GUTTER 281 606.08 DETECTABLE WARNING PAVERS ON EXISTING AND NEW WHEEL CHAIR/BICYCLE RAMPS 282 607 TURF ESTABLISHMENT 286 607.01 SEEDING 286 607.02 SODDING 288 607.03 WILDFLOWER SEEDING 289 607.04 CROWN VETCH HYDROSEEDING 291 607.05 RENOVATING GRASS 292 607.06 EROSION CONTROL MATTING 293 607.07 TOPSOIL 294 608 TREES, SHRUBS, VINES AND GROUND COVER 295 608.01 REMOVE TREE AND/OR STUMP 295 608.02 PLANTS AND PLANTING 295 xiii 608.03 TRANSPLANTS AND TRANSPLANTING 299 608.04 PRUNING TREES 301 608.05 TREE BOX DRAINAGE-AERATION 302 608.06 ORNAMENTAL IRON TREE FENCE 302 608.07 TREE PROTECTION AND REPLACEMENT 304 608.08 TREE ROOT PROTECTION 305 609 PERMANENT BENCH MARK 306 609.01 DESCRIPTION 306 609.02 MATERIALS 306 609.03 CONSTRUCTION REQUIREMENTS 306 609.04 MEASURE AND PAYMENT 306 610 TRAFFIC BARRIERS 307 610.01 PCC MEDIAN AND ROADSIDE BARRIERS 307 610.02 PORTABLE PRECAST PCC BARRIER 309 610.03 PLASTIC JERSEY BARRIERS (WATER-FILLED TEMPORARY BARRIER TL- 2, TL- 3 SYSTEMS) 309 611 MEMBRANE WATERPROOFING 311 611.01 DESCRIPTION 311 611.02 MATERIALS 311 611.03 CONSTRUCTION REQUIREMENTS 311 611.04 MEASURE AND PAYMENT 311 612 TRAFFIC CONTROL 312 612.01 PERMANENT TYPE WOODEN BARRICADE 312 612.02 CONSTRUCTION LANE CLOSING 312 612.03 REMOVAL OF LANE MARKINGS 313 612.04 TEMPORARY CONSTRUCTION SIGN SUPPORTS 314 612.05 CONSTRUCTION WARNING AND DETOUR SIGNS 314 612.06 REFLECTORIZED TRAFFIC CONES 315 612.07 STEADY BURNING AMBER LIGHTS, TYPE C, AND FLASHING AMBER LIGHTS, TYPE B 315 612.08 ELECTRONICALLY ILLUMINATED TRAFFIC DEVICES (ARROW PANEL) 315 612.09 WORK ZONE BARRICADES 316 612.10 TRAFFIC DRUMS 316 612.11 REFLECTIVE MARKERS AND DELINEATORS 317 612.12 THERMOPLASTIC PAVEMENT MARKINGS 318 612.13 PAINTED LANE MARKINGS 319 612.14 PREFORMED PAVEMENT MARKINGS 320 612.15 TRUCK MOUNTED ATTENUATOR (TMA) 322 612.16 CONSTRUCTION ZONE ATTENUATOR 323 612.17 SAND FILLED IMPACT ATTENUATOR MODULES 324 612.18 PORTABLE CHANGEABLE MESSAGE SIGNS 324 612.19 STEEL PROTECTION PLATE 326 612.20 REPAIR OF DAMAGED MAJOR TRAFFIC CONTROL DEVICES 327 612.21 FLAGGER SERVICE 328 613 TRAFFIC SIGNALS 329 613.01 DESCRIPTION 329 xiv 613.02 CODES AND STANDARDS 329 613.03 MATERIALS 329 613.04 CONTRACT PLANS AND MANUFACTURER’S DRAWINGS 330 613.05 GENERAL CONSTRUCTION NOTES 331 613.06 COORDINATION WITH THE POTOMAC ELECTRIC POWER COMPANY 331 613.07 EXCAVATION AND BACKFILL 332 613.08 CONCRETE ENCASEMENT OF ELECTRICAL PVC CONDUIT 332 613.09 MANHOLES AND HANDBOXES 332 613.10 ENCASED PVC ELECTRICAL CONDUIT 333 613.11 GALVANIZED RIGID STEEL ELECTRICAL CONDUIT 335 613.12 REPAIR-REPLACE EXISTING PVC ENCASED ELECTRICAL CONDUIT 335 613.13 PCC FOUNDATIONS 335 613.14 GROUNDING AND BONDING 339 613.15 ELECTRICAL CABLE FOR TRAFFIC SIGNALS 339 613.16 FIBER OPTIC CABLE SYSTEM 345 613.17 GALVANIZED STEEL TRANSFORMER BASE 355 613.18 STEEL TRAFFIC SIGNAL POLE 355 613.19 ROUND STEEL MONOTUBE POLES WITH ROUND STEEL MONOTUBE ARM 356 613.20 WOOD POLE 35 FEET TALL OR LESS 356 613.21 TRAFFIC SIGNAL CLAMP ON MAST ARM 8 FEET TO 15 FEET LONG 357 613.22 TRAFFIC SIGNAL LIGHT EMITTING DIODE (LED) MODULE 357 613.23 VEHICULAR OR PEDESTRIAN TRAFFIC SIGNAL HEAD ON ANY POLE 357 613.24 OPTICALLY PROGRAMMABLE VEHICLE SIGNAL HEAD ON ANY POLE 358 613.25 VEHICULAR TRAFFIC SIGNAL HEAD ON ANY MAST ARM 358 613.26 OPTICALLY PROGRAMMABLE VEHICLE SIGNAL HEAD ON ANY MAST ARM 359 613.27 BACK PLATE ON POLE MOUNTED VEHICLE SIGNAL HEAD 360 613.28 OPTICALLY PROGRAMMABLE PEDESTRIAN SIGNAL HEAD ON ANY POLE 360 613.29 LIGHT EMITTING DIODE (LED) ELECTRONIC SIGN 360 613.30 LIGHT EMITTING DIODE (LED) ELECTRONIC SIGN ON ANY POLE 361 613.31 PEDESTRIAN PUSH BUTTON 361 613.32 ACCESSIBLE PEDESTRIAN SIGNAL (APS) SYSTEM 362 613.33 RAPID FLASHING BEACONS FOR VISION IMPAIRED CITIZENS AT CROSSWALKS 362 613.34 INDUCTIVE LOOP DETECTORS 363 613.35 MICROWAVE VEHICLE DETECTOR 365 613.36 MAGNETIC SENSOR DETECTORS 366 613.37 SENSOR REPEATER ON ANY POLE OR STRUCTURE 367 613.38 SENSOR ACCESS POINT ON ANY POLE 368 613.39 VIDEO TRAFFIC FLOW DETECTION SYSTEM (VTFDS) 369 613.40 MICROWAVE TRAFFIC FLOW DETECTION SYSTEM (MTFDS) 373 613.41 INFRARED TRAFFIC FLOW DETECTION SYSTEM (ITFDS) 376 613.42 ACOUSTIC TRAFFIC FLOW DETECTION SYSTEM (ATFDS) 378 613.43 CLASS X PIEZOELECTRIC SENSORS (X’) 382 613.44 LEAD-IN CABLE FOR PIEZO P X (X FEET) 383 613.45 SIDE-FIRED REMOTE TRAFFIC MICROWAVE SENSOR (RTMS) 383 613.46 IN-ROAD LIGHTING 385 613.47 TRAFFIC SIGNAL CONTROLLER AND CABINET 387 613.48 336SS TRAFFIC SIGNAL CABINET WITH CLASSIFIER/COUNTER AND RADIO FREQUENCY MODEM 388 613.49 CLOSED CIRCUIT TELEVISION (CCTV) CAMERA SYSTEM 392 xv 613.50 REMOVE ABANDONED STREET LIGHT OR TRAFFIC SIGNAL POLE FOUNDATION 392 613.51 REMOVE ABANDONED TRAFFIC SIGNAL CONTROLLER CABINET FOUNDATION 392 613.52 REMOVE TRAFFIC SIGNAL POLES AND TRAFFIC SIGNAL EQUIPMENT 393 613.53 REMOVE TRAFFIC SIGNAL CONTROLLER AND CABINET 393 613.54 REMOVE EXISTING SIGNAL HEAD 393 613.55 RELOCATE ANY SIZE VEHICULAR OR PEDESTRIAN SIGNAL HEAD FROM ONE POLE TO ANOTHER POLE 394 613.56 RELOCATE ANY STEEL TRAFFIC SIGNAL POLE FROM ONE FOUNDATION TO ANOTHER 395 613.57 MAINTAIN EXISTING TRAFFIC SIGNALS DURING CONSTRUCTION 395 613.58 SOLAR POWER SYSTEM 397 613.59 SPREAD SPECTRUM WIRELESS COMMUNICATION SYSTEM 400 613.60 ROADWAY WEATHER INFORMATION SYSTEM (RWIS) 400 613.61 DYNAMIC MESSAGE SIGN (DMS) 400 613.62 TRAFFIC SIGNAL CABLE REMOVAL 417 613.63 INITIAL ACCEPTANCE, GUARANTEE, AND FINAL ACCEPTANCE 417 614 STREETLIGHTING AND MISCELLANEOUS ELECTRICAL WORK 419 614.01 DESCRIPTION 419 614.02 CODES AND STANDARDS 419 614.03 MATERIALS 420 614.04 CONTRACT PLANS AND DRAWINGS 421 614.05 ELECTRICAL MANHOLE 422 614.06 REMOVE ELECTRICAL MANHOLE 423 614.07 FRAME AND COVER FOR MANHOLE 423 614.08 CLEAN ELECTRICAL MANHOLE 424 614.09 REMOVE HAZARDOUS WASTE MATERIALS FROM MANHOLE 424 614.10 REPAIR ELECTRICAL MANHOLE 424 614.11 ELECTRICAL HANDHOLE 425 614.12 ELECTRICAL CONDUITS (CONCRETE ENCASED) 425 614.13 ELECTRICAL CONDUITS (BORED) 427 614.14 ELECTRICAL CONDUITS (STRUCTURE MOUNTED) 428 614.15 ROD AND CLEAN DISTRICT-OWNED CONDUIT 428 614.16 REPAIR EXISTING DISTRICT-OWNED CONDUIT 428 614.17 ADDITIONAL CONDUIT AND SWEEP BENDS IN POLE FOUNDATION 429 614.18 PROBE-DISCOVER FAULTS IN THE STREETLIGHTING CABLE AND CONDUIT SYSTEM 429 614.19 DEVELOP REPAIR PROCEDURES FOR FAULTS IN THE STREETLIGHTING CABLE AND CONDUIT SYSTEM 429 614.20 DRAWINGS-PERMIT APPLICATION FOR REPAIR IN THE STREETLIGHTING SYSTEM 430 614.21 UNDERGROUND STREETLIGHT CABLES 430 614.22 OVERHEAD CABLES 431 614.23 COPPER GROUND WIRE 432 614.24 REMOVE UNDERGROUND CABLE 432 614.25 REMOVE EXPOSED RACEWAY ON WOOD POLE 432 614.26 FOUNDATION FOR STREETLIGHT POLES 433 614.27 REMOVE STREETLIGHT FOUNDATIONS 433 614.28 STREETLIGHT BASE – BREAKAWAY AND STEEL 434 xvi 614.29 STREETLIGHT POLE 434 614.30 WOOD POLE 435 614.31 REMOVE STREETLIGHT POLES 436 614.32 REMOVE STREETLIGHT CONTROL PEDESTAL 437 614.33 CLEAN AND PAINT STREETLIGHT POLES 437 614.34 ARM ON STREETLIGHT POLE 439 614.35 BANNER ARM ON STREETLIGHT POLE 439 614.36 STREETLIGHT GLOBE 440 614.37 LUMINAIRES 440 614.38 CONVERSION KITS 441 614.39 GLARE SHIELD FOR ANY TYPE OF FIXTURE 441 614.40 REMOVAL OF LUMINAIRES AND ARMS 442 614.41 SCHEDULE 40 PVC U-GUARD 442 614.42 GROUND ROD 443 614.43 PAYMENT TO TRAFFIC SIGNAL CONTRACTOR FOR CONNECTION AND DISCONNECTION OF TRAFFIC SIGNAL CABLES 443 614.44 PAYMENT TO PEPCO FOR CONNECTION, DISCONNECTION AND INSPECTION OF SERVICE TO STREETLIGHTS 443 614.45 ELECTRICAL JUNCTION BOX 444 614.46 INCIDENTAL ITEMS 444 614.47 NAVIGATION LIGHTS 445 614.48 REMOTE MONITORING SYSTEM (RMS) 447 614.49 OVERHEAD SIGN LIGHTING SYSTEM 447 614.50 ELECTRICAL RECEPTACLE ON STREETLIGHT POLE FOR SEASONAL LIGHTING 447 614.51 GATEWAY SIGN SYSTEM 448 614.52 REMOVE PVC COATED RIGID STEEL CONDUIT 448 615 MECHANICAL WORK 449 615.01 DESCRIPTION 449 615.02 CODES AND STANDARDS 449 615.03 MATERIALS 449 615.04 SHOP AND WORKING DRAWINGS 449 615.05 VENTILATION SYSTEM 449 615.06 PUMPING SYSTEM 450 615.07 MOTORS 450 615.08 MEASURE AND PAYMENT 450 616 TRAFFIC SIGNING 451 616.01 WOOD SIGN POSTS 451 616.02 METAL SIGN POSTS 451 616.03 GUIDE SIGN PANELS AND TRAFFIC SIGN PANELS 452 616.04 FEDERAL AID PROJECT SIGN 454 616.05 DELINEATORS, REFERENCE POSTS AND OBJECT MARKERS 454 616.06 BREAKAWAY BASE SIGN SUPPORT SYSTEMS 455 616.07 MODIFY AND REPAIR EXISTING SIGN 455 616.08 REMOVE AND RELOCATE EXISTING SIGNS AND SUPPORTS 455 617 IMPACT ATTENUATORS 457 617.01 DESCRIPTION 457 617.02 SAND-FILLED MODULE IMPACT ATTENUATOR 457 xvii 617.03 QUAD BEAM IMPACT ATTENUATOR 458 618 EROSION AND SEDIMENT CONTROL 460 618.01 DESCRIPTION 460 618.02 CONSTRUCTION REQUIREMENTS 460 618.03 MEASURE AND PAYMENT 461 619 ANTI-GRAFFITI COATING 462 619.01 DESCRIPTION 462 619.02 MATERIALS 462 619.03 JOB PERFORMANCE 463 619.04 ENVIRONMENTAL PROTECTION 464 619.05 COATING SYSTEMS 465 619.06 SURFACE PREPARATION 466 619.07 GENERAL REQUIREMENTS FOR PAINT APPLICATION 466 619.08 MEASURE AND PAYMENT 468 DIVISION 700 STRUCTURES 469 701 PILING 475 701.01 DESCRIPTION 475 701.02 MATERIALS 475 701.03 PREPARATION FOR DRIVING 475 701.04 DRIVING 475 701.05 LENGTH TEST PILES AND LOAD TESTS 477 701.06 STEEL H PILES 482 701.07 CAST-IN-PLACE CONCRETE PILES (STEEL CASING) 482 701.08 PRECAST REINFORCED CONCRETE PILES 482 701.09 PRECAST PRESTRESSED CONCRETE PILES 483 701.10 TIMBER PILES 483 701.11 MEASURE AND PAYMENT 484 702 DRILLED SHAFTS (CAISSONS) 486 702.01 DESCRIPTION 486 702.02 MATERIALS 486 702.03 CONSTRUCTION 486 702.04 LOAD TESTS 488 702.05 CROSS-HOLE SONIC LOGGING (CSL) TESTING FOR DRILLED SHAFTS 488 702.06 MEASURE AND PAYMENT 490 703 CONCRETE FOR STRUCTURES 491 703.01 DESCRIPTION 491 703.02 MATERIALS 491 703.03 PROPORTIONING 491 703.04 HANDLING, MEASURING AND BATCHING MATERIALS 492 703.05 MIXING CONCRETE 492 703.06 TESTING AND ACCEPTANCE 493 703.07 WEATHER