Skip to main content

Installation Instructions for Cessna 177 Cardinal Sunvisor System

CESSNA 177 · Systems Description

Free account — keep the POHs & checklists you reference in one place.

Overview

This document provides installation instructions for the Rosen Sunvisor System specifically designed for the Cessna 177 Cardinal. It outlines the steps necessary to install the sun visor system, which enhances sun shielding protection for the aircraft. The installation process is estimated to take approximately 4 to 6 hours and requires careful attention to detail to ensure a professional fit. The document includes specific hardware requirements and detailed procedures for both aircraft with and without handgrips, making it applicable to a range of Cessna 177 models. Additionally, it emphasizes the importance of documenting the installation in the Aircraft Maintenance Log, as it is an FAA STC installation.

  • The installation of the Rosen Sunvisor System takes approximately 4 to 6 hours.
  • The installation requires specific hardware, including a 5/32 Allen Key and #10-32 screws.
  • For aircraft with handgrips, the installation utilizes existing fasteners; for those without, rivnuts must be installed.
  • Careful marking and drilling are essential to ensure proper fit and alignment of the visor system.
  • Regular maintenance includes cleaning and adjusting the tension of the visor's pivot points.

Document

Source

Originally published by www.aircraftspruce.com. Sprinkle hosts a reference copy with an added summary, specifications and searchable full text.

Report a problem or request removal

Document details

Type
Systems Description
Year
2005
Pages
4
File size
153 KB
Publisher
www.aircraftspruce.com
How rare is it?
578CESSNA 177 registered worldwide · 500 active

Common. One of the most common aircraft types we track.

Documentation completeness
7/7

Full essential library on file for the CESSNA 177.

More CESSNA 177manuals & documents

See all 49
Similar aircraft

If you fly the CESSNA 177, you may also be researching these.

In this document

Installation Overview

The installation of the Rosen Sunvisor System for the Cessna 177 Cardinal is designed to enhance sun shielding protection. The process is straightforward but requires careful execution to ensure a professional appearance. The installation is expected to take between 4 to 6 hours.

Installation Hardware

The installation kit includes essential tools such as a 5/32 Allen Key and a 9/64 Allen Key, along with specific screws and rivnuts necessary for the installation process.

Installation Steps for Aircraft with Handgrips

For aircraft equipped with handgrips, the installation involves removing the existing visors and securing the new visor using the handgrip fasteners. Detailed steps include marking positions, drilling holes, and ensuring proper alignment with the door frame.

Installation Steps for Aircraft without Handgrips

For aircraft lacking handgrips, the installation requires the use of rivnuts to secure the visor bracket. The process includes marking locations, drilling holes, and ensuring the visor is aligned correctly with the door post.

Maintenance and Adjustments

To maintain the sun visor system, periodic cleaning with a non-abrasive cloth and mild soap is recommended. The tension on the pivot points can be adjusted using the provided hex keys to ensure smooth operation.

Safety notes

  • Ensure all installation steps are followed carefully to avoid damage to the aircraft.
  • Use caution when removing brittle trim pieces to prevent cracking.

