CESSNA 150 CHECKLIST
CESSNA 150 G5 · Checklist
Overview
This document is a checklist specifically for the Cessna 150 aircraft. It provides a comprehensive guide for pilots to perform pre-flight inspections, engine starting procedures, takeoff, landing, and emergency procedures. The checklist is structured to ensure that all critical systems and components are checked and verified before and during flight operations. It is designed for use by pilots to enhance safety and operational efficiency during flight preparation and execution.
- Mixture settings: RICH for starting and takeoff, LEAN 1 INCH for taxiing, IDLE/CUTOFF for securing the engine.
- Minimum oil level: 4 quarts, maximum: 6 quarts.
- Final approach airspeed: 60 KIAS with full flaps.
- Emergency landing airspeed: 60 KIAS with flaps up, 55 KIAS with flaps down.
- Normal climb speed: 60-70 KIAS.
Document
Source
Originally published by www.cpaviation.com. Sprinkle hosts a reference copy with an added summary, specifications and searchable full text.
Document details
- Type
- Checklist
- Pages
- 1
- File size
- 55 KB
- Publisher
- www.cpaviation.com
Common. One of the most common aircraft types we track.
Most owners only have the POH. Here's the essential set for the CESSNA 150 G5.
- Pilot's Operating Handbook / AFM
- Checklist
- Maintenance Manual
- Parts Catalog (IPC)
- Systems & Wiring
- Service Bulletins
- Type Certificate (TCDS)
CESSNA 150 G5 for sale now
Free — save the 150 to your watchlist and track it in one place.
More CESSNA 150 G5manuals & documents
See all 20 →- NIH RPPR Instruction GuideSupplemental Type Certificate
- BULLETIN 15 (Publication 35) Qualified Products List for ConstructionChecklist
- Data Sheet AD5940/AD5941V Speeds Reference
- Product Data SheetV Speeds Reference
- Product Data SheetV Speeds Reference
- 22 mm Push Button SpecificationsService Bulletins
- Minor Change / Minor RepairService Bulletins
- STANDARD SPECIFICATIONS AND DETAILSSpecifications
- Maintenance and Service GuideParts Catalog
- Cessna Flyer - September 2019Other Documents
- A Comparison of the V2X Communication Systems: ITS-G5 and C-V2XPerformance Data
- Product Information SheetSpecifications
If you fly the CESSNA 150 G5, you may also be researching these.
In this document
Pre-Flight Inspection
The pre-flight inspection section outlines the necessary checks to be performed before flight. This includes verifying documentation, checking the control lock, ensuring the ignition switch is off, and confirming fuel quantity. Specific checks are detailed for the empennage, wings, and nose of the aircraft, including securing surfaces and checking fluid levels.
Starting Engine
This section details the steps required to start the engine safely. Pilots are instructed to set the mixture to rich, ensure carb heat is cold, and prime as required. The checklist emphasizes the importance of checking the oil pressure after starting and ensuring the prop area is clear before ignition.
Normal Takeoff
The normal takeoff section provides critical parameters for takeoff, including setting the mixture to rich, ensuring flaps are at 0°, and achieving a rotation speed of 50-55 KIAS. It also specifies a climb speed of 60-70 KIAS.
Emergency Procedures
The emergency procedures section outlines actions to take in various scenarios, such as engine failure after takeoff and during flight. It includes specific airspeed targets and actions for managing fuel and ignition systems in emergencies.
Securing Aircraft
This section provides a checklist for securing the aircraft after landing, including setting the brakes, leaning the mixture, and turning off electrical systems.
Safety notes
- Always ensure the prop area is clear before starting the engine.
- Monitor oil pressure immediately after starting the engine.
- In case of engine failure, maintain airspeed of 60 KIAS.
