Skip to main content

PREMIER 1 S/N RB-62 N808CS: Status Report

Beechcraft Premier IA · Parts Catalog

Free account — keep the POHs & checklists you reference in one place.

Overview

This document serves as a parts catalog and status report for the Beechcraft Premier 1 aircraft, specifically for serial number RB-62, registered as N808CS. It includes detailed information on the aircraft's maintenance history, engine specifications, and various service packages. The report is intended for the aircraft's owner and maintenance personnel, providing essential data for tracking maintenance schedules and compliance with airworthiness directives. The document outlines the current status of the aircraft, including hours flown and maintenance checks performed, ensuring that operators can maintain the aircraft in optimal condition.

  • Aircraft Model: Beechcraft Premier 1 (S/N RB-62)
  • Total Flight Hours: 2453.8
  • Total Airframe Life (AFL): 1945 hours
  • Engine Model: Williams FJ44-2A
  • Scheduled Maintenance Packages include checks at 600-hour intervals.

Document

Source

Originally published by www.elliottjets.com. Sprinkle hosts a reference copy with an added summary, specifications and searchable full text.

Report a problem or request removal

Document details

Type
Parts Catalog
Year
2015
Pages
107
File size
406 KB
Publisher
www.elliottjets.com
Documentation completeness
5/7

Most owners only have the POH. Here's the essential set for the Beechcraft Premier IA.

More Beechcraft Premier IAmanuals & documents

See all 23

In this document

Current Aircraft Status

As of September 15, 2015, the Beechcraft Premier 1 (S/N RB-62) has logged 2453.8 hours of flight time and 1945 hours of airframe life (AFL). This section provides a snapshot of the aircraft's operational history and maintenance requirements.

Engine Specifications

The aircraft is equipped with two Williams FJ44-2A engines, serial numbers 105031 and 105032. Each engine has specific maintenance packages that must be adhered to, including scheduled inspections and checks based on flight hours.

Maintenance Packages

The document outlines various maintenance packages for the engines, including checks that are required at specific intervals (e.g., every 600 hours or 6 months). Each package includes details on compliance intervals, next due dates, and references to workcards for specific tasks.

Lubrication Servicing

Lubrication servicing is scheduled at 200-hour intervals, with specific tasks outlined for various components of the aircraft, including the landing gear and flight control surfaces. This section details the requirements for maintaining the aircraft's mechanical systems.

Air Conditioning System Maintenance

The air conditioning system maintenance section includes checks for components such as the cockpit evaporator blower and environmental system inspections. These tasks are critical for ensuring passenger comfort and system reliability.

Safety notes

  • Ensure compliance with all scheduled maintenance checks to maintain airworthiness.
  • Document any changes to maintenance status or aircraft configuration promptly.