Full document text

86365 College View Road Eugene, Oregon USA 97405 541.747.0034 w w w . r o s e n v is o r . c o m Page 1 of 4 Installation Instructions for Cessna 177 Cardinal Sunvisor System This is an FAA STC installation and requires an Aircraft Maintenance log entry. Kit RCS-300-5 Doc: 9050-0118-019 Rev Date Approved C 6/2/2005 GH The enclosed NSA Sunvisor System from Rosen Sunvisor Systems will provide that extra margin of safety and comfort that the Cardinal has never had in relation to Sun shielding protection. The Installation is attractive in appearance and fits well with the aircraft. Care should be taken during the installation process not to rush in order to insure the final trim fit is professional in every way. Installing your Rosen Sunvisor System is easily performed and should take approximately 4 to 6 hours. Please read these short instructions COMPLETELY before starting. Installation Hardware (included): Qty: (1) 5/32 Allen Key for #10-32 Cap Screw (1) 9/64 Allen Key • Remove the old auto style visors by pulling them outboard. • Most Cardinals have hand grips on the door posts and your unit is designed to pick up the top #10 fastener from this grip. Aircraft without this handgrip will need to install an A10K80 rivnut (provided). Figures to the right illustrate the handgrip and location for rivnut if needed. Aircraft with Handgrips • First, remove the small metal cover over the handgrip screws. This can be done using a small common screwdriver and prying or popping them off. • Remove the two #10 screws that secure the handgrip. • Take the Pilot’s NSA visor and using the long #10 screw provided (MS16996-14B), put it through the slot in the bottom of the bracket and temporarily install it in the top handgrip screw hole as shown. The top of the arm should barely touch the top trim. • Position the visor towards the rear of the aircraft and extend the sliding arm. The top of the visor should be parallel to the top of the door frame with the door open. Use a pencil to mark either side of the bracket on the door frame liner. • Rotate the visor to the front. The visor arm should just fit under the center overhead console while the bracket is still between the pencil marks. The flat surface of the bracket should be parallel with the flat surface of the door post where the screw is attached. • Check your marks very carefully by going through the above steps several times to assure a perfect fit. • The trim pieces should be marked as shown. • Remove the top royalite trim piece that runs around the top of the pilot’s window. 86365 College View Road Eugene, Oregon USA 97405 541.747.0034 w w w . r o s e n v i s o r . c o m Page 2 of 4 • Remove the royalite trim piece that covers the door post. Be aware that the royalite may be very brittle from sitting in the sun and extreme care should be used when removing and installing it. If it has been cracked, or gets a small crack, you may want to consider using duct tape on the back side as reinforcement. We have seen this done on different Cessna trim pieces with good result. • Use a 3/16” drill or smaller to drill through the trim between the marks as shown. • Trim the hole so the ¼” by 1” bracket will pass through the hole. • Take the 3/16”pointed rod provided and while aligned with the pencil marks and flush with the flat surface on the front side mark the opposite side of the royalite as shown. • The rod should have left marks that you can see from the other side. Drill through these and square out a small slot with a file. • Slide a 1” rule through the slot and align it with the pencil marks. Enlarge the back hole as necessary until the rule slides through as shown. • Because of the blocking plate that is on the back of the bracket, the back hole in the royalite will need to be approximately 1/2” by 1”. It is important to use the rule on the flat surface so that the back hole can be proportioned correctly and in the right plane. The figure shows a view if you could look from the back side of the royalite with the rule protruding. Again take your time and make sure the trim is cut correctly. • When the pilot’s visor bracket with the backing bar can slide into the trim with the slots you have just cut, re-install the top piece of trim that runs around the top of the window and into the center control. • Now mount the visor and bracket without the door post trim. You may need to cut a small piece of the insulation to get the bracket to fit tight against the door post. This will allow you to adjust the backing bar to the contour of the door post and keep the bracket from turning. • Adjust the bracket so the top just barely hits the top trim and the extended visor is parallel to the top of the door frame (door open) when it is rotated and extended to the rear. Tighten the backing bar against the door post with the hex key provided. • Your Pilot side mounting bracket is now in place. Remove the visor arm and mounting block from the vertical mounting post. • Remove the overhead trim piece. • Now slip the visor bracket through the slots in the door post trim and carefully re-install the door post trim. Align the small trim screw holes and then install the bottom handgrip fastener and install the MS16996-14B screw provided in the top location. 86365 College View Road Eugene, Oregon USA 97405 541.747.0034 w w w . r o s e n v i s o r . c o m Page 3 of 4 • Check to insure the top of the visor bracket is not hitting the windscreen. If it does loosen the visor bracket and reposition it to provide clearance and retighten. • Replace the top trim piece and erase any pencil marks that might be left on the trim. • Replace the visor arm assembly and retaining screw and tension to provide tension that is free but not loose. • Repeat for the co-pilot’s side. • Place the FAA STC and AML (if appropriate) in the Aircraft Maintenance Log and make an installation entry. Aircraft without Handgrips

Show full text

• This installation is easier in that no special work on the trim needs to be done, but rivnuts need to be installed in the door post to secure the bracket. (This is the same type of rivnut and location Cessna uses for the hand grip installation.) • Use a pencil to mark the approximate location for the fastener as shown. • Hold the bracket of the pilots visor assembly against the door post so you can see the mark in the slot and angle the bracket so that it just hits the overhead trim. • Holding the bracket stationary swivel the visor to the rear and make sure the unit is parallel and inline with the door line (door open). • As with the handgrip instructions, pencil mark the outside of the bracket on the trim. • When swiveled forward the visor should just miss the center overhead console. • When the front and side criteria are met, make a pencil mark in the center of the bottom bracket slot. • Adjust the blocking plate so that it rides on the side of the door post. • Mark the front and rear of the bracket bottom slot then make a mark 0.1” in from either end as shown. • When you are sure of the bracket location and your slot marks are centered and correct, drill a 1/8” hole through the trim and door post. Be careful not to drill into the outer skin of the aircraft! • Remove the door post trim (you may need to remove the front overhead trim piece as well). • Install the A10K80 rivnuts into the 1/8” holes using appropriate tooling. 86365 College View Road Eugene, Oregon USA 97405 541.747.0034 w w w . r o s e n v i s o r . c o m Page 4 of 4 • Re-install the trim • Using the #10-32 Socket head cap screws provided install the pilot’s visor. • Repeat for the co-pilot’s side. • Place the FAA STC and AML (if appropriate) in the Aircraft Maintenance Log and make an installation entry. For continued airworthiness: (Ground operations only) • Periodically clean the visor with a soft non-abrasive cloth and mild soap or aviation grade windscreen cleaner. • Hex Keys are provided to periodically adjust the tension on all the pivot points so that they move freely but not loosely. • Every movement of your new Rosen Sun visor is tension- able, so you can adjust it to your preference before flight.

Type certificate, explained

What's in the CESSNA 177 TCDS

A Type Certificate Data Sheet (TCDS) is the FAA's record of what an aircraft type was approved as. It is the source of truth for weights, seating, fuel and the rules the design was certified against. Expand any line to see what it means.

TCDS A13CERev 25· Issued 2007
Read the full TCDS

2,006 CESSNA 177 parts for sale

See all →

Parts listed for sale by vetted eBay sellers — confirmed on eBay at checkout.