Full document text
CESSNA 150 CHECKLIST PRE-FLIGHT INSPECTION CABIN 1. Document – A.R.R.O.W. 2. Control Lock – REMOVE 3. Ignition Switch – OFF 4. Master Switch – ON 5. Flaps – DOWN 6. Fuel Quantity – CHECK 7. Master Switch – OFF 8. Fuel Valve – ON EMPENNAGE 1. Empennage surface – CHK 2. Horizontal stabilizer – SECURE 3. Elevator – FREE & SECURE 4. Rudder – FREE & SECURE 5. Tail tie-down – DISCONNECT 6. Lights & Antenna – CHK 7. ELT Antenna – CHK RIGHT WING 1. Flap – FREE & SECURE 2. Aileron – FREE & SECURE 3. Lights & Wingtip – CHK 4. Leading edge – CHK 5. Wing tie-down – DISCONNECT 6. Main wheel & tire – CHK 7. Fuel tank sump drain – SAMPLE 8. Fuel quantity – VISUAL CHK 9. Fuel filler cap – SECURE NOSE 1. Engine oil – CHK LEVEL MIN 4 qts. MAX 6 qts. 2. Strainer drain – SAMPLE/CHK 3. Prop/Spinner – CHK 4. Air filter – CHK CLEAR 5. Landing light – CHK 6. Nose strut/tire – CHK 7. Static port – CHK OPEN LEFT WING 1. Main wheel & tire – CHK 2. Fuel tank sump drain – SAMPLE 3. Fuel quantity – VISUALLY CHK 4. Fuel filler cap – SECURE 5. Pitot tube cover – REMOVE/CHK 6. Stall warning opening – CHK 7. Fuel tank vent – OPEN 8. Wing tie-down – DISCONNECT 9. Leading edge – CHK 10. Lights/Wingtip – CHK 11. Aileron – FREE & SECURE 12. Flaps – FREE & SECURE [See POH for details] BEFORE STARTING ENGINE 1. Pre-flight – COMPLETE 2. Passengers briefed, seatbelts, harnesses – ON 3. Fuel shutoff valve – ON 4. Radios - OFF 5. Electrical Equipment – OFF 6. Circuit breakers – CHECK IN 7. Brakes – TEST / SET STARTING ENGINE 1. Mixture – RICH 2. Carb heat – COLD 3. Prime – AS REQUIRED 4. Master switch -- ON 5. Beacon Light – ON 6. Throttle – OPEN 1/8” 7. Prop Area – CLEAR 8. Ignition – START 9. Oil Pressure – CHK 10. Radio – ON/SET 11. Transponder – ON /ALT 12. Wing Flaps – UP 13. Mixture – LEAN 1 INCH 14. READY TO TAXI BEFORE TAKE OFF 1. Doors – CLOSED/LATCHED 2. Brakes – ON 3. Flight controls - FREE/CORRECT 4. Flight instruments – SET 5. Fuel valve – ON 6. Mixture – RICH 7. Trim – SET FOR TAKEOFF 8. Throttle – 1700 RPM - Mags – 150 DROP / 75 DIFF - Carb heat – CHK - Engine instr. – CHK - Ammeter – CHK - Suction – CHK - Idle – CHK WITH CARB HEAT ON 9. Throttle – BELOW 1000 RPM 10. Radios – SET 11. Transponder – ON ALT 12. Lights – ON 13. Throttle friction lock – ADJ NORMAL TAKEOFF 1. Mixture – RICH 2. Wing flaps - 0° 3. Carb heat – COLD 4. Throttle – FULL OPEN 5. Elevator – ROTATE 50Þ55 KIAS 6. Climb Speed – 60Þ70 KIAS ENROUTE CLIMB 1. Airspeed – 65Þ75 KIAS CRUISE 1. Power – 2000Þ2700 RPM 2. Elevator – TRIM 3. Mixture – LEAN CESSNA 150 CHECKLIST CONT’D BEFORE LANDING 1. Seats, seatbelts, harnesses - ON 2. Mixture – RICH OR DENSITY ALT 