RESTRICTIONS AND NIGHT WORK 495 703.08 PLACING CONCRETE 496 703.09 CONSOLIDATION 497 703.10 PLACING CONCRETE BEHIND STONE MASONRY 497 xviii 703.11 DEPOSITING CONCRETE UNDERWATER 498 703.12 PUMPING CONCRETE 498 703.13 CONSTRUCTION JOINTS 499 703.14 WOOD CONCRETE FORMS 499 703.15 TEMPORARY STEEL BRIDGE DECK FORMS 501 703.16 FALSEWORK AND CENTERING 502 703.17 REMOVAL OF FALSEWORK AND FORMS 503 703.18 CONCRETE PARAPETS AND BARRIERS 503 703.19 CURING CONCRETE STRUCTURES 504 703.20 FINISHING EXPOSED CONCRETE STRUCTURES 505 703.21 MASONRY BEARING AREAS AND ANCHOR BOLTS 506 703.22 BRIDGE DECKS AND APPROACH SLABS 507 703.23 SIDEWALK, MEDIAN AND CURB FINISH 508 703.24 TOLERANCES 508 703.25 CONCRETE BONDING WITH EPOXY 508 703.26 SELF-CONSOLIDATING CONCRETE 508 703.27 MEASURE AND PAYMENT 511 704 REINFORCING STEEL 512 704.01 DESCRIPTION 512 704.02 MATERIALS 512 704.03 SHOP DRAWINGS 512 704.04 FABRICATION 512 704.05 PROTECTION OF MATERIALS 512 704.06 PLACING AND FASTENING 512 704.07 SPLICING 513 704.08 SUBSTITUTIONS 513 704.09 EPOXY COATED BARS 513 704.10 MEASURE AND PAYMENT 514 705 PRESTRESSED CONCRETE UNITS 516 705.01 DESCRIPTION 516 705.02 MATERIALS 516 705.03 EQUIPMENT 516 705.04 CONCRETE CONSTRUCTION 516 705.05 PRETENSIONING 517 705.06 POST-TENSIONING 517 705.07 TRANSPORTATION AND STORAGE 518 705.08 MEASURE AND PAYMENT 519 706 STRUCTURAL STEEL 520 706.01 DESCRIPTION 520 706.02 MATERIALS 520 706.03 WORKMANSHIP 520 706.04 SHOP DRAWINGS 521 706.05 INSPECTION 521 706.06 SHOP STORAGE OF MATERIAL 522 706.07 STRAIGHTENING MATERIAL 522 706.08 FLAME CUTTING 522 706.09 BENT PLATES 522 xix 706.10 ANNEALING AND STRESS RELIEVING 523 706.11 HOLES FOR BOLTS 523 706.12 FINISHING AND FITTING 524 706.13 CAMBER 525 706.14 SHOP ASSEMBLING 525 706.15 PINS AND ROLLERS 526 706.16 BOLTS AND BOLTED CONNECTIONS 526 706.17 HIGH-STRENGTH STEEL BOLT CONNECTIONS 527 706.18 WELDING 531 706.19 SHEAR DEVICES 533 706.20 PAINTING 533 706.21 MARKING AND SHIPPING 533 706.22 BEARINGS AND ANCHORAGE 534 706.23 ERECTION 534 706.24 MEASURE AND PAYMENT 535 707 PAINTING 537 707.01 DESCRIPTION 537 707.02 MATERIALS 537 707.03 JOB PERFORMANCE 539 707.04 ENVIRONMENTAL PROTECTION 542 707.05 COATING SYSTEMS 545 707.06 SURFACE PREPARATION 546 707.07 GENERAL REQUIREMENTS FOR PAINT APPLICATION 548 707.08 SHOP PAINTING 550 707.09 FIELD PAINTING 551 707.10 MEASURE AND PAYMENT 552 708 STONE MASONRY 553 708.01 GENERAL 553 708.02 MATERIALS 553 708.03 WORKING DRAWINGS AND SUPPLY 553 708.04 SAMPLES AND SAMPLE WALL 553 708.05 CLASSES OF STONE MASONRY 554 708.06 SIZE OF STONE 554 708.07 FINISH FOR EXPOSED FACES 554 708.08 DRESSING STONE 555 708.09 ANCHORS 556 708.10 CONSTRUCTION REQUIREMENTS 556 708.11 REJECTION OF STONE 558 708.12 MEASURE AND PAYMENT 558 709 RAILING 560 709.01 DESCRIPTION 560 709.02 MATERIALS 560 709.03 FABRICATION 560 709.04 ERECTION 560 709.05 MEASURE AND PAYMENT 561 710 BRIDGE DECK DRAINAGE 562 xx 710.01 DESCRIPTION 562 710.02 MATERIALS 562 710.03 CONSTRUCTION REQUIREMENTS 562 710.04 MEASURE AND PAYMENT 562 711 WALL DRAINS AND CLEANOUTS 563 711.01 DESCRIPTION 563 711.02 MATERIALS 563 711.03 CONSTRUCTION REQUIREMENTS 563 711.04 MEASURE AND PAYMENT 563 712 GLAZED CERAMIC TILE 564 712.01 DESCRIPTION 564 712.02 MATERIALS 564 712.03 CONSTRUCTION REQUIREMENTS 564 712.04 MEASURE AND PAYMENT 566 713 STEEL SIGN STRUCTURES 567 713.01 DESCRIPTION 567 713.02 MATERIALS 567 713.03 MILL AND SHOP PROCEDURES 567 713.04 WELDING 567 713.05 TRANSPORTATION AND FIELD STORAGE 567 713.06 ERECTION METHODS 568 713.07 ERECTION ON EXISTING STRUCTURES 568 713.08 MEASURE AND PAYMENT 568 714 BRIDGE DECK CONCRETE OVERLAYS 569 714.01 DESCRIPTION 569 714.02 LOW SLUMP CONCRETE OVERLAY 569 714.03 LATEX-MODIFIED CONCRETE OVERLAY 570 714.04 MICROSILICA CONCRETE OVERLAY 574 714.05 MEASURE AND PAYMENT 577 715 CONCRETE BRIDGE DECK REPAIR 578 715.01 DESCRIPTION 578 715.02 MATERIALS 578 715.03 EQUIPMENT 578 715.04 REMOVAL 579 715.05 CONCRETE DECK REPAIR 579 715.06 MEASURE AND PAYMENT 579 716 REPAIR-REPLACE PCC STRUCTURE 580 716.01 GENERAL 580 716.02 MATERIALS 580 716.03 SUBMITTAL 581 716.04 CONSTRUCTION METHOD CONCRETE REPAIR OR PATCH 581 716.05 REPAIR TYPE 1, CONCRETE REPAIR 581 716.06 REPAIR TYPE 2, CONCRETE PATCH 582 716.07 REPAIR TYPE 3, CRACK REPAIR 582 716.08 MEASURE AND PAYMENT 583 xxi 716.09 PNEUMATICALLY APPLIED CONCRETE 583 717 ARMORED JOINT WITH NEOPRENE STRIP SEAL 587 717.01 DESCRIPTION 587 717.02 MATERIALS 587 717.03 SHOP DRAWINGS 588 717.04 FABRICATION 588 717.05 CONSTRUCTION REQUIREMENTS 588 717.06 MEASURE AND PAYMENT 588 718 NEOPRENE COMPRESSION SEAL 589 718.01 DESCRIPTION 589 718.02 MATERIALS 589 718.03 CONSTRUCTION REQUIREMENTS 589 718.04 MEASURE AND PAYMENT 589 719 FINGER PLATE EXPANSION DEVICE 590 719.01 DESCRIPTION 590 719.02 MATERIALS 590 719.03 CONSTRUCTION REQUIREMENTS 590 719.04 MEASURE AND PAYMENT 591 720 PROTECTION SHIELD 592 720.01 DESCRIPTION 592 720.02 SHOP DRAWINGS 592 720.03 CONSTRUCTION REQUIREMENTS 592 720.04 MAINTENANCE 592 720.05 MEASURE AND PAYMENT 592 DIVISION 800 MATERIALS 593 801 HYDRAULIC CEMENT/CEMENTIOUS MATERIALS 599 801.01 PORTLAND CEMENT 599 801.02 MASONRY CEMENT 599 801.03 BLENDED HYDRAULIC CEMENT 599 801.04 GRANULATED IRON BLAST FURNACE SLAG 599 801.05 FLY ASH USED IN PORTLAND CEMENT CONCRETE 599 802 BITUMINOUS MATERIALS 600 802.01 GENERAL 600 802.02 PERFORMANCE GRADED ASPHALT 600 802.03 CUT-BACK ASPHALT 601 802.04 EMULSIFIED ASPHALT 601 802.05 BITUMINOUS MATERIALS FOR WATERPROOFING 601 802.06 SOFTENING AGENT 601 802.07 LIQUID ANTI STRIP ADDITIVE 601 802.08 EMULSIFIED ASPHALT FOR CONCRETE VAULTS 601 802.09 ASPHALT FOR PERMEABLE BASE 601 803 AGGREGATES 602 803.01 FINE AGGREGATE FOR PORTLAND CEMENT CONCRETE 602 803.02 COARSE AGGREGATE FOR PORTLAND CEMENT CONCRETE 602 xxii 803.03 FINE AGGREGATE FOR BITUMINOUS CONCRETE 602 803.04 COARSE AGGREGATE FOR BITUMINOUS CONCRETE 603 803.05 MINERAL FILLER FOR BITUMINOUS CONCRETE 603 803.06 FINE AGGREGATE FOR MASONRY MORTAR 604 803.07 LIGHTWEIGHT AGGREGATE FOR STRUCTURAL CONCRETE 604 803.08 AGGREGATE FOR SLURRY SEAL 604 803.09 AGGREGATE FOR RIPRAP 605 804 AGGREGATES FOR SOILS AND BASE COURSE CONSTRUCTION 606 804.01 GENERAL 606 804.02 EMBANKMENT BACKFILL 606 804.03 BLANKET SOIL 606 804.04 BASE COURSE AND/OR STRUCTURAL BACKFILL 606 804.05 TRENCH BACKFILL 607 804.06 TRENCH SUBGRADE GRAVEL 608 804.07 FLOWABLE BACKFILL 608 805 AGGREGATES FOR DRAINAGE 609 805.01 GENERAL 609 805.02 FINE AGGREGATE FOR PERVIOUS FILL 609 805.03 COARSE AGGREGATE FOR UNDERDRAIN 609 805.04 BLANKET SOIL FOR UNDERDRAIN 609 806 MASONRY UNITS 610 806.01 CLAY OR SHALE BRICK 610 806.02 PRESSED CONCRETE BLOCK PAVERS 610 806.03 CONCRETE BRICK 610 806.04 GLAZED CERAMIC TILE 610 806.05 MORTAR MIXTURES 613 807 JOINT MATERIALS 615 807.01 PREFORMED EXPANSION JOINT FILLER 615 807.02 JOINT SEALING MATERIALS 615 807.03 LOAD TRANSFER ASSEMBLIES 615 807.04 TIE ROD ASSEMBLIES AND TIE RODS 616 807.05 WATERSTOPS 616 807.06 COMPRESSION SEALS 617 807.07 TILE JOINT SEALANT 617 808 NON METALLIC PIPE 618 808.01 PCC PIPE 618 808.02 POLYVINYL CHLORIDE (PVC) PIPE 618 808.03 GASKETS 619 809 METAL PIPE AND FITTINGS 620 809.01 DUCTILE IRON PIPE AND FITTINGS 620 809.02 CORRUGATED METAL CULVERT PIPE AND PIPE UNDERDRAIN 622 809.03 CAST IRON PIPE 622 809.04 STEEL PIPE 622 809.05 COPPER TUBE 622 810 VALVES AND HYDRANTS 623 xxiii 810.01 VALVES 623 810.02 FIRE HYDRANTS 625 811 PAINTS, COATINGS, AND PRESERVATIVES 628 811.01 GENERAL 628 811.02 PRIME COAT 629 811.03 INTERMEDIATE (MID) COAT 630 811.04 TOPCOAT 631 811.05 SOLVENTS 632 811.06 GALVANIZING 632 811.07 WOOD PRESERVATIVES 632 811.08 PREQUALIFIED COATING SYSTEMS 632 812 REINFORCING STEEL AND WIRE ROPE 633 812.01 WELDED WIRE FABRIC 633 812.02 DEFORMED REINFORCING STEEL 633 812.03 EPOXY COATED REINFORCEMENT BARS 633 813 FENCE AND GUARDRAIL 634 813.01 BARBED WIRE 634 813.02 WOVEN WIRE FENCE FABRIC 634 813.03 CHAIN LINK FENCE 634 813.04 METAL BEAM RAIL 634 813.05 TIMBER RAIL 634 813.06 FENCE POSTS 635 813.07 GUARDRAIL POSTS 635 813.08 BOX BEAM RAIL 635 814 CONCRETE CURING MATERIALS AND ADMIXTURES 636 814.01 CURING MATERIALS 636 814.02 LIQUID MEMBRANE CURING COMPOUNDS 636 814.03 AIR ENTRAINING ADMIXTURES 636 814.04 CHEMICAL ADMIXTURES 636 814.05 COLOR ADMIXTURES 636 815 METAL FOR STRUCTURES 637 815.01 STRUCTURAL STEEL 637 815.02 PRESTRESSING REINFORCEMENT 638 815.03 STEEL CASTINGS 639 815.04 GRAY IRON CASTINGS 639 815.05 DUCTILE IRON CASTINGS 639 815.06 CARBON STEEL FORGINGS 639 815.07 ALLOY STEEL FORGINGS 639 815.08 COLD FINISHED CARBON STEEL SHAFTING 639 815.09 COPPER-ALLOY PLATES 639 815.10 SHEET ZINC 640 815.11 COPPER FLASHING 640 815.12 TURNBUCKLES 640 816 PILES 642 816.01 TIMBER PILES 642 xxiv 816.02 STEEL H-PILES 642 816.03 CAST-IN-PLACE PILES 642 816.04 UNFILLED TUBULAR STEEL PILES 642 816.05 BITUMEN COATING FOR STEEL PILES 642 817 PORTLAND CEMENT CONCRETE MIXTURES 643 817.01 PCC MIX DESIGN 643 817.02 MATERIALS 644 817.03 DESIGN CRITERIA 644 817.04 DESIGN ADJUSTMENTS 646 817.05 LOW PERMEABILTY STRUCTURAL CONCRETE 646 817.06 CONSTRUCTION METHODS 647 818 BITUMINOUS CONCRETE MIXTURES 649 818.01 GENERAL 649 818.02 DESIGN CRITERIA 649 819 HIGH PERFORMANCE BITUMINOUS COLD MIX MATERIAL 653 819.01 DESCRIPTION 653 819.02 PERFORMANCE REQUIREMENTS 653 819.03 CURING TIME 653 819.04 RELIABILITY 653 819.05 MATERIALS 653 820 STREETLIGHTING AND ELECTRICAL MATERIALS 654 820.01 GENERAL 654 820.02 LIGHTING STANDARDS 654 820.03 LUMINAIRES, LAMPS AND GLOBES 657 820.04 HOUSING ASSEMBLIES 663 820.05 BALLASTS AND DRIVERS 663 820.06 SOCKETS 663 820.07 REFLECTORS 663 820.08 REFRACTORS 663 820.09 JUNCTION BOXES AND COVERS 664 820.10 GROUND RODS 664 820.11 WIRES 664 820.12 ELECTRICAL CONDUIT 665 820.13 CONDUIT EXPANSION AND DEFLECTION FITTINGS 665 820.14 CIRCUIT IDENTIFICATION MATERIALS 665 820.15 STEEL TRANSFORMER BASE 666 