SERVICE BULLETIN - FUSELAGE - FORWARD FUEL TANK PROBE CLEARANCE VERIFICATION
GULFSTREAM G280 · Service Bulletins
Overview
This service bulletin provides instructions for verifying the clearance of fuel probes in the forward fuel tank of Gulfstream G280 aircraft. It outlines the necessary steps to ensure that the distance between the probes and the tank structure meets safety requirements, along with compliance deadlines and material information.
- Mandatory compliance by November 30, 2022.
- Applies to aircraft serial numbers 2001 through 2184.
- Minimum clearance requirement is 8.0 mm (0.31 inch) for fuel probes.
- Instructions include measuring probe distances and making necessary adjustments.
- Reviewed and approved by the Civil Aviation Administration of Israel.
- Estimated man-hours for compliance: 20.
- Parts required can be obtained through Gulfstream Spare Parts Sales.
- Labor and materials may be covered under warranty if conditions are met.
Document
Source
Originally published by regulations.gov. Sprinkle hosts a reference copy with an added summary, specifications and searchable full text.
Document details
- Type ·
- Service Bulletins
- Year ·
- 2019
- File size ·
- 533 KB
- Publisher ·
- regulations.gov
- Language ·
- en
What is the SERVICE BULLETIN - FUSELAGE - FORWARD FUEL TANK PROBE CLEARANCE VERIFICATION?
The SERVICE BULLETIN - FUSELAGE - FORWARD FUEL TANK PROBE CLEARANCE VERIFICATION is a service bulletins for the GULFSTREAM G280, dated 2019.
Where does the SERVICE BULLETIN - FUSELAGE - FORWARD FUEL TANK PROBE CLEARANCE VERIFICATION come from?
This copy of the SERVICE BULLETIN - FUSELAGE - FORWARD FUEL TANK PROBE CLEARANCE VERIFICATION was originally published by regulations.gov and is hosted on Sprinkle as a free, searchable reference copy.
What year was the SERVICE BULLETIN - FUSELAGE - FORWARD FUEL TANK PROBE CLEARANCE VERIFICATION published?
The SERVICE BULLETIN - FUSELAGE - FORWARD FUEL TANK PROBE CLEARANCE VERIFICATION — the GULFSTREAM G280 service bulletins on file — is dated 2019.
Most owners only have the POH. Here's the essential set for the GULFSTREAM G280.
- Pilot's Operating Handbook / AFM
- Checklist
- Maintenance Manual
- Parts Catalog (IPC)
- Systems & Wiring
- Service Bulletins on file
- Type Certificate (TCDS)
More GULFSTREAM G280manuals & documents
In this document
Effectivity
Applies to aircraft serial numbers 2001 through 2184.
Reason
Distance between the fuel probes and tank structure does not meet minimum requirements.
Compliance
Mandatory compliance with this service bulletin is required no later than November 30, 2022.
Material Information
Parts required for the service bulletin are available through Gulfstream Spare Parts Sales.
Accomplishment Instructions
Detailed steps for measuring probe distances and making adjustments to ensure compliance.
Safety Notes
Cautions regarding protection of components during maintenance and ensuring electrical power is disconnected.
Safety notes
- Protect wire bundles, connectors, and surrounding structure during maintenance.
- Ensure electrical power is disconnected to prevent injury and damage.
- Failure to comply with safety precautions may result in damage to components.