Full document text

AIRCRAFT PREMIER 1 RB-62/N808CS BEECHCRAFT CORPORATION - KS LAST ACTUALS SERIAL/REGNO: MODEL: MANUFACTURER: CURRENT ACTUAL DATES CERTIFICATION DATE: MANUFACTURER DATE: 24-APR-2003 24-APR-2003 ______________ 15-SEP-2015 2453.8 ____/____/________ as of as of A/C HRS A/C HRS ______________ 15-SEP-2015 1945 ____/____/________ as of as of AFL AFL ______________ 24-SEP-2013 570.72 ____/____/________ as of as of ACH ACH ENGINE NO. 1 FJ44-2A 105031/FJ44-2A WILLIAMS/ROLLS LAST ACTUALS SERIAL/PART: MODEL: MANUFACTURER: CURRENT ACTUAL INSTALLED ON 24-APR-2003 ______________ 15-SEP-2015 2453.8 ____/____/________ as of as of 0 ENG. HRS ENG. HRS ENG. HRS 0 A/C HRS ______________ 15-SEP-2015 1945 ____/____/________ as of as of 0 ENC ENC ENC ENGINE NO. 2 FJ44-2A 105032/FJ44-2A WILLIAMS/ROLLS LAST ACTUALS SERIAL/PART: MODEL: MANUFACTURER: CURRENT ACTUAL INSTALLED ON 24-APR-2003 ______________ 15-SEP-2015 2453.8 ____/____/________ as of as of 0 ENG. HRS ENG. HRS ENG. HRS 0 A/C HRS ______________ 15-SEP-2015 1945 ____/____/________ as of as of 0 ENC ENC ENC OPERATOR: ADDRESS: PHONE: FAX: CONQUEST INVESTMENTS INC. C/O MR. STEVE COONS PALM BEACH GARDENS FL 33418 561-762-5136 (CELL) OWNER: ADDRESS: PHONE: FAX: CONQUEST INVESTMENTS INC. 2711 CENTERVILLE ROAD WILMINGTON DE 19808 ANALYST: NEIL SANDVIK 1-866-581-2267 (OFFICE) 800-787-9749 (EFAX-CARDS) 316-462-2442 (FAX) 631-980-4222 (EFAX-CARDS) PLEASE RECORD CHANGES TO ADDRESS, LAST ACTUALS (IF ANY) AND FAX THIS SHEET BACK TO CAMP. WWW.CAMPSYSTEMS.COM EMAIL: NSANDVIK@CAMPSYSTEMS.COM PREMIER 1 S/N RB-62 N808CS Status Report 05-OCT-2015 © CAMP SYSTEMS HAWKER¿, BEECHCRAFT¿, BEECHJET AND KING AIR ARE TRADEMARKS OF HAWKER BEECHCRAFT CORPORATION 1 Of 107 TIME LIMITS/MAINTENANCE CHECKS 05 CHAPTER PKG 6 MOS 18-SEP-2014 HRS/MSC AFL 600 2355.1 1855 2955.1 052002 SCHEDULED A INSPECTION See Workcard REF: 501.3 2975.1 +20 PKG 7 MOS 18-SEP-2014 HRS/MSC AFL 1200 2355.1 1855 3555.1 052003 SCHEDULED B INSPECTION See Workcard REF: 1101.3 3575.1 +20 ENGINE NO. 1 Model : FJ44-2A Serial # 105031 Part # FJ44-2A 05.010 PKG 1 in PKG 2 MOS 20-FEB-2013 HRS/MSC ENC 300 2192.8 1748 (2492.8) 2492.8 051201 NO. 1 ENGINE - FJ44 CHECK 1 GENERIC NO REF REF: 39 05.020 PKG 2 MOS 13-OCT-2011 HRS/MSC ENC 600 1980.1 1589 (2492.8) 2492.8 051202 NO. 1 ENGINE - FJ44 CHECK 2 GENERIC NO REF REF: -87.3 39 05.030 PKG 3 MOS 23-JUL-2010 HRS/MSC ENC 10500 1779.6 1454 (12250) 12250 051203 NO. 1 ENGINE - FJ44 CHECK 3 See Workcard REF: -29.6 9796.2 12300 +50 THE PACKAGE IS IN A "TRUE PROGRESSIVE" SET AND THE SET REQUIREMENT IS 1750 HRS 05.040 PKG 4 MOS 24-APR-2003 HRS/MSC ENC 10500 0 0 (3500) 3500 051204 NO. 1 ENGINE - FJ44 CHECK 4 See Workcard REF: -7000 1046.2 3550 +50 THE PACKAGE IS IN A "TRUE PROGRESSIVE" SET AND THE SET REQUIREMENT IS 1750 HRS 05.050 PKG 5 MOS 24-APR-2003 HRS/MSC ENC 10500 0 0 (5250) 5250 051205 NO. 1 ENGINE - FJ44 CHECK 5 See Workcard REF: -5250 2796.2 5300 +50 THE PACKAGE IS IN A "TRUE PROGRESSIVE" SET AND THE SET REQUIREMENT IS 1750 HRS 05.060 PKG 6 MOS 24-APR-2003 HRS/MSC ENC 10500 0 0 (7000) 7000 051206 NO. 1 ENGINE - FJ44 CHECK 6 See Workcard REF: -3500 4546.2 7050 +50 THE PACKAGE IS IN A "TRUE PROGRESSIVE" SET AND THE SET REQUIREMENT IS 1750 HRS 05.070 PKG 7 MOS 24-APR-2003 HRS/MSC ENC 10500 0 0 (8750) 8750 051207 NO. 1 ENGINE - FJ44 CHECK 7 See Workcard REF: -1750 6296.2 8800 +50 THE PACKAGE IS IN A "TRUE PROGRESSIVE" SET AND THE SET REQUIREMENT IS 1750 HRS Report Date: 05-OCT-2015 TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL NEXT DUE WARR EXP ADJ (ENG/APU) A/C TIME REMAINING MAX LIMIT Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 2 Of 107 05.080 PKG 8 MOS 24-APR-2003 HRS/MSC ENC 10500 0 0 (10500) 10500 051208 NO. 1 ENGINE - FJ44 CHECK 8 See Workcard REF: 8046.2 10550 +50 THE PACKAGE IS IN A "TRUE PROGRESSIVE" SET AND THE SET REQUIREMENT IS 1750 HRS ENGINE NO. 2 Model : FJ44-2A Serial # 105032 Part # FJ44-2A 05.010 PKG 1 in PKG 2 MOS 20-FEB-2013 HRS/MSC ENC 300 2192.8 1748 (2492.8) 2492.8 051201 NO. 2 ENGINE - FJ44 CHECK 1 GENERIC NO REF REF: 39 05.020 PKG 2 MOS 13-OCT-2011 HRS/MSC ENC 600 1980.1 1589 (2492.8) 2492.8 051202 NO. 2 ENGINE - FJ44 CHECK 2 GENERIC NO REF REF: -87.3 39 05.030 PKG 3 MOS 23-JUL-2010 HRS/MSC ENC 10500 1779.6 1454 (12250) 12250 051203 NO. 2 ENGINE - FJ44 CHECK 3 See Workcard REF: -29.6 9796.2 12300 +50 THE PACKAGE IS IN A "TRUE PROGRESSIVE" SET AND THE SET REQUIREMENT IS 1750 HRS 05.040 PKG 4 MOS 24-APR-2003 HRS/MSC ENC 10500 0 0 (3500) 3500 051204 NO. 2 ENGINE - FJ44 CHECK 4 See Workcard REF: -7000 1046.2 3550 +50 THE PACKAGE IS IN A "TRUE PROGRESSIVE" SET AND THE SET REQUIREMENT IS 1750 HRS 05.050 PKG 5 MOS 24-APR-2003 HRS/MSC ENC 10500 0 0 (5250) 5250 051205 NO. 2 ENGINE - FJ44 CHECK 5 See Workcard REF: -5250 2796.2 5300 +50 THE PACKAGE IS IN A "TRUE PROGRESSIVE" SET AND THE SET REQUIREMENT IS 1750 HRS 05.060 PKG 6 MOS 24-APR-2003 HRS/MSC ENC 10500 0 0 (7000) 7000 051206 NO. 2 ENGINE - FJ44 CHECK 6 See Workcard REF: -3500 4546.2 7050 +50 THE PACKAGE IS IN A "TRUE PROGRESSIVE" SET AND THE SET REQUIREMENT IS 1750 HRS 05.070 PKG 7 MOS 24-APR-2003 HRS/MSC ENC 10500 0 0 (8750) 8750 051207 NO. 2 ENGINE - FJ44 CHECK 7 See Workcard REF: -1750 6296.2 8800 +50 THE PACKAGE IS IN A "TRUE PROGRESSIVE" SET AND THE SET REQUIREMENT IS 1750 HRS 05.080 PKG 8 MOS 24-APR-2003 HRS/MSC ENC 10500 0 0 (10500) 10500 051208 NO. 2 ENGINE - FJ44 CHECK 8 See Workcard REF: 8046.2 10550 +50 THE PACKAGE IS IN A "TRUE PROGRESSIVE" SET AND THE SET REQUIREMENT IS 1750 HRS SERVICING 12 CHAPTER Report Date: 05-OCT-2015 TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL NEXT DUE WARR EXP ADJ (ENG/APU) A/C TIME REMAINING MAX LIMIT Status Report