820.16 LIGHT EMITTING DIODE (LED) LUMINAIRE 666 820.17 REMOTE MONITORING SYSTEM (RMS) 669 821 LINE STRIPING MATERIAL 671 821.01 GENERAL 671 821.02 HOT EXTRUDED LEAD-FREE THERMOPLASTIC COMPOUND 671 821.03 EPOXY LINE STRIPING MATERIAL 672 821.04 TRAFFIC PAINT 674 821.05 POLYESTER LINE STRIPING MATERIAL 675 821.06 PERMANENT PREFORMED LINE STRIPING MATERIAL 676 821.07 PERMANENT PREFORMED PATTERNED LINE STRIPING MATERIAL 677 xxv 821.08 PERMANENT PREFORMED LINE STRIPING MATERIAL – HEAT APPLIED 677 821.09 REMOVABLE PREFORMED LINE STRIPING MATERIAL 679 821.10 GLASS BEADS 680 822 MISCELLANEOUS MATERIALS 681 822.01 WATER 681 822.02 BEARING PADS 681 822.03 LIME 682 822.04 PRECAST PCC SEWER-WATER UNITS 682 822.05 ADAPTER RINGS 682 822.06 ANCHOR BOLTS 682 822.07 MANHOLE STEPS 682 822.08 EPOXY 682 822.09 GEOTEXTILE FABRICS AND MEMBRANES 683 822.10 DAMPPROOFING AND WATERPROOFING MEMBRANE 684 822.11 LOOP SEALANT 684 822.12 WOOD 685 822.13 RAISED REFLECTIVE DELINEATORS 685 822.14 IMPERVIOUS SUBGRADE MATERIAL 689 822.15 FORMULATED LATEX MODIFIER 689 822.16 PIPE JOINTING COMPOUND 690 823 ROADSIDE IMPROVEMENTS 691 823.01 TOPSOIL 691 823.02 FERTILIZERS 691 823.03 SEED 692 823.04 MULCH 693 823.05 SOD 693 823.06 PEAT 693 823.07 PLANT MATERIALS 694 823.08 PLANTING MATERIALS 694 824 SIGNAGE 696 824.01 SIGN POSTS 696 824.02 REFLECTIVE SHEETING 696 824.03 STEEL SIGN STRUCTURES 696 824.04 GUIDE SIGN PANELS, TRAFFIC SIGN PANELS, HAZARD DELINEATORS, DEMOUNTABLE CHARACTERS AND DELINEATORS 697 825 TRAFFIC SIGNAL MATERIALS 699 825.01 TYPE 170 MICROPROCESSOR-BASED TRAFFIC SIGNAL CONTROLLER AND CABINET ASSEMBLY 699 825.02 ELECTRONIC SECURITY LOCK 731 825.03 336SS TRAFFIC CONTROLLER AUTOMATIC TRANSFER SWITCH 742 825.04 336SS TRAFFIC CONTROLLER CABINET UPS UNIT 743 825.05 BOLT ON UPS CABINET ASSEMBLY WITH INVERTER CHARGER AND BATTERY BANK 745 825.06 WOOD POLES 751 825.07 CCTV CAMERA AND ASSOCIATED EQUIPMENT SPECIFICATION 753 825.08 ACCESSIBLE PEDESTRIAN SIGNAL (APS) UNITS 754 xxvi 825.09 LIGHT EMITTING DIODE (LED) VEHICLE SIGNAL MODULES 756 825.10 CONVENTIONAL POLYCARBONATE VEHICLE SIGNAL HEAD 763 825.11 CONVENTIONAL POLYCARBONATE PEDESTRIAN SIGNAL HEAD 764 825.12 VEHICLE SIGNAL BACK PLATE 766 825.13 MAST ARM MOUNT SIGNAL BRACKET 766 825.14 LIGHT EMITTING DIODE (LED) COUNTDOWN PEDESTRIAN SIGNAL MODULES 768 825.15 PEDESTRIAN PUSH BUTTONS 774 825.16 RADAR BASED STOP BAR DETECTION DEVICES 775 825.17 RADAR PRESENCE DETECTOR INSTALLATION 780 825.18 MICROWAVE VEHICLE DETECTOR 782 825.19 MICROWAVE VEHICLE DETECTOR ISOLATION MODULE WITH 12 VAC OUTPUT 783 825.20 LOOP DETECTOR SLOT SEALANT 784 825.21 CLAMP ON MAST ARM 784 825.22 20-FOOT TALL STEEL TRAFFIC SIGNAL POLE 785 825.23 GALVANIZED STEEL TRANSFORMER BASE 786 825.24 LIGHT EMITTING DIODE (LED) ELECTRONIC SIGN 787 825.25 ETHERNET WIRELESS 900MHZ SPREAD SPECTRUM RADIO 791 825.26 3G CELLULAR DATA RADIO 793 825.27 HARDENED ETHERNET SWITCH 794 825.28 FIBER OPTIC CABLE SYSTEM MATERIALS 797 825.29 MAGNETIC SENSOR DETECTOR 804 825.30 ROAD WEATHER INFORMATION SYSTEM MATERIALS SPECIFICATION 804 826 GREEN COLORED PAVEMENT 806 826.01 ALLOWABLE USES 806 826.02 DESIGN OF GREEN COLORED PAVEMENT 806 826.03 OTHER 806 DIVISION 900 EQUIPMENT 807 901 GENERAL 809 902 EARTHWORK EQUIPMENT 810 902.01 TANDEM ROLLERS 810 902.02 TAMPING OR SHEEPSFOOT ROLLERS 810 902.03 PNEUMATIC TIRED ROLLERS 810 902.04 VIBRATORY ROLLERS 810 902.05 TAMPERS 810 902.06 EQUIPMENT IDENTIFICATION 811 903 GENERAL CONSTRUCTION EQUIPMENT 812 903.01 MILLING MACHINE 812 903.02 JOINT SEALER MELTING - APPLICATOR APPARATUS 812 903.03 STRAIGHTEDGES 812 904 BITUMINOUS EQUIPMENT 813 904.01 BITUMINOUS MIXING PLANTS 813 904.02 TRUCKS FOR TRANSPORTING BITUMINOUS MIXTURES 814 904.03 PRESSURE DISTRIBUTORS 814 904.04 BITUMINOUS PAVERS 814 904.05 ASPHALT ROLLERS 815 xxvii 904.06 HAND TOOLS FOR FINISHING ASPHALT SURFACES 815 905 PORTLAND CEMENT CONCRETE EQUIPMENT 816 905.01 BATCH PLANTS FOR PORTLAND CEMENT CONCRETE 816 905.02 MIXERS, PAVERS, AND DELIVERY EQUIPMENT 817 905.03 FORMS FOR CONCRETE PAVING 817 905.04 GRADE TEMPLATES 818 905.05 SPREADING MACHINES 818 905.06 CONCRETE FINISHING MACHINES 818 905.07 VIBRATORS 819 905.08 MEMBRANE CURING EQUIPMENT 819 905.09 HAND TOOLS 819 APPENDIX PAVEMENT SMOOTHNESS SPECIFICATION 821 APPENDIX I PAVEMENT RIDE QUALITY 823 APPENDIX I.01 DESCRIPTION 823 APPENDIX I.02 RELATED STANDARDS 823 APPENDIX I.03 TERMINOLOGY 824 APPENDIX I.04 RIDE QUALITY MEASUREMENT PLAN 825 APPENDIX I.05 GENERAL RIDE QUALITY MEASUREMENT REQUIREMENTS 826 APPENDIX I.06 RIDE QUALITY DETERMINATION 826 APPENDIX I.07 RIDE QUALITY MEASUREMENT VERIFICATION 827 APPENDIX I.08 MEASUREMENT AND REPORTING 827 APPENDIX I.09 PAYMENT 828 APPENDIX II EQUIPMENT SPECIFICATION AND TEST METHOD FOR RIDE QUALITY DATA COLLECTION 832 APPENDIX II.01 SCOPE 832 APPENDIX II.02 RELATED STANDARDS 832 APPENDIX II.03 TERMINOLOGY 832 APPENDIX II.04 GENERAL SYSTEM REQUIREMENTS 834 APPENDIX II.05 EQUIPMENT REQUIREMENTS 834 APPENDIX II.06 SYSTEM ACCURACY REQUIREMENTS 836 APPENDIX II.07 TESTING PROCEDURE 838 APPENDIX II.08 REPORTING 839 ATTACHMENT A PRETEST CALIBRATION REPORT 841 ATTACHMENT B ELECTRONIC DATA FORMAT 842 INDEX 845 xxviii DIVISION 100 GENERAL REQUIREMENTS 101 DEFINITIONS AND TERMS 5 101.01 GENERAL 5 101.02 ABBREVIATIONS 5 101.03 DEFINITIONS 6 102 BIDDING REQUIREMENTS GOVERNMENT OF THE DISTRICT OF COLUMBIA STANDARD CONTRACT PROVISIONS FOR USE WITH SPECIFICATIONS FOR DISTRICT OF COLUMBIA GOVERNMENT CONSTRUCTION PROJECTS 1973, AS AMENDED 11 102.01 INSTRUCTIONS TO BIDDERS (CONSTRUCTION) 11 102.02 PROPOSAL FORMS 15 102.03 RESERVED 15 102.04 AFFIRMATIVE ACTION PROGRAM 15 102.05 NON COLLUSION 16 102.06 ANTI-DISCRIMINATION CLAUSE 16 102.07 EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION 16 102.08 NONSEGREGATED FACILITIES CERTIFICATION 16 102.09 RESERVED 16 102.10 EMPLOYMENT OF THE HANDICAPPED 16 103 STANDARD CONTRACT PROVISIONS 17 103.01 GENERAL PROVISIONS (CONSTRUCTION CONTRACT) 17 103.02 CONTRACT LABOR PROVISIONS 33 103.03 EQUAL EMPLOYMENT OPPORTUNITY RESPONSIBILITIES 44 103.04 EMPLOYEE TRAINING REQUIREMENTS 48 104 SCOPE OF WORK 50 104.01 INTENT OF CONTRACT 50 104.02 MAINTENANCE OF TRAFFIC 50 104.03 VALUE ENGINEERING PROPOSALS BY CONTRACTOR 52 105 CONTROL OF WORK 54 105.01 CHIEF ENGINEER’S AUTHORITY 54 105.02 PLANS AND WORKING DRAWINGS 54 105.03 CONFORMITY WITH PLANS AND SPECIFICATIONS 55 105.04 COORDINATION OF PLANS AND SPECIFICATIONS 55 105.05 COOPERATION WITH UTILITY RELOCATION 55 105.06 FIELD LAYOUT 56 105.07 INSPECTOR’S AUTHORITY 56 105.08 LOAD RESTRICTIONS 57 105.09 FAILURE TO MAINTAIN ROADWAY OR STRUCTURE 57 105.10 WEEKEND WORK 57 105.11 NIGHT WORK AND NOISE LEVEL RESTRICTIONS 57 105.12 REMOVAL OF UNACCEPTABLE AND UNAUTHORIZED WORK AND MATERIALS 58 105.13 INSPECTION – ACCEPTANCE 58 106 CONTROL OF MATERIALS 59 106.01 SOURCE OF SUPPLY AND QUALITY 59 106.02 SAMPLES, TESTS AND CITED SPECIFICATIONS 59 1 106.03 MATERIALS COMPLIANCE CERTIFICATION 61 106.04 PLANT INSPECTION 62 106.05 QUALITY CONTROL OF PLANTS 62 106.06 FIELD FACILITIES 62 106.07 STORAGE OF MATERIALS 64 106.08 HANDLING OF MATERIALS 64 106.09 UNACCEPTABLE MATERIALS 64 106.10 MATERIAL SHORTAGES 65 106.11 MATERIALS ORDER 65 106.12 PROCESSING OF MATERIALS 65 106.13 CONTRACTOR PROCESS QUALITY CONTROL AT ASPHALT AND CONCRETE PLANTS 65 106.14 MINIMUM REQUIREMENTS FOR TESTING LABORATORIES AT ASPHALT AND CONCRETE PLANTS 69 107 LEGAL RELATIONS & RESPONSIBILITY TO PUBLIC 70 107.01 RESTORATION OF SURFACES OPENED BY PERMIT 70 107.02 FEDERAL PARTICIPATION (FEDERAL-AID PROJECTS) 70 107.03 SANITARY, HEALTH AND SAFETY PROVISIONS 70 107.04 PUBLIC CONVENIENCE AND SAFETY 70 107.05 RAILWAY-HIGHWAY PROVISIONS 70 107.06 CONSTRUCTION OVER OR ADJACENT TO NAVIGABLE WATERS 70 107.07 BARRICADES AND WARNING SIGNS 71 107.08 EMERGENCY PROCESS 71 107.09 USE OF EXPLOSIVES 71 107.10 PROTECTION AND RESTORATION OF PROPERTY AND LANDSCAPE 71 107.11 NATIONAL HISTORIC PRESERVATION ACT OF 1966 71 107.12 TREE PROTECTION AND REPLACEMENT 72 107.13 INSURANCE 72 107.14 OPENING OF SECTIONS OF PROJECT TO TRAFFIC 73 107.15 CONTRACTOR’S RESPONSIBILITY FOR WORK 73 107.16 UTILITY PROTECTIVE ALERT 73 107.17 ENVIRONMENTAL PROTECTION 74 107.18 WATER SUPPLY 78 107.19 CIVIL RIGHTS 78 108 PROSECUTION AND PROGRESS 79 108.01 SUBLETTING OF CONTRACT 79 108.02 NOTICE TO PROCEED 79 108.03 CONSTRUCTION SCHEDULING 79 108.04 MOBILIZATION 80 108.05 ENGINEER’S FIELD FACILITIES 81 108.06 LIMITATION OF OPERATIONS 83 108.07 METHODS AND EQUIPMENT 83 108.08 DETERMINATION OF CONTRACT TIME AND PARTIAL SUSPENSION 83 108.09 SUBSTANTIAL COMPLETION AND FINAL ACCEPTANCE 84 108.10 PROGRESS PHOTOGRAPHS 86 108.11 DIMENSIONS OF EXISTING FACILITIES 86 108.12 ADVERSE WEATHER PRECAUTIONS 86 108.13 PRECONSTRUCTION SURVEY 86 2 108.14 FIELD LAYOUT 86 108.15 AS BUILT DRAWINGS 87 109 MEASURE AND PAYMENT 88 109.01 MEASUREMENT OF QUANTITIES 88 109.02 SCOPE OF PAYMENT 88 109.03 EXTRA AND FORCE ACCOUNT WORK 88 109.04 ELIMINATED ITEMS 89 109.05 PROGRESS PAYMENTS 89 109.06 PAYMENT TO SUBCONTRACTORS AND SUPPLIERS CERTIFICATE 89 109.07 PAYMENT FOR STOCKPILED MATERIALS 89 109.08 ACCEPTANCE AND FINAL PAYMENT 90 3 DEFINITIONS AND TERMS 101 101 DEFINITIONS AND TERMS 101.01 GENERAL Unless the intent is clearly otherwise apparent, words, clauses and phrases used in the Department’s projects shall be construed according to rules of grammar and approved usage contained in Webster’s Third New International Dictionary, Unabridged. 