Full document text
S E R V I C E B U L L E T I N S U B J E C T NUMBER 280-53-287 FUSELAGE (ATA 53) – FUSELAGE – FORWARD FUEL TANK PROBE CLEARANCE VERIFICATION RECORD ONLY SEPTEMBER 26, 2019 Gulfstream............................................. SERVICE BULLETIN Service Bulletin No. 280-53-287 Page 1 of 15 FUSELAGE - FORWARD FUEL TANK PROBE CLEARANCE VERIFICATION PLANNING INFORMATION 202 1. Effectivity Aircraft serial numbers 2001 through 2184 2. Concurrent Requirement None 3. Reason During check of the forward fuel tank it has been found that the distance between the probe to the forward fuel tank structure doesn’t meet the minimum 8.0 mm (0.31 inch) requirements (probe No. 1 to the lower skin and probe No. 3 to the upper skin and angle P/N 30P371126800-501). 4. Description This service bulletin provides instruction to access to the forward probe No. 1 and aft probe No. 3 fuel probes in the forward fuel tank in order to measure each probe’s distance to the adjacent skin, and if the minimum 8.0 mm (0.31 inch) distance requirement is not met, implementation of this service bulletin’s rework instructions are required. 5. Compliance Compliance with this service bulletin is mandatory no later than November 30, 2022. 6. Approval This service bulletin has been reviewed by the Civil Aviation Administration of Israel (CAAI). The design content herein complies with the applicable Civil Aviation Regulations and is CAAI-approved. 7. Manpower The following information is for planning purposes only: Estimated man-hours: 20 8. Weight and Balance None September 26, 2019 Gulfstream............................................. SERVICE BULLETIN Service Bulletin No. 280-53-287 Page 2 of 15 9. Electrical Load Data No Change 10. Software Accomplishment Summary None 11. References G280 Aircraft Maintenance Manual (AMM), chapters 12, 20 and 28. Gulfstream Aerospace LP G280 TC design change MOD G25-10077 Doc. 30P045/060794, table 3-1 and table 8-2 Doc. 30P650/071366 para 5.2.6 NOTE: This Service Bulletin incorporates design data approved under G280 TC design change MOD G25-10077 for installation on the standard type certificated aircraft. Approval for any deviation from the instructions contained in this service bulletin should be obtained, if required, from the local regulatory authority in accordance with the local relevant regulations. 12. Other Publications Affected G280 AMM G280 IPC NOTE: Data concerning this service bulletin will be published in a future revision of the affected manual(s). This service bulletin will provide technical data until the revisions are published. 13. Interchangeability or Intermixability of Parts None September 26, 2019 Gulfstream............................................. SERVICE BULLETIN Service Bulletin No. 280-53-287 Page 3 of 15 MATERIAL INFORMATION 1. Material - Availability The parts required to accomplish this service bulletin are available by contacting Spare Parts Sales at 800-810-GULF (4853) or 912-965-4178. 2. Warranty Information - Structure Labor and materials will be at no charge for this service bulletin if the aircraft is still within the related warranty period as of the original issue date of this service bulletin and work is accomplished within the recommended compliance time, as stated in this document, at a Gulfstream Authorized Warranty Facility or Factory Authorized Service Center with related aircraft model certification. * *Coverage is granted per the terms and conditions of the Gulfstream Aircraft Sales Agreement to the original purchaser or subsequent owner with appropriate Assignment of Warranties on file with Gulfstream. NOTE: Additional labor hours incurred due to aircraft configuration or mechanical difficulties must be charged as a separate discrepancy and submitted for warranty consideration. 