Skip to main content

A I R C R A F T TECHNICAL RECORD

Diamond DA62 · Checklist

Free account — keep the POHs & checklists you reference in one place.

Overview

This document serves as a technical record for the Diamond DA62 aircraft, specifically focusing on airframe log details, inspections, and compliance with maintenance requirements. It includes information about the aircraft's registration, manufacturer details, and inspection cycles. The document is intended for maintenance personnel and pilots to ensure the aircraft is in a fit and safe state for flight. Key sections outline the aircraft's total airframe time, inspection dates, and compliance with FAA regulations. It also provides details on various components and systems, including the ELT, transponder, and G1000 NXi installation.

  • Aircraft Registration: N456SA
  • Total Airframe Time: 5.8 hours
  • Next ELT Inspection Due: November 2024
  • Next ATC Transponder Inspection Due: October 2025
  • Annual Inspection Date: November 26, 2023

Document

Source

Originally published by inventory.steelaviation.com. Sprinkle hosts a reference copy with an added summary, specifications and searchable full text.

Report a problem or request removal

Document details

Type
Checklist
Year
2023
Pages
5
File size
2.3 MB
Publisher
inventory.steelaviation.com
How rare is it?
293Diamond DA62 registered worldwide · 263 active

Common. One of the most common aircraft types we track.

Documentation completeness
6/7

Most owners only have the POH. Here's the essential set for the Diamond DA62.

More Diamond DA62manuals & documents

See all 26
Similar aircraft

If you fly the Diamond DA62, you may also be researching these.

In this document

Airframe Log

The airframe log details the aircraft's registration (N456SA), serial number (62.C066), and total airframe time (5.8 hours). It includes inspection dates for various systems such as the static pressure system and ATC transponder, with the next due dates specified for each.

Inspection Details

The document outlines recent inspections performed on the aircraft, including an annual inspection and compliance checks for Airworthiness Directives (ADs) and Manufacturer Service Bulletins (MSBs). Specific tasks completed include ELT inspection, autopilot mechanical checks, and battery replacements.

Maintenance Requirements

Maintenance requirements are specified according to the Diamond DA62 Aircraft Maintenance Manual (AMM). The document highlights the importance of adhering to the specified intervals for inspections and component replacements to maintain airworthiness.

Component Details

Details on various components such as the ELT, transponder, and G1000 NXi installation are provided, including their inspection dates and next due dates for maintenance. This ensures that all systems are functioning correctly and compliant with regulations.

Certification of Airworthiness

The document concludes with a certification of airworthiness, confirming that the aircraft has been inspected and is in a safe condition for flight. It includes the signature of the inspector and the date of certification.

Safety notes

  • Ensure compliance with all maintenance requirements as per the Diamond DA62 AMM.
  • Regularly check and replace components as specified to maintain airworthiness.