101.02 ABBREVIATIONS Whenever the following abbreviations are used in these specifications or on the plans, the intent and meaning shall be interpreted as follows: AAN American Association of Nurserymen AAR Association of American Railroads AASHTO American Association of State Highway and Transportation Officials ABS Acrylonitrile-Butadiene-Styrene AC Asphalt Concrete ACI American Concrete Institute AGC Associated General Contractors of America, Inc. AGMA American Gear Manufacturers Association AIA American Institute of Architects AISC American Institute of Steel Construction AISI American Iron and Steel Institute ANSI American National Standards Institute APA American Plywood Association AREA American Railway Engineering Association ASCE American Society of Civil Engineers ASLA American Society of Landscape Architects ASME American Society of Mechanical Engineers ASTM American Society for Testing and Materials AWG American Wire Gauge AWS American Welding Society AWPA American Wood Preservers Association AWWA American Water Works Association CRSI Concrete Reinforcing Steel Institute CS Commercial Standards EPA U.S. Environmental Protection Agency FHWA Federal Highway Administration, U.S. Department of Transportation FS Federal Supply Standards FSS Federal Supply Standards, (General Services Administration) IEEE Institute of Electrical and Electronic Engineers, Inc. 5 101 DEFINITIONS AND TERMS MIL Military Specifications MUTCD Manual on Uniform Traffic Control Devices NEC National Electrical Code NEMA National Electrical Manufacturers Association NPS National Park Service, U.S. Department of the Interior NPT National Pipe Thread OSHA Occupational Safety and Health Administration, U.S. Department of Labor PCA Portland Cement Association PCC Portland Cement Concrete PTFE Polytetrafluoroethylene PVC Polyvinylchloride SAE Society of Automotive Engineers SP Special Provision SSPC Steel Structures Painting Council TAI The Asphalt Institute TCP Traffic Control Plan UL Underwriter’s Laboratories Incorporated USS Gage United States Standard Gage WSP Working Steam Pressure When reference is made to specifications of any organization listed above, or to any additional referenced specifications, the specifications shall be the current edition in effect on the date of advertising of the Contract. 101.03 DEFINITIONS Whenever the following terms are used, intent and meaning shall be interpreted as follows: Addendum – Change in Contract Documents issued in writing prior to opening of bids. Advertisement – A public announcement, as required by law, inviting bids for work to be performed, materials to be furnished, or proposals to be developed. Such Advertisements will indicate with reasonable accuracy the quantity and location of the Work to be done or the character and quantity of the material to be furnished and the time and place of the opening of Proposals. Alley – Public passageway for vehicles, pedestrians, drainage purposes, or any combination thereof, which connects with a street and which usually affords a means of access to the rear of properties abutting streets or highways. Award – The decision of the Contracting Officer to accept the Proposal of the lowest responsible Bidder for the Work, subject to the execution and approval of a satisfactory contract thereof and bond to secure the performance thereof, and to such other conditions as may be specified or required by law. Base Course – The layer or layers of specified or selected material of designated thickness placed on a subbase or subgrade and used as a foundation to support an intermediate and/or surface course. Bid Bond – A guarantee by a Surety company that the Contractor who submitted a bid on a project will not withdraw his bid for a specified period. Bidder – Any individual, firm, partnership, corporation or joint venture submitting a proposal for the Work contemplated, acting directly or through a duly authorized representative. 6 DEFINITIONS AND TERMS 101 Bridge – A single or multiple span structure, including supports, erected over a depression or an obstacle such as water, highway or railway, and having a passageway for carrying traffic or other moving loads and having an opening measured along the center of the passageway of more than 20 feet. Bridge Length – The greater dimension of a structure as measured along the center of the roadway between backs of abutment backwalls or between ends of bridge deck. Bridge Roadway Width – The clear width of the superstructure measured at right angles to the center of the Roadway between the bottom of curbs or, if curbs are not used, between the inner faces of parapet or railing. Calendar Day – Each day shown on the calendar. Certified Minority Business Enterprise – A business enterprise that has been issued a certification of registration by the District of Columbia, Minority Business Opportunity Commission qualifying it to perform certain categories of work. Change Order – A written order issued by the Contracting Officer to the Contractor covering changes in the Contract. Chief Engineer – Chief Engineer of the Department acting directly, or through and within authority of an authorized representative. Completion Date – The date on which the Contract is specified to be completed. Construction Completion Time – The number of days, stated either in Calendar Days or as a Completion Date, allowed for completion of the Contract, including authorized time extensions. Contract – The binding agreement between the District of Columbia and another party or parties. Contract Documents – Addenda, Contract Form, General Provisions, Labor Provision, Performance and Payment Bonds, Specifications, Special Provisions, Contract Drawings, approved written Change Orders, and Agreements required to acceptably complete the Contract including authorized extensions thereof. Contract Drawings – All drawings, often referenced as Drawings or Plans (i.e., project drawings, Office Manual Drawings and other standard drawings) including reproductions of revisions thereof but exclusive of shop and Working Drawings and reference drawings, which show the location, character and dimensions of the prescribed Work, including layouts, profiles, cross sections and other details. Contracting Officer –The Department representative authorized to execute and administrate the Contract on behalf of the District and shall include his duly appointed successor and his authorized representative. Contract Price – The price stated in the Schedule of Prices. Contract Time – The number of Calendar Days allotted in the Contract Documents for the duration of the Project. Contractor – The individual, firm, partnership, corporation or joint venture under Contract with the District for execution of prescribed Work, acting directly or through a duly authorized representative. Culvert – A Structure other than a Bridge which provides an opening under a Roadway for drainage or other uses. Current – As used in reference to specifications or methods of test, shall refer to those in effect at the time of Advertisement for bids. Department – The Department of Transportation, District of Columbia. Director – The executive officer of the Department of Transportation. District – The District of Columbia, a municipal corporation. Earth – The word “earth”, wherever used as the name of the excavated material or material to be excavated, shall mean all kinds of material other than rock as defined herein. Elevation – The figures given on the Drawings or in the other Contract Documents after the word “elevation” or abbreviation of it shall mean the distance in feet above the standard datum used by the District. Embankment – A raised Structure of soil, soil aggregates, or rock below the Subgrade. Engineer – The Chief Engineer or a designated representative. FHWA – Federal Highway Administration of the United States Department of Transportation. 7 101 DEFINITIONS AND TERMS Final Acceptance –The occurrence of all the events and satisfaction of all the conditions with respect to the Work for completion of all aspects of the Contract as set forth in Section 108.09. Final Acceptance Certificate – The letter issued by the Department in accordance with Section 108.09 evidencing the Department’s determination that Final Acceptance has occurred. Final Acceptance Date – The date on which Final Acceptance is achieved, as indicated on the Final Acceptance Certificate. Highway, Street or Road – The entire Right-of-Way reserved for use in constructing or maintaining the Roadway and its appurtenances. Holidays – The following days are recognized as legal holidays: New Year’s Day Independence Day Inauguration Day Labor Day Martin Luther King Jr. Birthday Columbus Day Presidents Day Veterans Day Memorial Day Thanksgiving Day Emancipation Day Christmas Day Any day declared a holiday by the District shall be observed. When a holiday falls on a Sunday, the following Monday will be observed as a Holiday. When a holiday falls on a Saturday, the preceding Friday will be observed. Inspector – The Engineer’s authorized representative assigned to make any inspection of Work performed and materials furnished. Invitation for Bids – See Advertisement. Laboratory – The established testing laboratory or other testing laboratories which may be designated by the Engineer for the performance of tests. Liquidated Damages – The amount to be deducted from monies due the Contractor for failure to complete the Work in the specified time. Mayor – The elected head of the District of Columbia as set forth in Public Law 93-198, dated December 24, 1973, Title 4, Part B, Section 422(1). Notice to Proceed – A written notice to the Contractor from the Contracting Officer stating the date on which the Contractor shall begin prosecution of Work under Contract, or to begin a phase of the Work. Office Manual Drawings – Detail Drawings of the Department of Transportation of general application. Pavement Structure – The combination of base courses, intermediate course, and surface course placed on a subgrade to support the traffic load and distribute it to the roadbed. Pay Item (Bid Item, Item) – An item of work specifically described and for which a price, either unit or lump sum, is provided. Pay Item Schedule (Schedule of Prices) – A schedule showing the pay item number, the approximate quantity of each pay item, the price bid by the Contractor to be paid for each item of work performed under the Contract, the total cost of each item, and the total amount bid by the Contractor. Performance and Payment Bond – A guarantee by a Surety company that the Contractor will be responsible for the performance and fulfillment of the Contract and will pay all bills and accounts for materials and labor used in the Work. Plans – The Contract Drawings which show the location, character, and dimensions of the prescribed Work, including layouts, profiles, cross sections and other details. Plant – All physical resources, facilities, machinery, equipment, staging, forms, tools, work and storage space other than provided by the Contract, together with subsidiary essentials and necessary maintenance for proper construction and acceptable completion of the Project. Project – The entire Work to be completed under the Contract. Proposal – The offer of a Bidder on the prescribed form, to perform stated construction work at the prices quoted. 