3. Material Necessary for Each Aircraft A. Material to be Procured: New P/N Keyword Old P/N Qty 30P371100008-501A01-505 Sensor bracket assembly - 1 30P371100008-501A01-507 Sensor bracket assembly - 1 30P371100008-501A01-509 Sensor bracket assembly - 1 NAS1802-3-10 Screw, hex head, cruciform recess, non-lock - 3 NAS1149C0332R Washer, flat, plain, #10 size, 0.032 inch - A/R NAS6703U3 Bolt, tension, hex head - 3 NAS1149C0363R Washer, flat, plain, #10 size, 0.063 inch - A/R September 26, 2019 Gulfstream............................................. SERVICE BULLETIN Service Bulletin No. 280-53-287 Page 4 of 15 B. Materials Supplied by the Operator: PR1750 sealant or equivalent 4. Reidentified Parts None 5. Special Tooling Fuel Quantity Test Set, GSE 2800142 or equivalent Fuel Quantity Measurement System (FQMS), GSE 2820595 or equivalent NAS1802-3-16 Screw, hex head, cruciform recess, non-lock - 1 NAS1149C0316R Washer, flat, plain, #10 size, 0.016 inch - A/R New P/N Keyword Old P/N Qty September 26, 2019 Gulfstream............................................. SERVICE BULLETIN Service Bulletin No. 280-53-287 Page 5 of 15 ACCOMPLISHMENT INSTRUCTIONS CAUTION: PROTECT WIRE BUNDLES, CONNECTORS AND SURROUNDING STRUCTURE DURING ANY MAINTENANCE PROCEDURES FROM SHAVINGS, DEBRIS AND CONTAMINATION. MAINTAIN A PROPERLY CLEANED WORK AREA THROUGHOUT THE PROCEDURE TO ENSURE THE INTEGRITY OF THE AFFECTED COMPONENT/SYSTEM. VISUALLY INSPECT WORK AREA USING ADDITIONAL LIGHT AS NECESSARY TO VERIFY ABSENCE OF ANY DEBRIS PRIOR TO COMPLETION OF PROCEDURE. FAILURE TO COMPLY MAY RESULT IN DAMAGE TO COMPONENTS AND/OR SYSTEMS. 1. Prepare aircraft for safe maintenance. Refer to Aircraft Maintenance Manual (AMM), Chapter 20. CAUTION: MAKE SURE ELECTRICAL POWER IS DISCONNECTED FROM AIRCRAFT. FAILURE TO COMPLY MAY RESULT IN INJURY TO PERSONNEL AND/OR DAMAGE TO AIRCRAFT. 2. Disconnect external electrical power from aircraft. Refer to AMM, Chapter 20. 3. Defuel forward tank if required and drain forward fuel tank. Refer to AMM, Chapter 12. 4. Open forward fuel tank access panels 123BR, 123ER, 123FR and 152DR to access
Show full textShow less
fuel probes No. 1 and No. 3. Refer to Figure 1. 5. Measure the gaps between the probes No. 1 and No. 3 and fuel structure (upper skin, lower skin and stringers). A. If all gaps measured are equal to or greater than 8.0 mm (0.31 inch), proceed to step 9. B. If any gaps measured are less than 8.0 mm (0.31 inch), proceed to the next step for that gap. 6. Remove forward fuel tank probes No. 1 and No. 3 as required. Refer to AMM, Chapter 28 and Figure 2. 7. Install forward fuel tank probe No. 3 as follows: NOTE: For screw, nut and bolt Installation refer to AMM, Chapter 20. A. Install sensor bracket assembly, P/N 30P37110008-501A01-509 (1) using flat washer, P/N NAS1149C0332R (2) and bolt, P/N NAS6703U3 (3). Refer to Figure 3. September 26, 2019 Gulfstream............................................. SERVICE BULLETIN Service Bulletin No. 280-53-287 Page 6 of 15 B. Install upper part of probe No. 3, P/N 30P884200200-001 on sensor bracket assembly as follows: (1) Install screw, P/N NAS1802-3-16 (4) with flat washer, P/N NAS1149C0332R (5) and adjust the gap between the probe and the fuel tank upper skin to be between 8.0 - 9.0 mm (0.31 - 0.35 inch) using washers, P/N NAS1149C0332R (6), P/N NAS1149C0363R (7) and P/N NAS1149C0316R (8) as required. (2) Reinstall lower part of probe No. 3, P/N 30P884200200-001 to its original position using screw, P/N NAS1802-3-10 (9), and flat washer, P/N NAS1149C0332R (10). (3) Adjust the forward probe to attain 8.0 - 9.0 mm (0.31 - 0.35 inch) distance from inner surface of the fuel tank upper skin and stiffener, P/N 30P371126800-501. (4) Ensure gap between probe and lower skin is equal to or greater than 8.0 mm (0.31 inch). C. Record the measured gaps from steps 7.B.(1) and 7.B.(3). 