CHECK-LIST NORMALE PIPER PA 18-95 F-GJSG
PIPER PA-18 · Checklist
Overview
This document is a checklist for the Piper PA-18 aircraft, detailing pre-flight, in-flight, and post-flight procedures. It includes steps for engine start, takeoff, cruising, descent, approach, and landing, ensuring safety and operational readiness.
- Ensure all controls are free and clear before takeoff.
- Check engine instruments are in the green before takeoff.
- Verify fuel levels and switch tanks regularly.
- Adjust mixture settings as required during flight phases.
- Perform pre-flight checks including documents and equipment.
- Confirm altimeter settings and radio communications.
- Conduct post-landing procedures including engine shutdown.
- Record block time after landing.
Summary written by AI from the source document. Check the original before relying on it. See which parts of Sprinkle are written by AI.
Reference only, not for flight. Use the current approved manual for your aircraft. See terms, section 5.
Document
Source
Copy found at asso.fr. Sprinkle hosts a reference copy with an added summary, specifications and searchable full text.
Document details
- Type ·
- Checklist
- Year ·
- 2021
- File size ·
- 109 KB
- Copy found at ·
- asso.fr
- Language ·
- fr
What is the CHECK-LIST NORMALE PIPER PA 18-95 F-GJSG?
The CHECK-LIST NORMALE PIPER PA 18-95 F-GJSG is a checklist for the PIPER PA-18, dated 2021.
What year was the CHECK-LIST NORMALE PIPER PA 18-95 F-GJSG published?
The CHECK-LIST NORMALE PIPER PA 18-95 F-GJSG — the PIPER PA-18 checklist on file — is dated 2021.
Common. One of the most common aircraft types we track.
Most owners only have the POH. Here's the essential set for the PIPER PA-18.
- Pilot's Operating Handbook / AFM
- Checklist
- Maintenance Manual
- Parts Catalog (IPC)
- Systems & Wiring
- Service Bulletins on file
- Type Certificate (TCDS)
PIPER PA-18 for sale now
Free — save the 18 to your watchlist and track it in one place.
More PIPER PA-18manuals & documents
Related documents
If you fly the PIPER PA-18, you may also be researching these.
—In this document
Pre-Flight Checks
Includes verifying documents, conducting a pre-flight inspection, and ensuring all systems are operational.
Engine Start Procedures
Details the steps for starting the engine, including mixture settings and magneto checks.
Takeoff Procedures
Outlines the necessary checks and settings before takeoff, including engine instruments and fuel levels.
Cruise Phase
Covers adjustments to engine parameters and mixture settings during cruise flight.
Descent and Approach
Specifies mixture adjustments and checks for landing preparation.
Post-Flight Procedures
Includes steps for shutting down the engine and securing the aircraft after landing.
Summary written by AI from the source document. Check the original before relying on it. See which parts of Sprinkle are written by AI.
Safety notes
- Ensure the validity of this document with the flight manual.
- Check that all doors are secured before flight.
- Verify that the parking brake is set as required.
- Monitor engine parameters closely during all phases of flight.
- Use caution when adjusting fuel mixture settings.
- Listen to emergency frequency 121.5 after landing.
Summary written by AI from the source document. Check the original before relying on it. See which parts of Sprinkle are written by AI.
Full document text
AVANT DECOLLAGE COMMANDES LIBRES, BON SENS ET A FOND COMPENSATEUR ESSAYE/REGLE MAGNETOS 1+2 RECHAUFFE CARBU FROID/OFF MELANGE PLEIN RICHE RESERVOIR LE + PLEIN AUTONOMIE VERIFIEE INSTRUMENTS MOTEUR DANS LE VERT PORTES VEROUILLEES CEINTURES/BRETELLES AJUSTEES MOYENS RADIO COMME REQUIS BRIEFING DEPART EFFECTUE ALIGNEMENT TRANSPONDEUR ALT ALIGNE COMPAS VERIFIE DECOLLAGE CHRONO INDEX/TOP REGIME VERIFIE ANEMOMETRE VERIFIE 300’ INSTRUMENTS MOTEUR VERIFIES CROISIERE PARAMETRES MOTEUR REGLES MIXTURE REGLEE CARBURANT (BILAN) VERIFIE NB : Changer régulièrement de réservoir DESCENTE MIXTURE ENRICHIE RECHAUFFE CARBU COMME REQUIS ALTIMETRE REGLE DIRECTIONNEL RECALE RESERVOIR LE + PLEIN RADIO REGLEE APPROCHE MIXTURE RICHE RECHAUFFE CARBU COMME REQUIS REGIME ADAPTE VITESSE VERIFIEE FINALE MIXTURE PLEIN RICHE FREINS ESSAYES APRES ATTERRISSAGE RECHAUFFE CARBU FROID/OFF XPDR GND ARRET MOTEUR FREINS COMME REQUIS RADIO CLOTUREE 121.5 ECOUTE AVIONIC MASTER OFF MAGNETOS SOUS 1000 RPM ESSAIS COUPURES MIXTURE ETOUFFOIR MAGNETOS OFF / BATT OFF HEURE BLOCK NOTEE Version 04.2021 / DOCUMENT NON CONTROLLE Droits de copie Aéroclub du Haut Rhin 01/04/2021 CHECK-LIST NORMALE PIPER PA 18-95 F-GJSG Attention : Vous devez vous assurer de la validité de ce document avec le Manuel de vol AVANT MISE EN ROUTE VISITE PREVOL EFFECTUEE DOCUMENTS A BORD FREIN DE PARKING COMME REQUIS SIEGES REGLES PORTES FERMEES SERVITUDES ELECTRIQUES COUPEES BREAKERS VERIFIES MAGNETOS OFF MIXTURE RICHE BATTERIE ON JAUGES A ESSENCE VERIFIEES RESERVOIR LE -PLEIN PARAMETRES VENT/QFU/QNH MISE EN ROUTE MIXTURE RICHE RECHAUFFE CARBU FROID / OFF FREINS APPLIQUES ABORDS DEGAGES A FROID / A CHAUD INJECTIONS A LA MANETTE DE GAZ 6 / 1 GAZ 1cm MAGNETOS 1+2 DEMARREUR 10s MAX REGIME 1000 rpm PRESSION D’HUILE VERIFIEE APRES MISE EN ROUTE CHARGE VERIFIEE CLIMATISATION A LA DEMANDE AVIONIC MASTER ON CEINTURES ATTACHEES AVANT ROULAGE ALTIMETRE QNH RADIO / XPDR COMME REQUIS AUTORISATIONS OBTENUES HEURE BLOCK NOTEE ROULAGE FREINS ESSAYES INSTRUMENTS VERIFIES POINT FIXE (ESSAIS MOTEUR) FREINS APPLIQUES HUILE T°VERIFIEE RESERVOIR LE + PLEIN REGIME 1800 rpm MAGNETOS SELECTION RECHAUFFE CARBU ESSAYEE MIXTURE ESSAYEE CHARGE VERIFIEE RALENTI ESSAYE REGIME 1000 rpm