8 DEFINITIONS AND TERMS 101 Proposal Form – The prescribed form on which the offer of a Bidder is to be submitted. Proposal Guaranty – The security furnished with a bid to assure that the Bidder will enter into the Contract if his offer is accepted. Public Space – All publically owned property located between the property lines on a street and includes, but is not limited to, the roadway, tree spaces, sidewalks and alleys. Registered Professional Engineer – Registered Professional Engineer in the fields of civil, structural, mechanical or electrical engineering, who is registered with the District’s Board of Registration for Professional Engineers. Right-of-Way – Land, property or interest therein acquired for or devoted to the District’s highway purposes. Roadbed – Graded portions of highway upon which soils base, pavement or base, surface, shoulder, sidewalk, and median are constructed. Roadway – The portion of the Right-of-Way intended for vehicular use. Rock – Rock, wherever used as the name of an excavated material, shall mean only boulders and pieces of concrete or masonry exceeding 1 cubic yard in volume, and solid ledge rock which, in the Engineer’s opinion, requires for its removal, drilling and blasting, wedging, sledging, barring or breaking up with power-operated tools. No soft or disintegrated rock which can be removed with a hand pick or power operated excavator or shovel, or loose or previously blasted rock or broken stone in rock fillings or elsewhere, and no rock exterior to the maximum limits of measurement allowed, which may fall into the excavation, will be measured or allowed as rock. Set Aside – Designated projects procured in accordance with 49 CFR Part 26.39 for which bids from only qualified small business enterprises may be considered for Award. Sheltered Market – Designated projects procured in accordance with the provisions of D.C. Law 1-95 (Minority Contracting Act of 1976) and on which only bids from minority business enterprises prequalified by the District of Columbia Minority Business Opportunity Commission will be accepted. Shop Drawings – Drawings prepared by the fabricator or supplier showing the layout and details of components fabricated in a shop for inclusion in the permanent facility e.g., structural steel, reinforcing steel, railing, etc. Shoulder – The portion of the roadway contiguous with the traveled way for accommodation of stopped vehicles for emergency use, and for lateral support of base and surface courses. Sidewalk – The portion of the Right-of-Way intended for pedestrian use. Site – The area upon or in which the Contractor’s operations are carried on and such other areas adjacent thereto as may be designated by the Engineer. Special Provisions (Designated as S.P.) – Special directions and requirements peculiar to a project not otherwise thoroughly set forth in Standard Contract Provisions and Standard Specifications Specifications – All the directions, provisions and requirements contained in the Standard Specifications, Supplemental Specifications, and Special Provisions which are necessary for the proper performance of the Contract. Standard Contract Provisions – Standard Instructions to Bidders, General Provisions, Labor Provisions, Bid and Contract Forms as amended, for use with District of Columbia construction projects. Standard Specifications – This book of provisions, the 2013 Standard Specifications for Highway and Structures. Structures – Bridges, culverts, catch basins, drop inlets, retaining walls, cribbing, end walls, buildings, sign supports, and appurtenant features encountered in the Work and not otherwise classed herein. Subcontractor – Any individual, partnership, firm, corporation or any acceptable combination thereof, or joint venture, to which the Contractor, with the consent of the Department, sublets part of the Contract. Subgrade – The top surface of a roadbed upon which the pavement structure and appurtenances are constructed. Substantial Completion – the satisfaction of the criteria for completion of construction of the Project set forth in Section 108.09, and as defined by the Department, and as and when confirmed by the Department’s issuance of the Substantial Completion Certificate. Substantial Completion Certificate – The letter issued by the Department in accordance with Section 108.09 evidencing the Department’s determination that Substantial Completion has occurred. 9 101 DEFINITIONS AND TERMS Substantial Completion Date – The date on which Substantial Completion is achieved, as indicated on the Substantial Completion Certificate. Substructure – All of that part of a bridge below the bearings of simple or continuous spans, skewbacks of arches and tops of footings of rigid frames, including. backwalls. Superintendent – The Contractor’s authorized representative in responsible charge of the Work. Supplemental Specifications – Approved additions and revisions to the Standard Specifications. Surety – The corporation, partnership or individual, other than the Contractor, executing a bond furnished by the Contractor. Surface Course – The top layer of a pavement structure; Also referred to as wearing course or top course. Traffic Control Plan – A formal plan prepared by the Department or by the Contractor indicating how traffic is to be managed through a construction project. The Traffic Control Plan (TCP) shall comply with the current edition of MUTCD. Tree Space – The portion of the public Right-of-Way used or reserved for trees. Work – The furnishing of all labor, materials, equipment, and incidentals necessary or convenient to the successful completion of the Project and the carrying out of the duties and obligations imposed by the Contract. Working Drawings – Drawings furnished by the Contractor showing the layout and details of temporary construction, procedures and methods of construction, and data for construction equipment which are to be employed in the construction of the permanent facility (e.g., form drawings, erection drawings, load test pile procedures, pile hammer data, catalog cuts, performance data). In order to avoid cumbersome and confusing repetition of expressions in these Specifications, and unless context clearly indicates another meaning supplementing the intended written requirements, the words “as approved by the Engineer” or “to/by the Engineer” are applied to the following terms: Acceptable Directed Rejected Accepted Disapproved Required Appropriate Equivalent Reserved Approved Given Significant Authorized Indicated Specified Comparable Insufficient Sufficient Contemplated Needed Suitable Designated Ordered Suspended Determined Permitted Unacceptable When drawings or plans are not a part of the Contract, the words “per the drawings” shall mean “as directed by the Engineer”. 10 BIDDING REQUIREMENTS 102 102 BIDDING REQUIREMENTS GOVERNMENT OF THE DISTRICT OF COLUMBIA STANDARD CONTRACT PROVISIONS FOR USE WITH SPECIFICATIONS FOR DISTRICT OF COLUMBIA GOVERNMENT CONSTRUCTION PROJECTS 1973, AS AMENDED 102.01 INSTRUCTIONS TO BIDDERS (CONSTRUCTION) ARTICLE 1 QUALIFICATIONS OF BIDDERS Bidders shall have the capability to perform classes of work contemplated, have the necessary Plant and sufficient capital to execute the Work properly within specified time. Any Bidder who has not performed comparable work for the District within the last five (5) years shall submit, at the Contracting Officer’s discretion, a certified statement of his organization, Plant, manpower, financial resources, and construction experience that he considers will qualify him for proposed Contract. This information shall be certified by a Certified Public Accountant for contracts over $25,000. This requirement is not needed if the Bidder has submitted such a statement to the District within a year prior to bid opening date, but will be required if Bidder has previously submitted such a statement under one company name or organization or joint venture and is now bidding under another company name or organization or joint venture. A certified statement of prequalification approval by another jurisdiction may be considered as an alternative to foregoing procedure. A Bidder shall submit a supplemental statement if requested by the District. ARTICLE 2 BID DOCUMENTS The Specifications (including all documents referenced therein and all documents attached thereto), drawings, and addenda which form the basis of any bid shall be considered as part thereof and will form part of the bid. Copies of these documents will be furnished to or made available for the inspection of prospective Bidders by that office indicated in the Advertisement or invitation. ARTICLE 3 EXAMINATION OF BID DOCUMENTS AND SITE OF WORK Each Bidder shall carefully examine the Site of the proposed Work and the bid documents and fully acquaint himself with conditions relating to construction and labor so that he may fully understand the facilities, difficulties, and restrictions attending the execution of the Work under the bid documents, and he shall judge for and satisfy himself as to conditions to be encountered affecting the character, quality and quantity of the Work to be performed and materials to be furnished and to the requirements of the bid documents. Failure to do so will be at the Bidder’s own risk and shall not relieve him from any obligation under his bid or Contract. ARTICLE 4 PREPARATION OF BIDS The bid form furnished in the bid Proposal and Specifications shall be used in strict compliance with the requirements of the Invitation and Supplemental Instructions to Bidders in the Specifications. Special care shall be exercised in the preparation of bids. Bidders must make their own estimates of the facilities and difficulties to be anticipated upon execution of the Contract, including local conditions, uncertainty of weather and all other contingencies. All designations and prices shall be fully and clearly set forth in the bid submission. ALL PRICES SHALL BE INSERTED IN FIGURES TYPED OR PRINTED LEGIBLY ON THE BID FORM. All corrections on the bid documents must be initialed by the person signing the form. ARTICLE 5 ERROR IN BIDS Bidders or their authorized agents are expected to examine all bid documents and any addenda thereto, and all other instructions pertaining to the Work which will be open to their inspection. Failure to do so will be at the Bidder’s own risk, and will not constitute reason for relief on plea of error in the bid. IN CASE OF ERROR IN THE EXTENSION OF PRICES IN THE BID, UNIT PRICES WILL GOVERN. The Bidder must submit his plea of error in writing to the Contracting Officer and must be prepared to document and prove his error. ARTICLE 6 LABOR AND MATERIAL NOT FURNISHED BY DISTRICT The District will not furnish any labor, material, or supplies unless a provision to do so is included in the Contract Documents. 11 102 BIDDING REQUIREMENTS ARTICLE 7 ADDENDA AND INTERPRETATIONS No oral interpretations of the meaning of the drawings, Specifications, or other bid documents will be made to any Bidder. Verbal clarification will not be binding on the District. All requests must be in writing and addressed to the Contracting Officer responsible for administering the Contract. Requests for interpretations of bid documents must be received by the Contracting Officer not later than ten (10) days prior to bid opening date. All changes to the bid documents will be made by addenda mailed to all prospective Bidders, who have obtained copies of the bid documents, not later than seven (7) days before bid opening date. In case of discrepancy among addenda, a later dated Addendum has priority over earlier dated addenda. It shall be the Bidder’s responsibility to make inquiry as to any or all addenda issued, and failure of any prospective Bidder to receive any such addenda issued by the Contracting Officer shall not relieve the Bidder from any obligation under his bid as submitted. Bidder must acknowledge receipt of all addenda on the Bid Form; failure to do so may result in rejection of bid. All addenda issued shall become part of the bid and Contract Documents. ARTICLE 8 ALTERNATE BIDS Alternate bids will not be considered unless called for in the Bid Form. ARTICLE 9 BIDS FOR ALL OR PART Where bids are not qualified by specific limitations, the District reserves the right to Award all or any of the items according to its best interests. ARTICLE 10 PRICE SCHEDULE INTERPRETATION Quantities appearing in the Price Schedule are approximate only and are prepared for the comparison of bids. Payment will be made only for actual material requirements accepted and for Work performed and accepted. Schedule quantities may be increased, decreased, or omitted and there shall be no adjustment in Contract unit prices except as provided, and except for such materials actually purchased or Work actually performed prior to notification of the change in items affected. The price of any item, unless otherwise specified shall include full compensation for all materials, tests, samples, manufacturers’ guaranties, tools, equipment, labor, and incidental work needed to complete specified items. Prices without exception shall be net, not subject to discount, and shall include all royalties and costs arising from patents, proprietary items, trademarks, and copyrights ARTICLE 11 CORRECTIONS Erasures and other changes in bids must be explained or noted over the signature of the Bidder. ARTICLE 12 BOND REQUIREMENTS A. BID GUARANTY – On all bids of $100,000 or more, security is required to insure the execution of the Contract. No bid will be considered unless it is so guaranteed. Each Bidder must furnish with his bid either a Bid Bond (Form No. DC 2640-5), with good and sufficient sureties, a certified check payable to the order of the Treasurer of the District of Columbia (uncertified check will not be accepted), negotiable United States bonds (at par value),or an irrevocable letter of credit in an amount not less than five percent (5) of the amount of his bid as a guaranty that he will not withdraw said bid within the period specified therein after the opening of the same; or, if no period be specified, within ninety (90) days after said opening, and will, within the period specified therefore, or, if no period be specified, within ten (10) days, after the prescribed forms are forwarded to him for execution (or within any extension of time which may be granted by the officer to whom the bid was addressed) execute and deliver a written Contract on the standard District form in accordance with the bid as accepted and give bond with good and sufficient sureties, as specified below for the faithful performance and proper fulfillment of such Contract and payment of laborers and material men as required by law or, in the event of the withdrawal of said bid within the period above stated, of the failure to enter into such Contract and give such bond within the time above stated, that he will pay to the District the difference between the amount specified in said bid and the amount for which the District may procure the required work, if the latter amount be in excess of the former. Certified checks and United States bonds will be retained from the apparent first, second and third low Bidders. All other Bidders who have tendered monetary guarantees shall have deposits returned by Certified Mail. Certified checks and United States bonds will be returned to the second and third low Bidders after Award of Contract and to successful Bidders after the signing of prescribed forms of Contract and bond. Guaranty bonds will be returned only upon written application. B. PERFORMANCE BOND – For any construction Contract exceeding $100,000.00 in amount, a Performance Bond (Form No. DC 12 BIDDING REQUIREMENTS 102 2640-7) shall be required in a penal amount equal to 100 percent of the Contract price at time of Award. Additional performance bond protection shall be required in connection with any modification effecting an increase in price under any contract for which a bond is required pursuant to the above if: 1. The modification is for new or additional Work which is beyond the scope of the existing Contract; or, 2. The modification is pursuant to an existing provision of the Contract and is expected to increase the Contract price by $50,000 or 25 percent of the original total Contract price, whichever is less. The penal amount of the bond protection shall be increased so that the total performance bond protection is 100 percent of the Contract price as revised by both the modification requiring such additional protection and the aggregate of any previous modification. The increased penal amount may be secured either by increasing the bond protection provided by existing Surety or sureties or by obtaining an additional performance bond from a new Surety. C. PAYMENT BOND – In accordance with the provisions of Section 702(b) of the District of Columbia Procurement Practices Reform Act of 2010, payment bonds shall be required in an amount not less than 50 percent of the total amount payable by the terms of the Contract. Additional payment protection shall be required in connection with any modification effecting an increase in price under any Contract for which a bond is required pursuant to the above if: 1. The modification is for new or additional Work which is beyond the scope of the existing Contract; or 2. The modification is pursuant to an existing provision of the Contract and is expected to increase the Contract Price by $50,000 or 25 percent of the original total Contract Price, whichever is less. The penal amount of the additional bond protection shall generally be such that the total payment bond protection is 50 percent of the Contract Price as revised by both the modification requiring such additional protection, and the aggregate of any previous modification. The additional protection may be secured either by increasing the bond protection provided by the existing Surety or sureties or by obtaining an additional payment bond from a new Surety. D. BOND SOURCE – The bonds may be obtained from any Surety company authorized by the U.S. Treasury Department as acceptable sureties on Federal Bonds and