3. Radio – SET 4. Landing Light - ON 5. Carb heat – ON BEFORE CLOSING THROTTLE LANDING 1. Final Approach Airspeed 60 KIAS 2. Flaps – Full 3. Final approach Airspeed –60 KIAS Þ W/ FLAPS DOWN 40 Degrees 4. Touchdown at stall – MAINS FIRST 5. Landing roll – GENTLY LOWER NOSE 6. Braking – MINIMUM REQ’D AFTER LANDING 1. Wing Flaps – UP 2. Carb heat – COLD 3. Lights – STROBES/LANDING OFF 4. Trim – RESET SECURING AIRCRAFT 1. Brakes – ON 2. Mixture -- LEAN 1 INCH, 3. 1700 rpm 15 sec. 4. Radios/Transponder – OFF 5. 1000 rpm 6. Mixture – IDLE/CUTOFF 7. Magnetos—OFF KEYS OUT 8. Master switch – OFF 9. Electrical switches – OFF 10. Control lock – INSTALL EMERGENCY PROCEDURES ENGINE FAILURE AFTER TAKEOFF 1. Airspeed – 60 KIAS 2. Mixture – IDLE/CUTOFF 3. Fuel valve – OFF 4. Ignition switch – OFF 5. Doors – OPEN ENGINE FAILURE DURING FLIGHT 1. Airspeed – 60 KIAS 2. Carb heat – ON 3. Primer – IN & LOCKED 4. Fuel valve – ON 5. Mixture – RICH 6. Ignition – BOTH/START EMERGENCY LANDING W/O POWER 1. Airspeed – 60 KIAS [FLAPS UP] -55 KIAS [FLAPS DOWN] 2. Mixture – IDLE/CUTOFF 3. Fuel valve – OFF 4. Ignition switch – OFF 5. Wing Flaps – AS REQUIRED 6. Master switch – OFF 7. Doors – OPEN BEFORE TOUCHDOWN 8. Touchdown – TAIL LOW 9. Brakes – APPLY HEAVILY ENGINE FIRE ON GROUND 1. CONTINUE CRANKING TO START ENGINE 2. Engine Starts – POWER1700 for few minutes AND THEN SHUT DOWN 3. No Start – SHUTDOWN • THROTTLE FULL OPEN • MIXTURE IDLE CUTOFF • CONTINUE CRANKING ENGINE SECURE: • MASTER SWITCH OFF • IGNITION OFF • FUEL VALVE OFF • FIRE EXTINGUISH • INSPECT FOR DAMAGE ENGINE FIRE IN FLIGHT 1. Mixture – IDLE/CUTOFF 2. Fuel valve – OFF 3. Master switch – OFF 4. Cabin heat/air – OFF 5. Airspeed – 85 KIAS OR AS NECESSARY TO EXTINGUISH FIRE 6. Forced landing – EXECUTE ELECTRICAL FIRE IN FLIGHT 1. Master switch – OFF 2. All other switches (except ignition) OFF 3. Vents/cabin air/heat – OFF 4. Fire extinguisher – ACTIVATE WHEN FIRE APPEARS OUT 1. Master switch – ON 2. Circuit breakers – CHK, DON’T RESET 3. Radio & Electric – ON, ONE AT A TIME 4. VENTILATE CABIN OVER VOLTAGE LIGHT 1. Master switch – OFF 2. Master switch – ON 3. Light – OFF, IF ON, TERMINATE FLIGHT AMMETER DISCHARGE 1. Alternator – OFF 2. Electrical load – REDUCE 3. Flight – TERMINATE ASAP
What's in the CESSNA 150 G5 TCDS
A Type Certificate Data Sheet (TCDS) is the FAA's record of what an aircraft type was approved as. It is the source of truth for weights, seating, fuel and the rules the design was certified against. Expand any line to see what it means.
3,640 CESSNA 150 G5 parts for sale
See all →





Parts listed for sale by vetted eBay sellers — confirmed on eBay at checkout.