8. Install forward fuel tank probe No. 1 as follows: A. Install sensor bracket assembly, P/N 30P371100008-501A01-505 (11) and P/N 30P371100008-501A01-507 (7) as follows (Refer to Figure 4): (1) Install bolts, P/N NAS6703U3 (13), with flat washers P/N NAS1149C0332R (14) and screw, P/N NAS1802-3-10 (15) with flat washer, P/N NAS1149C0332R (16). (2) Install sensor bracket assembly, P/N 30P371100008-501A01-507 (7). B. Reinstall probe No. 1, P/N 30P884200000-001 in place using bolt, P/N NAS6703U3 (17) with washer, P/N NAS1149C0332R (18), and screw P/N NAS1802-3-10 (19) with washer, P/N NAS1149C0332R (20). C. Ensure gap between the aft probe and the fuel tank upper and lower skins is equal to or greater than 8.0 mm (0.31 inch). D. Record the measured gaps from step 8.C. 9. Install all fuel tank access panels removed in Step 4. for forward fuel tank probes removal. September 26, 2019 Gulfstream............................................. SERVICE BULLETIN Service Bulletin No. 280-53-287 Page 7 of 15 10. Perform Fuel Quantity Measurement System – Capacitance / Resistance Check Adjustment / Test for the Forward Fuel Tank Probes as follows: CAUTION: DAMAGE TO SENSITIVE COMPONENTS MAY OCCUR IF ELECTROSTATIC DISCHARGE SAFETY PRECAUTIONS ARE NOT OBSERVED. Tank Unit (Fuel Probes) Capacitor Checks A. Select the POWER ON / OFF switch to the ON position. B. Verify there is no indication of a low battery in the display window. C. Wait 3 minutes before staring the test. D. Select the FUNCTION SELECT knob to the MEASURE EXT Position. E. Select the MEGGAR SELECT knob to the TU position. F. Connect a ground cable from the CHASSIS connector of the fuel quantity test set to aircraft ground. G. Connect test harness connector to forward tank connector 84YP. H. Connect the interface test harness connector J9 to the fuel quantity test set to TANKS UNITS LO-Z connector. I. Connect the interface test harness connector J7 to the fuel quantity test set to TANKS UNITS HI-Z connector. J. Verify all the switches on the interface box are selected to the GROUND position. NOTE: In order to check each probe value, only select the applicable tank unit (fuel probe) to TEST position. After reading capacitance value, return the switch to the GROUND position. K. Select applicable interface box switch (SW-1, SW-2 or SW-3) to the TEST position to check each tank unit (fuel probe) capacitance value. After reading each capacitance value, return the switch to the GROUND position. September 26, 2019 Gulfstream SERVICE BULLETIN Service Bulletin No. 280-53-287 Page 8 of 15 L. Verify the measured tank units (fuel probes) capacitance values are with the specified ranges per the following table: Forward Tank Wiring Checkout NOTE: Reading of 0 ohm indicates a short circuit. An indication of “-Or.-” while reading the SHIELD positions is an acceptable reading as this reading is infinitely higher than what can be read on the display for any SHIELD position and meets the requirement. M. On the fuel quantity test set FREQUENCY SELECT knob, select MΩ. N. On the interface box, select SW-1, SW-2 and SW-3 to the MEGGAR position. O. Select SW-1 to the TEST position. P. Verify measured values are as specified in Table 2. Q. Select SW-1 back to the MEGGAR position. R. Select SW-2 to the TEST position. S. Verify measured values are as specified in Table 2. T. Select SW-2 back to the MEGGAR position. U. Select SW-3 to the TEST position. V. Verify measured values are as specified in Table 2. W. Select SW-3 back to the MEGGAR position. Table 1: FORWARD TANK UNITS (FUEL PROBES) CAPACITANCE VALUES Tank Unit (Probe) Switch Minimum (pF) Maximum (pF) 1Q 2 149.30 165.10 2Q 1 113.00 125.10 3Q 3 76.10 84.20 September 26, 2019 Gulfstream............................................. SERVICE BULLETIN Service Bulletin No. 280-53-287 Page 9 of 15 X. For each of the fuel tank harnesses, the following MEGGAR SELECT switch positions are to be checked to verify that forward fuel probes insulation resistance are within the required values: 11. After rework completion perform leakage test as follows: A. Refuel the forward tank per AMM, Chapter 12 and verify that the maximum fuel quantity reading of the forward tank is within the required range (refer to the