authorized to transact business in the District of Columbia by the Administrator, Insurance Administration, Department of Consumer and Regulatory Affairs. ARTICLE 13 SIGNATURE TO BIDS Each bid must show the full business address of the Bidder and be signed by him with his usual signature. Bids by partnerships must be signed with the partnership name by one of the members of the partnership or by an authorized representative, followed by the signature and designation of the person signing. Bids by corporations must be signed with the name of the corporation, followed by the signature and designation of the President or Vice President and attested by the Secretary of the Corporation and the corporate seal affixed thereto. If bid is signed by other than the President or Vice President, evidence of authority to so sign must be furnished in the form of an extract of minutes of a meeting of the Board of Directors or extract of bylaws certified by the Corporate Secretary and corporate seal affixed thereto. The names of all persons signing shall be typed or printed below the signatures. A bid by a person who affixes to his signature the word “President”, “Vice President”, “Secretary”, “Agent”, or other designation, without disclosing his principal, may be held personally to the bid. Bids submitted by a joint venture must be signed by all authorized parties to the joint venture. ARTICLE 14 MARKING AND MAILING BIDS Bids (from Standard Contract Provisions), addenda acknowledgement, and bid guaranty must be securely sealed in suitable envelopes, addressed and marked on the outside with the name of the Bidder, invitation number, and date of opening ARTICLE 15 RECEIVING BIDS, MODIFICATIONS, OR WITHDRAWALS Bids received prior to the time set for opening will be securely kept unopened. The officer whose duty is to open them will decide when the specified time has arrived and no bid received thereafter will be considered unless: (1) they are sent by registered mail or by certified mail for which an official dated post office stamp (post-mark) on the original Receipt for Certified Mail has been obtained and it is 13 102 BIDDING REQUIREMENTS determined by the District that the late receipt was due solely to delay in the mails for which the Bidder was not responsible; or (2) if submitted by mail (or by telegram if authorized by the Contracting Officer), it is determined by the District that the late receipt was due solely to mishandling by the District after receipt at the District agency: Provided, that timely receipt at such agency is established upon examination of an appropriate date or time stamp or other documentary evidence or receipt within the control of such agency. Bidders using certified mail are cautioned to obtain a receipt for certified mail showing legible, dated postmark and to retain such receipt against the chance that it will be required as evidence that a late bid was timely mailed. The only evidence acceptable in this matter is as follows: (1) where the Receipt of Certified Mail identifies the post office station of mailing, evidence furnished by the Bidder which established that the business day of the station ended at an earlier time, in which case of the time of mailing shall be deemed to be last minute of the business day; or (2) an entry in ink on the Receipt for Certified Mail showing the time of mailing and the initials of postal employee receiving the item and making the entry, with appropriate written verification of such entry from the post office station of mailing, in which case the time of mailing shall be the time shown in the entry. If the postmark on the original Receipt for Certified Mail does not show a date, the bid shall not be considered. The time of mailing of late bids submitted by registered or certified mail shall be deemed to be the last minute of the date shown in the postmark on the registered mail receipt or registered mail wrapper or on the Receipt for Certified Mail unless the Bidder furnishes evidence from the post office station of mailing which establishes an earlier time. No responsibility will attach to the District or any of its officers or employees for the premature opening of a bid not properly addressed and identified. Unless specifically authorized, telegraphic bids will not be considered, but modification by telegram, of bids already submitted will be considered if received prior to the hour set for opening, but should not reveal the amount of the original or revised bid. ARTICLE 16 WITHDRAWAL OF BIDS Bids may be withdrawn on written or telegraphic request received from Bidders prior to the time fixed for opening, provided the name of the Bidder appears on the outside of the envelope containing the bid. Negligence on the part of the Bidder in preparing the bid confers no right for the withdrawal of the bid after it has been opened. ARTICLE 17 OPENING OF BIDS At the time fixed for the opening of bids, their contents will be made public by the Department of Transportation for the information of Bidders and other properly interested persons. ARTICLE 18 AWARD OR REJECTION The Contract will be awarded to the lowest responsible Bidder complying with conditions of the bid documents, provided his bid is reasonable and it is in the best interest of the District to accept it. The Bidder to whom Award is made will be notified by the Contracting Officer at the earliest possible date. The District, however, reserves the right to reject any and all bids and to waive any informality in bids received whenever such rejection or waiver is in the best interest of the District. If more than one bid be offered by any one party, by or in the name of his or their clerk, partner, or other person, all such bids may be rejected. This shall not prevent a Bidder from proceeding under Article 8 hereof, nor from quoting different prices on different qualities of materials or different conditions of delivery. A supplier or material man who has quoted prices on materials to a Bidder is not thereby disqualified from quoting to other Bidders or from submitting a bid directly for the materials or Work. Each Bidder shall bid on all items in the Pay Item Schedule and in accordance with the instructions below. Failure to bid on all items will give the District the option to reject the bid. The Contracting Officer reserves the right to waive any informalities, to reject any or all bids, or to readvertise for bids. Awards, if made, will be to the lowest responsible and qualified Bidders whose bids are responsive to the invitation and is most advantageous to the District of Columbia, price and other factors considered. In addition to requirements for qualification of Bidders as set forth in Article 1 hereof, and as determined by the District, Proposals will be considered irregular and may be rejected by the Contracting Officer for any of, but not limited to, the following reasons: A. Incompetency, inadequate Plant, or insufficient capital as revealed by Bidder’s statement on AGC or equivalent form. B. Evidence of collusion. 14 BIDDING REQUIREMENTS 102 C. Uncompleted Work which might hinder or prevent proper and prompt execution and completion of Work contemplated. D. Evidence that Bidder has not adequately considered all aspects of contemplated Work. E. Failure to settle bills, claims and judgments due for labor and material on Bidder’s contracts in force on bid opening date. F. Default under previous contracts. G. Unacceptable rating as listed on published government lists. H. Proposal submission on form other than that form furnished by District, or altered or partially detached form. I. Unauthorized additions, deletions, omissions, conditional bids, or irregularities which may make Proposal incomplete or ambiguous in meaning. J. Failure to acknowledge all addenda issued. K. Failure to submit bid in the properly labeled receptacle in the Bid Room (2nd floor) of the Department of Transportation, 2000 14th Street, N.W., Washington, D.C. 20009, and prior to the time set for opening as governed by the Official Clock designated as such in that Branch; or if bid is mailed, it is received at P.O. Box 43182-9182 by the designated time. ARTICLE 19 CANCELLATION OF AWARDS The right is reserved to the District, without any liability upon the District, to cancel the Award of any Contract at any time prior to approval of a formal written Contract signed by the Contractor and the Contracting Officer. 102.02 PROPOSAL FORMS The District will furnish each Bidder a Proposal Form which will state the estimated quantity for each and every item upon which a bid is required, a description of the Work to be done, the time in which the Work must be completed, and the date, place, and time Proposals will be opened. It will also state any Special Provision, Supplemental Specifications or requirements which vary from, or are not contained in, the Standard Specifications. 102.03 RESERVED 102.04 AFFIRMATIVE ACTION PROGRAM Submission by the Contractor and all Subcontractors of an Affirmative Action Plan in compliance with Mayor’s Order 85-85 is required. This Affirmative Action Plan must be received by the Contracting Officer, within five (5) working days subsequent to the bid opening. Failure to comply in a timely manner may render a bid non-responsive. Contract Award is conditioned on the approval of the Affirmative Action Program. The goals for minority and female participation are as follows: A. The goal for minority participation expressed in percentage terms for the Contractor’s workforce in each trade on all construction work in the covered area is 28 percent or such other percentage specified in the Specifications and Bid Forms by the Contracting Officer. B. The goal of 6.9%, or such other percentage specified in the Specifications and Bid Forms by the Contracting Officer, for female participation is applicable to the Contractor’s aggregate on-site construction workforce. This goal is applicable whether or not part of that workforce is performing work on a Federal or federally-assisted construction contract or subcontract. These goals are applicable to all of the Contractor’s work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, he or she shall apply to goals established for such geographical area where the Work is subject to the goals for both its federally involved and non-federally involved construction. Each Bidder should submit a certificate with the bids, signed by an official of the company that he or she is aware of the aforementioned orders and that he or she will comply with them in the performance of the Contract. 15 102 BIDDING REQUIREMENTS 102.05 NON COLLUSION Every bid submitted shall contain an affidavit signed by an official of the company submitting the bid that said company has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the proposed Contract. 102.06 ANTI-DISCRIMINATION CLAUSE The Contractor: (1) shall not discriminate in any manner based upon the actual or perceived: race, color, religion, national origin, sex, age, marital status, personal appearance, sexual orientation, gender identity or expression, family responsibilities, genetic information, disability, matriculation, or political affiliation of any employee or applicant for employment in violation of under §2-1401.11 of the District of Columbia Human Rights Act (D.C. Law 2-38; D.C. Code §2-1402.11) and (Title VII of the Civil Rights Act of 1964 ); (2) shall include a similar clause in every subcontract, except subcontracts for standard commercial supplies or raw materials, and (3) shall, along with all Subcontractors, post in a conspicuous place, available to employees and applicants for employment, a notice setting forth the provisions of the nondiscrimination clause set forth under 4 DCMR § 4-1103 ( set out in Section 251 of the District of Columbia Human Rights Act (D.C. Code Anno. Section 1-2522); (4) shall not exclude any person from participation in or deny the benefits of any of the Contractor’s programs or activities on the basis of race, color, national origin, sex, age, and disability, including the selection and retention of Subcontractors, under Title VI of the Civil Rights Act of 1964, 49 C.F.R. Part 21, 28 C.F.R. section 50.3 and other related statutes. 102.07 EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION When required in the Special Provisions the Bidder shall submit a certification with his or her bid that he or she has or has not participated in a contract or subcontract subject to in substance either the equal opportunity provisions of 103.02(E) or Section 202 of Executive Order 11246 of 3 CFR; that he or she has or has not filed all required compliance reports under any such contract or subcontract; and that representation indicating submission of required compliance reports signed by proposed Subcontractors will be obtained prior to subcontract Awards. 102.08 NONSEGREGATED FACILITIES CERTIFICATION When required in the Special Provisions the Bidder shall submit a certification with his or her bid that he or she does not and will not maintain or provide for his or her employees any segregated facility at any of his or her establishments; that he or she does not and will not permit his or her employees to perform their services at any location under his or her control where segregated facilities are maintained; and that he or she will obtain and retain identical certifications from proposed Subcontractors prior to Award of subcontracts exceeding $10,000.00. “Segregated facilities” shall mean any waiting room, work area, wash and rest room, eating area, time clock, locker room and other storage or dressing area, parking lot, drinking fountain, recreation or entertainment area, transportation and housing facility, provided for employees which is segregated by explicit directive or is segregated on the basis of race, creed, color, or national origin, because of habit, local custom or otherwise. Penalty for violations or making false statements is prescribed in 18 USC 1001. 102.09 RESERVED 102.10 EMPLOYMENT OF THE HANDICAPPED Pursuant to the Rehabilitation Act of 1973 (for Federal and federally-assisted projects), DC Human Rights Act of 1977 for District of Columbia-funded projects, and the Americans With Disabilities Act, the Contractor and all Subcontractors agree not to discriminate against any handicapped person who is qualified to perform the job. The Contractor also agrees to take Affirmative Action to hire, advance, and treat handicapped people without discrimination. 16 STANDARD CONTRACT PROVISIONS 103 103 STANDARD CONTRACT PROVISIONS 103.01 GENERAL PROVISIONS (CONSTRUCTION CONTRACT) ARTICLE 1 RESERVED ARTICLE 2 ORDER OF PRECEDENCE The Contractor shall keep on the Work Site a copy of Contract Drawings and Specifications and shall at all times give the Contracting Officer access thereto. Anything mentioned in the Specifications and not shown on the Contract Drawings, or shown on the Contract Drawings and not mentioned in the Specifications, shall be of like effect as if shown or mentioned in both. All Contract requirements are equally binding. Each Contract requirement, whether or not omitted elsewhere in the Contract, is binding as though occurring in any or all parts of the Contract. In case of discrepancy: A. The Contracting Officer shall be promptly notified in writing of any error, discrepancy, or omission, apparent or non-apparent. B. Applicable Federal and D.C. Code requirements have priority over: the Contract form, General Provisions, Change Orders, Addenda, Contract Drawings, Special Provisions and Specifications. C. The Contract form, General Provisions and Labor Provisions have priority over: Change Orders, Addenda, Contract Drawings, Special Provisions and Specifications. D. Change Orders have priority over: Addenda, Contract Drawings and Specifications. E. Addenda have priority over: Contract Drawings, Special Provisions and Specifications. A later dated Addendum has priority over earlier dated Addenda. F. Special Provisions have priority over: Contract Drawings and Specifications. G. Shown and indicated dimensions have priority over scaled dimensions. H. Original scale drawings and details have priority over any other different scale drawings and details. I. Large scale drawings and details have priority over small scale drawings and details. ARTICLE 3 CHANGES A. DESIGNATED CHANGE ORDERS – The Contracting Officer may, at any time, without notice to the sureties, by written order designated or indicated to be a Change Order, make any change in the Work within the general scope of the Contract, including but not limited to changes: 1. In the Contract Drawings and Specifications; 2. In the method or manner of performance of the Work; 3. In the District furnished facilities, equipment, materials, or services; or; 4. Directing acceleration in the performance of the Work. Nothing provided in this Article shall excuse the Contractor from proceeding with the prosecution of the Work so changed. B. OTHER CHANGE ORDERS – Any other written order or an oral order (which term as used in this Section (B) shall include direction, instruction, interpretation, or determination) from the Contracting Officer, which causes any such change, shall be treated as a Change Order under this Article, provided that the Contractor gives the Contracting Officer written notice stating the date, circumstances and sources of the order and that the Contractor regards the order as a Change Order. 17 103 STANDARD CONTRACT PROVISIONS C. GENERAL REQUIREMENTS – Except as herein provided, no order, statement or conduct of the Contracting Officer shall be treated as a change under this Article or entitle the Contractor to an equitable adjustment hereunder. If any change under this Article causes an increase or decrease in the Contractor’s cost of, or the time required for, the performance of any part of this Work under the Contract, whether or not changed by any order, an equitable adjustment shall be made and the Contract modified in writing accordingly. Provided, however, that except for claims based on defective Specifications, no claim for any change under (B) above shall be allowed for any cost incurred more than twenty (20) days before the Contractor gives written notice as therein required unless this twenty (20) days is extended by the Contracting Officer. In case of defective drawings and Specifications, the equitable adjustment shall include any increased cost reasonably incurred by the Contractor in attempting to comply with such defective drawings and Specifications. If the Contractor intends to assert a claim for an equitable adjustment under this Article, he must within thirty (30) days after receipt of a written Change Order under (A) above or the furnishing of a written notice under (B) above, submit to the Contracting Officer a written statement setting forth the general nature and monetary extent of such claim, unless this period is extended by the Contracting Officer. The statement of claim he

Type certificate, explained

What's in the CESSNA 172C TCDS

A Type Certificate Data Sheet (TCDS) is the FAA's record of what an aircraft type was approved as. It is the source of truth for weights, seating, fuel and the rules the design was certified against. Expand any line to see what it means.

TCDS 3A12Rev 82· Issued 2011
Read the full TCDS

43 CESSNA 172C parts for sale

See all →

Parts listed for sale by vetted eBay sellers — confirmed on eBay at checkout.