Show full text

PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 3 Of 107 PKG 8 MOS 18-SEP-2014 HRS/MSC AFL 200 2355.1 1855 2555.1 SPC24 200 HOUR LUBRICATION SERVICING See Workcard REF: 101.3 2575.1 +20 PKG 9 MOS 18-SEP-2014 HRS/MSC AFL 600 2355.1 1855 2955.1 SPC25 600 HOUR LUBRICATION SERVICING See Workcard REF: 501.3 2975.1 +20 Report Date: 05-OCT-2015 TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL NEXT DUE WARR EXP ADJ (ENG/APU) A/C TIME REMAINING MAX LIMIT Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 4 Of 107 TIME LIMITS/MAINTENANCE CHECKS 05 CHAPTER 05UNS1 ACCOMPLISH UNSCHEDULED LIGHTNING STRIKE INSPECTION 05.040 REF: MOS HRS/MSC AFL A/R 24-APR-2003 0 0 See Workcard 05UNS2 ACCOMPLISH UNSCHEDULED HARD LANDING INSPECTION 05.050 REF: MOS HRS/MSC AFL A/R 24-APR-2003 0 0 See Workcard 05UNS3 ACCOMPLISH UNSCHEDULED TURBULENT AIR INSPECTION 05.060 REF: MOS HRS/MSC AFL A/R 24-APR-2003 0 0 See Workcard 05UNS4 ACCOMPLISH UNSCHEDULED FOREIGN OBJECT DAMAGE INSPECTION 05.070 REF: MOS HRS/MSC AFL A/R 24-APR-2003 0 0 See Workcard 05UNS5 ACCOMPLISH UNSCHEDULED HIGH DRAG/SIDE LOAD INSPECTION 05.080 REF: MOS HRS/MSC AFL A/R 24-APR-2003 0 0 See Workcard UNSCHEDULED MAINTENANCE CHECK 05UNS6 ACCOMPLISH UNSCHEDULED OPERATION IN OR AROUND VOLCANIC ASH INSPECTION 05.090 REF: MOS HRS/MSC AFL A/R 24-APR-2003 0 0 See Workcard 05UNS7 ACCOMPLISH UNSCHEDULED AIRSPEED (OVERSPEED) LIMITATION EXCEEDANCE INSPECTION REF: MOS HRS/MSC AFL A/R 24-APR-2003 0 0 PKG 700A15 (s) INSPECT NOSE LANDING GEAR UPPER DRAG BRACE PKG 7 REF: MOS HRS/MSC AFL 1200 24-APR-2003 0 0 SERVICING 12 CHAPTER PKG + 123C01 (s) LUBRICATE RUDDER, ELEVATOR AND AILERON TRIM TAB PIANO HINGE 12.070 PKG 1,8 REF: MOS HRS/MSC AFL 200 18-SEP-2014 2355.1 1855 AMM 12-20-02 +20 PKG 127A01 (s) LUBRICATE NOSE LANDING GEAR LUBRICATIONS POINTS PKG 8 REF: MOS HRS/MSC AFL 200 18-SEP-2014 2355.1 1855 See Workcard TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 5 Of 107 PKG 127B01 (s) LUBRICATE LEFT MAIN LANDING GEAR LUBRICATION POINTS PKG 8 REF: MOS HRS/MSC AFL 200 18-SEP-2014 2355.1 1855 See Workcard PKG 127C01 (s) LUBRICATE RIGHT MAIN LANDING GEAR LUBRICATION POINTS PKG 8 REF: MOS HRS/MSC AFL 200 18-SEP-2014 2355.1 1855 See Workcard PKG 200A02 (s) LUBRICATE COCKPIT SECTION ZONE 210 - ABOVE FLOOR 12.010 PKG 6,9 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG 200D01 (s) LUBRICATE MID FUSELAGE ZONE 230 - WING-TO-FUSELAGE FAIRING 12.040 PKG 6,7,9 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 300A11 (s) LUBRICATE AFT FUSELAGE ZONE 310 AFT PRESSURE BULKHEAD 12.050 PKG 6,7,9 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard PKG + 300B01 (s) LUBRICATE ZONE 320 VERTICAL STABILIZER 12.060 PKG 6,7,9 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG 300C01 (s) LUBRICATE ZONE 330 HORIZONTAL STABILIZER 12.130 PKG 6,7,9 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 500C02 (s) LUBRICATE LEFT WING ZONE 500/600, 530/630, 