Interagency Aviation Information Bulletin 23-03 Grand Junction Airport Construction Summer 2023

· DOI Office of Aviation Services

Public domain · DOI Office of Aviation ServicesAviation Safety Documents

Overview

The Interagency Aviation Information Bulletin 23-03 Grand Junction Airport Construction Summer 2023 () is a public-domain DOI Office of Aviation Services aviation safety document, republished here as a free chaptered HTML edition with a linked table of contents and the official PDF.

Publisher
DOI Office of Aviation Services
Document
Pages
1

Key points

  • Runway construction at Grand Junction Regional Airport (GJT) is scheduled from June 2023 to mid to late July 2023.
  • The glideslope critical area will be impacted, causing a multi-day outage with an anticipated resumption date of June 20th.
  • Runway 4/22 and Taxiway A connector will be closed for repaving from June 13 to July 25.
  • Runway 29 will be temporarily shortened by approximately 1,303 feet and will experience nightly closures from June 26 to July 16.
  • Approach impacts include the unavailability of ILS 11, LOC 11, RNAV 29, and LDA/CME RW 29 during certain construction periods.
Frequently asked questions
What are the main construction dates at Grand Junction Airport?

Construction activities are scheduled from June 2023 through mid to late July 2023, with specific activities occurring on various dates.

How will the construction affect glideslope operations?

The glideslope will experience a multi-day outage, with an anticipated date to resume operations on June 20th.

What runway will be closed for repaving?

Runway 4/22 and the Taxiway A connector will be closed for repaving from June 13 to July 25.

Will there be any impact on approach procedures during construction?

Yes, during the construction period, the ILS 11, LOC 11, RNAV 29, and LDA/CME RW 29 will be unavailable.

Who can I contact for more information about the construction?

For more information, you can contact Adam Goeden at agoeden@blm.gov or 970-683-7710, or Jake Lloyd at jrlloyd@blm.gov or 970-683-7716.

Document

OAS-28A (5/15)

Interagency Aviation

Information Bulletin

No. IA IB 23-03 Date: June 12, 2023 Page 1 of 1 Subject: Grand Junction Airport Construction Summer 2023 Area of Concern: Flight Operations Distribution: All Aviation Operations Discussion: Ongoing runway construction activities through mid to late July 2023 at the Grand Junction Regional Airport (GJT) may impact Grand Junction Airtanker Base operations.

Construction activities are scheduled for the following dates but may change based on weather or other factors affecting the progression of construction.

• June 2023 : Construction operations within the glidescope critical area will cause a multi-day outage.

After the construction has been completed, the glideslope will require an Federal Aviation Administration (FAA) certification flight check. The current anticipated date to resume glideslope operation is June 20th.

o Approach Impact – This impact has been confirmed with the FAA to switch the approach minimum from 200-1/2 to 400-3/4.

• June 13 to July 25: RWY 4/22 and TWY A connector closed for repaving.

• June 26 to July 16: RWY 29 threshold will be relocated due to construction on RWY 4/22. Construction crews will coordinate to prevent RWY 29 glidescope interference during operations.

o Approach Impact – During this time, the ILS 11, LOC 11, RNAV 29 and LDA/CME RW 29 will be unavailable. Based on historical trends, visual approaches are most common resulting in minimal impact. The RNAV 11 approaches should remain unaffected.

o Runway Length Impact – RWY 29 will be temporarily shortened by approximately 1,303ft.

o RWY 11/29 will experience nightly closures for related construction operations on June 26, July 15-16, between the hours of 0000 and 0600. The full length of RWY 11/29 will be available the morning of July 17. Two additional nights of construction related to the threshold relocation will occur in August while RWY 4/22 is grooved.

Please check NOTAMs , as schedule dates could change due to construction delays. For more information, contact Adam Goeden ( agoeden@blm.g ov or 970-683-7710) or Jake Lloyd ( jrlloyd@blm.gov or 970-683-7716).

/ s/ Keith Raley /s/ Lori Clark Keith Raley Lori Clark Chief, Aviation Safety, Program Evaluation, Branch Chief - Aviation Safety Management and Quality Management Systems DOI, Office of Aviation Services USDA, Forest Service

Source & rights

Source: doi.gov. Public-domain U.S. Government work (17 USC §105) — freely reproducible.

Permanent URL — we don’t break links.

Report a problem or request removal

Document details

Doc number
Publisher
DOI Office of Aviation Services
Pages
1
File size
206 KB