relevant row in table below according to the fuel type and temperature) 12. Check for fuel leaks around work area and access panel(s) per the following requirements: (a) If fuel leak is detected, repair source of fuel leak. Table 2: TEST POSITION MINIMUM VALUE (MΩ) LO-Z/HI-Z 0.43 - 2.25 LO-Z/SHIELD 100 HI-Z/SHIELD 100 SHIELD/GND 100 LO-Z/GND 100 HI-Z/GND 100 Table 3: Fuel Quantity for FWD Fuel Tank Fuel Tank Fuel Type Fuel Temperature [°C] Minimum Fuel Quantity (LBs) Maximum Fuel Quantity (LBs) Fuel Quantity results (LBs) FWD TANK Brayco 0 – 9 1450 1600 JET A 0 – 9 1390 1550 Brayco 10 – 30 1350 1560 JET A 10 – 30 1370 1510 Brayco 31 – 40 1310 1520 JET A 31 – 40 1350 1470 September 26, 2019 Gulfstream SERVICE BULLETIN Service Bulletin No. 280-53-287 Page 10 of 15 (b) Use lint free cloth to clean all spilled fuel on aircraft and / or floor. (c) Use compressed air to dry hard to reach areas. 13. Ensure work area is clean and clear of foreign objects (FOD). 14. Record compliance with this service bulletin in the aircraft’s permanent maintenance records and return aircraft to flight status. 15. Report compliance with this service bulleting to Gulfstream Computerized Maintenance Program (CMP) by uploading the attached service reply card, along with the CMP task card(s) sign-off using MyGulfstream, MyCMP Document Upload or e-mail to cmp.docproc@campsystems.com. If technical assistance is required, contact your area Gulfstream Field Service Representative or call Gulfstream Customer Support at 800-810-GULF (4853). September 26, 2019 Gulfstream............................................. SERVICE BULLETIN Service Bulletin No. 280-53-287 Page 11 of 15 Access Panel Location Figure 1 September 26, 2019 Gulfstream SERVICE BULLETIN Service Bulletin No. 280-53-287 Page 12 of 15 FWD Fuel Tank Probe No. 1 and No. 3 Figure 2 FORWARD TANK PROBE NO. 3 FORWARD TANK PROBE NO. 1 September 26, 2019 Gulfstream............................................. SERVICE BULLETIN Service Bulletin No. 280-53-287 Page 13 of 15 Probe No. 3 - Installation Rework Figure 3 (Sheet 1) FORWARD TANK PROBE NO. 3 9 10 September 26, 2019 Gulfstream SERVICE BULLETIN Service Bulletin No. 280-53-287 Page 14 of 15 Probe No. 3 - Installation Rework Figure 3 (Sheet 2) 2 3 6 7 8 4 5 FORWARD TANK PROBE NO. 3 September 26, 2019 Gulfstream............................................. SERVICE BULLETIN Service Bulletin No. 280-53-287 Page 15 of 15 Probe No. 1 - Installation Rework Figure 4 PROBE NO. 1 FORWARD TANK 11 15 16 13 14 12 17 18 19 20 September 26, 2019 RECORD ONLY SERVICE BULLETIN GULFSTREAM G280 SERVICE BULLETIN NO. 280-53-287 SERVICE REPLY CARD PROPRIETARY NOTICE: These materials include proprietary information and data of Gulfstream Aerospace Corporation. Unauthorized distribution is strictly prohibited. ©2018 Gulfstream Aerospace Corporation. All rights reserved. EAR EXPORT CONTROLLED WARNING: This document contains technical data that is subject to U.S. Export Controls. Release to foreign persons, export transfer or re-export of this technical data requires approval from the Department of Commerce. Please upload this page, along with the CMP task card(s) sign-off using MyGulfstream, MyCMP Document Upload, or e-mail to cmp.docproc@campsystems.com This is a Record Only Service Bulletin with its own unique CMP code. Operators that have accomplished this SB and want to show compliance in CMP must contact their CMP analyst to have this custom code entered into CMP. The following Service Bulletin (SB) has been addressed: SB CMP NUMBER A/C AIRCRAFT TYPE COMPLIANCE DATE 982870 Gulfstream G280 Aircraft Hours _______________ Aircraft Landings__________________ This Service Bulletin is not applicable because: _______ Serial Number not affected _______ Equipment not installed _______Previously complied with (annotate method of compliance below) _______Other (explain reason below) SIGNATURE TITLE / CERTIFICATE NUMBER COMPANY COMMENTS / SUGGESTIONS / ACTIONS TAKEN: