SCHEDULE OF AIRWORTHINESS DIRECTIVES
CESSNA 177 · Airworthiness Directives
Overview
This document is an Airworthiness Directive (AD) issued by the Civil Aviation Safety Authority of Australia concerning the Cessna 177 series aeroplanes. It specifically addresses the pneumatic stall warning system found in these aircraft. The directive outlines the requirements for checking the operation of the stall warning system, the installation of a placard for pre-flight checks, and the modifications needed to ensure compliance with safety standards. The document is intended for pilots and maintenance personnel responsible for ensuring the airworthiness of Cessna 177 aircraft.
- Check the pneumatic stall warning system before each flight.
- Install a placard stating 'PRE-FLIGHT TEST THE PNEUMATIC STALL WARNING SYSTEM' in full view of the pilot.
- Replace the stall warning reed assembly with specified part numbers to remove certain requirements.
- Flight test the aircraft to ensure the stall warning horn sounds at 5 to 10 knots above stalling speed.
Document
Source
Originally published by services.casa.gov.au. Sprinkle hosts a reference copy with an added summary, specifications and searchable full text.
Document details
- Type
- Airworthiness Directives
- Year
- 1983
- Pages
- 1
- File size
- 11 KB
- Publisher
- services.casa.gov.au
Common. One of the most common aircraft types we track.
Full essential library on file for the CESSNA 177.
CESSNA 177 for sale now
9 photos
1 photo
8 photosFree — save the 177 to your watchlist and track it in one place.
More CESSNA 177manuals & documents
See all 49 →- SFY 2026 Cardinal Care Performance Withhold Program MethodologyPerformance
- ForeFlight Weight and Balance GuideWeight And Balance
- Cessna 177 Prebuy Evaluation Checklist – Scope and DetailChecklist
- Telehealth Services SupplementTraining Manual
- Cessna 177 SpecificationsSpecifications
- Specifications for the CESSNA 177Specifications
- Airworthiness Directive Schedule Aeroplanes Cessna 177 SeriesService Bulletins
- Instructional ManualTraining Manual
- Rosen Sunvisor Systems PMM / IPC for Sunvisor Assembly (p/n R1180005-0)Systems Description
- jitcARDINAr I Volume No. 1 - Policies & ProceduresTraining Manual
- GL332 Processing Journal Entries (VDOT) Instructor Led TrainingTraining Manual
- Single Engine SERVICE BULLETIN SEB-28-04Service Bulletins
If you fly the CESSNA 177, you may also be researching these.
In this document
Applicability
The directive applies to all Cessna 177 models equipped with pneumatic stall warning systems that do not have the specified horn reed assembly part numbers or protective screens.
Requirement
Pilots must check the pneumatic stall warning system for correct operation before each flight. This involves applying suction to the stall warning opening and ensuring the horn sounds clearly. A placard must be installed in the cockpit to remind pilots to perform this check.
Compliance
Compliance with the requirements must be achieved before each flight for the operational check and within 25 hours of service for the placard installation.
Background
The directive has been amended to reflect the latest changes in Cessna part numbers and to correct a typographical error.
Safety notes
- Ensure the stall warning system is operational to prevent stall incidents.
Full document text
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY SCHEDULE OF AIRWORTHINESS DIRECTIVES Cessna 177 Series Aeroplanes AD/CESSNA 177/5 Amdt 2 Pneumatic Stall Warning System 7/83 Applicability: All models with pneumatic stall warning systems not incorporating horn reed assembly P/N 0413483-2, P/N 0713348-1 or subsequent and protective screens over the horn bell and stall warning system opening on the left wing. Requirement: 1. Check the pneumatic stall warning system for correct operation by applying a slight suction with the mouth at the stall warning opening in the left wing. A properly functioning horn will provide a sound that is clearly audible. It may be advisable to first cover the opening with a clean piece of cloth. Cessna 100 Series Service Manual 1963 to 1967 Section 16 refers. Note: This check may be performed and certified by the pilot. 2. Install the following placard in full view of the pilot: “PRE-FLIGHT TEST THE PNEUMATIC STALL WARNING SYSTEM”. 3. The requirements of paragraphs 1 and 2 may be removed by incorporation of the following modifications. Replace the stall warning reed assembly P/N 0413028-1 with reed assembly P/N 0413483-2, P/N 0713348-1 or subsequent and install an 18 x 14 or 18 x 16 mesh screen over the exposed horn bell inside the cabin and over the left wing opening. Flight test the aircraft to assure the stall warning horn sounds at 5 to 10 knots above the stalling speed. Compliance: For para. 1 - Before each flight. For para. 2 - Within 25 hours time in service after 5 September 1968. Background: This amendment reflects latest Cessna Part Number change. This Directive is reissued to correct a typographical error.
What's in the CESSNA 177 TCDS
A Type Certificate Data Sheet (TCDS) is the FAA's record of what an aircraft type was approved as. It is the source of truth for weights, seating, fuel and the rules the design was certified against. Expand any line to see what it means.
2,006 CESSNA 177 parts for sale
See all →





Parts listed for sale by vetted eBay sellers — confirmed on eBay at checkout.