Full document text

A I R C R A F T TECHNICAL RECORD Section 1. AIRFRAME LOG Aero TRANSPORT ® I www.aerotransport.com R7.00C A I R C R A F T 1. Nationality and Registration: N456SA 2. Manufacturer's designation: DA 62 3. Manufacturer's Serial Number: 62. C066 4. Type Approval or Specification Number: A00012NY 5 . D a t e o f M a n u f a c t u r e : 2 0 2 3 6. Aircraft Inspections cycle: A e r o T R A N S P O R T ® P u b l i c a t i o n s www.aerotransport.com Section 1: Airframe Log D i a m o n d AIRCRAFTE DIAMOND AIRCRAFT INDUSTRIES INC D.O.T. APPROVED MANUFACTURER #161-93 Registration: AC Serial Number: LH Engine Serial Number: RH Engine Serial Number: LH Prop Serial Number: RH Prop Serial Number: Airframe Total Time: N456SA 62.C066 EAP-C.06317 E4P-C-06299 231292 231291 5.8 HRS Compass Swing Performed: Total Time Airframe Brought forward from Production Test Flight Journey Log (DAI - Form Q-224): 5.8 HAg Date: NOVEMBER 14 2023 001 ? Next Due: NOVEMBER 2024 FOR STEER S 030 060 090 120 150 2 1 0 2 4 0 180 210 240 271 301 1300/330 1330 Static Pressure system and Primary Altimeter (G1000) have been inspected and tested in accordance with Standard 571, Appendix B and 14 CFR 91.411: OCTOBER 12 2023 ? Next Due: OCTOBER 2025 ? Stand By Altimeter: Factory Test Date: ? N e x t D u e : M A R C H 1 5 2 0 2 3 M A R C H 2 0 2 5 ? ATC Transponder & Altitude Reporting System(s) have been tested in accordance with CAR Standard 57 Appendix F and 14 CFR 91.217: & 91.413: Test Date: OCTOBER 13 2023 Next Due: OCTOBER 2025 Programmed Registration: N 4 5 6 S A Hex Code N/A (USA Registration) The ELT was tested and inspected in accordance with CAR Standard 571, Appendix G and 14 CR 91.2076); Manufacturers Cert. date: 02/23 (WW/YY) Installation Inspected: NOVEMBER 16 2023 Battery due: DECEMBER 2029 Next ELT inspection due: NOVEMBER 2024 ELT Programmed: REG H e x I D : Country: 15 Hex ID: N456SA N/A 366 (USA) ADC6498A055D381 Garmin G1000 NXi Installation: System: 3787.02 Checklist File: N/A Basemap Land 5.20 SafeTaxi Data: Expires 25-JAN-2024 Terrain Data: 3.00 Obstacle Data: Expires 25-JAN-2024 Navigation Data: Expires 28-DEC-2023 Apt Directory: Expires 25-JAN-2024 FliteCharts Data: Expires 28-DEC-2023 IFR/VFR charts: Date: 30-NOV-2023 D A Q 8 I n s p e c t o r (Continued next page) DEC 1 8 2023 date 1 b D i a m o n d AIRCRAFT DIAMOND AIRCRAFT INDUSTRIES INC D.O.T. APPROVED MANUFACTURER #161-93 Registration: AC Serial Number: LH Engine Serial Number: RH Engine Serial Number: LH Prop Serial Number: RH Prop Serial Number: Airframe Total Time: N 4 5 6 S A 6 2 . C 0 6 6 E 4 P - C - 0 6 3 1 7 E 4 P - C - 0 6 2 9 9 2 3 1 2 9 2 2 3 1 2 9 1 5 . 8 H R S Following limitations as per DA 62 AMM Chapter 4,5 (subject to change with revision): H o u r s - N / A - Y e a r s 1 yr. +/- 30 days N e x t D u e : O C T O B E R 2 0 2 4 1000 +/- 50 4 yrs. +/- 60 days 1000 or OCTOBER 2027 -N/A- 2 yrs. +/- 30 days N/A; MAM62-002 Incorporated C o m p o n e n t ECU backup batteries LH/RH Bonding system and static discharging system. Emergency battery package (if MAM 62-002 is NOT installed) ? T h e f o l l o w i n g S T C ' s a r e i n c o r p o r a t e d : ? FAA STC No. SA00018IB (Beringer wheel and brake system) THIS AIRCRAFT WAS INSPECTED FOR CONFORMITY TO APPLICABLE COMPANY RELEASED DOCUMENTS (DRAWINGS, SPECIFICATIONS, CONCESSIONS). I HEREBY CERTIFY THAT THIS AIRCRAFT CONFORMS TO FAA TYPE CERTIFICATE A00012NY Rev. No. 2, AND IS IN A FIT AND SAFE STATE FOR FLIGHT Bi-weekly AWD check carried out to current revision 2023-26 all applicable AD's complied with The work described above was carried out in accordance with the applicable Standard of Airworthiness For the latest and most applicable maintenance requirements, please refer to the Diamond Aircraft Maintenance D Q 8 DEC 1 8 2023 date mspector (Intentionally left blank below this point) U.S. Standard Airworthiness Certificate, issued: (Date) DEC 2 0 2023 -, has been installed in the Aircraft on behalf of FAA Farmingdale/Saddle Brook MIDO Section AIR-8A5 on: (Date) DEC 2 0 2023 (Print)h. Salt on (Signature. SIDOLSNAL S e c t i o n 1 : A i r f r a m e L o g D A T E / / C A R R I E D F O R W A R D wo: WO_632 AIR TIME DAILY TOTAL H R S M I N T O T A L HOURS MIN LANDINGS / CYCLES DAILY TOTAL TOTAL DETAILS OF TASK (INSPECTION, REPAIRS & REPLACEM Airframe Annual ? page . S T E E L A V I A T I O N Steel Aviation ? 53 North Street Ext ? Phillipsburg, Ohio 45354 ? 937 332 7587 DIAMOND AIRCRAFT IND INC, DA 62, S/N: 62.C066 N456SA TACH: 135.9 TTSN: 135.9 1. CW 200 / ANNUAL INSPECTION I/A/W DIAMOND AMM 5-28-50 ITEMS. November 26, 202 2. C/W ELT Inspection IAW FAR 91.207(D). NDN, Next due: 12/2029. 3. Checked AD's through Bi-Weekly date: 2024-23. 4. Checked MSB's for compliance. 5. C/V Autopilot mechanical check IAW Diamond DA62 AMM ch. 22-10-00 part 12. 7. G/W MSB62-003/9 G1000 Software by verifying installed software. . R&R ECU Backup Batteries with new. Installed (4) P/N NP7-12 DIAMOND - 12V BATTERY, Batt 2, Diamond. 8. C/W MSB62-051/1 by replacing retaining rings in landing gear IAW WI-MSB 62-051 Rev. 1. Installed (6) P/N DINA 10X1.0-MZP - RETAINING RING, Installed (4) P/N DIN471-20x1.2-MZP - Retaining Ring, Installed (2) P/N DIN 18X1.2-MZP - Retaining Ring. I certify that this AIRFRAME has been inspected in accordance with an (annual) inspection and was determined to be i airworthy condition. Details of work performed are on file with Steel Aviation under work order: WO Jeff Pleiman A/P I/A 3304319 8 / l P A G E TOTALS CARRY FORV

Type certificate, explained

What's in the Diamond DA62 TCDS

A Type Certificate Data Sheet (TCDS) is the FAA's record of what an aircraft type was approved as. It is the source of truth for weights, seating, fuel and the rules the design was certified against. Expand any line to see what it means.

TCDS A00012NYRev 0· Issued 2019
Read the full TCDS

5 Diamond DA62 parts for sale

See all →

Parts listed for sale by vetted eBay sellers — confirmed on eBay at checkout.