Skip to main content

AIRWORTHINESS DIRECTIVE

CESSNA 172S Skyhawk · Airworthiness Directives

Free account — keep the POHs & checklists you reference in one place.

Overview

This document is an Airworthiness Directive (AD) issued by the Civil Aviation Safety Authority (CASA) of Australia, specifically addressing safety concerns related to various models of the Cessna 172 series, including the Cessna 172S. The directive mandates the removal and replacement of specific components associated with the BRS-172 Parachute System to ensure safe operation. The compliance timeframe is set at 25 hours of service after the effective date of the directive, which is 13 March 2008. This AD is crucial for maintaining airworthiness and safety standards for the affected aircraft models.

  • Applies to Cessna 172 models including 172S.
  • Action required: Replace pick-up collar support and screws.
  • Compliance due within 25 hours after 13 March 2008.
  • Related to BRS-172 Parachute System.
  • Failure to comply may affect parachute deployment.

Document

Source

Originally published by services.casa.gov.au. Sprinkle hosts a reference copy with an added summary, specifications and searchable full text.

Report a problem or request removal

Document details

Type
Airworthiness Directives
Year
2008
Pages
1
File size
13 KB
Publisher
services.casa.gov.au
How rare is it?
43CESSNA 172S Skyhawk registered worldwide · 0 active

Common. Rarer than 2% of the aircraft models we track.

Documentation completeness
5/7

Most owners only have the POH. Here's the essential set for the CESSNA 172S Skyhawk.

More CESSNA 172S Skyhawkmanuals & documents

See all 49
Similar aircraft

If you fly the CESSNA 172S Skyhawk, you may also be researching these.

In this document

Applicability

The Airworthiness Directive applies to a wide range of Cessna 172 models, including the 172A through 172S, as well as the Cessna 170 and R172 series. This broad applicability indicates that the directive is relevant for many aircraft in the Cessna 172 family.

Requirement

The directive requires the removal and replacement of the pick-up collar support and two retaining screws associated with the BRS-172 Parachute System. This action must be performed in accordance with the specified service bulletin from Ballistic Recovery Systems Inc.

Compliance

Operators are required to complete the necessary actions within 25 hours of time in service after the effective date of the directive, which is 13 March 2008. This compliance timeline is critical for ensuring the safety of the aircraft.

Background

The directive was issued following notifications from the FAA regarding potential issues with the pick-up collar assembly of the parachute system. There is a risk that the collar may prematurely detach from the launch tube, which could lead to failure in parachute deployment.

Safety notes

  • Premature separation of the collar could result in parachute failure during deployment.

Full document text

COMMONWEALTH OF AUSTRALIA (Civil Aviation Safety Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY SCHEDULE OF AIRWORTHINESS DIRECTIVES Page 1 of 1 AIRWORTHINESS DIRECTIVE For the reasons set out in the background section, the CASA delegate whose signature appears below issues the following Airworthiness Directive (AD) under subregulation 39.001(1) of CASR 1998. The AD requires that the action set out in the requirement section (being action that the delegate considers necessary to correct the unsafe condition) be taken in relation to the aircraft or aeronautical product mentioned in the applicability section: (a) in the circumstances mentioned in the requirement section; and (b) in accordance with the instructions set out in the requirement section; and (c) at the time mentioned in the compliance section. Cessna 170, 172, F172, FR172 and 175 Series Aeroplanes AD/CESSNA 170/80 BRS-172 Parachute System 3/2008 Applicability: Model 172, 172A, 172B, 172C, 172D, 172E, 172F, 172G, 172H, 172I, 172K, 172L, 172M, 172N, 172P, 172Q, 172R, 172S, R172J, and R172K aircraft; equipped with a BRS-172 Parachute System installed via Supplemental Type Certificate No. SA01679CH. Requirement: Remove and replace the pick-up collar support and two retaining screws in accordance with Ballistic Recovery Systems Inc. (BRS) Service Bulletin 07-01, dated 8 June 2007. Note: FAA AD 2008-02-18 Amdt 39-15348 refers. Compliance: Within 25 hours time in service after 13 March 2008. This Airworthiness Directive becomes effective on 13 March 2008. Background: The FAA received notification from BRS that the pick-up collar assembly may prematurely move off the launch tube and adversely affect rocket trajectory during deployment. Premature separation of the collar could result in the parachute failing to successfully deploy. David Villiers Delegate of the Civil Aviation Safety Authority 1 February 2008