540/640 - FLIGHT CONTROLS (600 HOURS) 12.090 PKG 6,9 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG 600C02 (s) LUBRICATE RIGHT WING ZONE 600, 630, 640 - FLIGHT CONTROLS (600 HOURS) 12.090 PKG 6,9 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 700A01 (s) LUBRICATE FORWARD FUSELAGE ZONE 710 - NOSE WHEEL WELL 12.100 PKG 6,9 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 700B01 (s) LUBRICATE LEFT WING ZONE 720 LEFT MAIN LANDING GEAR 12.110 PKG 6,7,9 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 6 Of 107 PKG + 700C01 (s) LUBRICATE RIGHT WING ZONE 730 RIGHT MAIN LANDING GEAR 12.110 PKG 6,7,9 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG 800A01 (s) LUBRICATE ZONE 830 PASSENGER DOOR, ZONE 840 EMERGENCY EXIT, ZONE 850 LEFT BAGGAGE AND ZONE 860 RIGHT AVIONICS DOOR 12.160 PKG 6,9 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 STANDARD PRACTICES - AIRFRAME 20 CHAPTER PKG 100D06 (s) RESISTANCE CHECK ELECTRICAL BOND - NOSE AVIONICS ZONE 120 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard PKG 100E11 (s) RESISTANCE CHECK ELECTRICAL BOND - RADOME ZONE 110 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard PKG 200A15 (s) RESISTANCE CHECK ELECTRICAL BOND - COCKPIT ZONE 210 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard PKG 200B11 (s) RESISTANCE TEST ELECTRICAL BOND - CABIN ZONE 220 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard PKG 200C20 (s) RESISTANCE CHECK ELECTRICAL BOND - WING TO FUSELAGE ZONE 230 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard PKG 200C21 (s) RESISTANCE CHECK ELECTRICAL BOND - ANTENNAS PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard PKG 300A48 (s) RESISTANCE CHECK ELECTRICAL BOND - EMPENNAGE ZONE 310 AFT AVIONICS COMPARTMENT PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard PKG 300A49 (s) RESISTANCE CHECK ELECTRICAL BOND - EMPENNAGE ZONE 310 TAILCONE PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard PKG 300B16 (s) RESISTANCE CHECK ELECTRICAL BOND - EMPENNAGE ZONE 320 VERTICAL STABILIZER PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 7 Of 107 PKG 300C19 (s) RESISTANCE CHECK ELECTRICAL BOND - EMPENNAGE ZONE 330 HORIZONTAL STABILIZER PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard PKG 500A11 (s) RESISTANCE CHECK ELECTRICAL BOND - ZONES 500/600 WINGS PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard PKG 600A10 (s) RESISTANCE CHECK ELECTRICAL BOND - ZONES 500/600 WINGS PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard AIR CONDITIONING 21 CHAPTER PKG 100A11 (s) INSPECT COCKPIT EVAPORATOR BLOWER - FORWARD - MOTOR BRUSHES 21.100 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG 100B01 (s) INSPECT ENVIRONMENTAL SYSTEM - AFT PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard PKG + 100B02 (s) INSPECT CABIN BLEED AIR FLAPPER CHECK VALVE 21.030 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 100B03 (s) INSPECT COCKPIT BLEED AIR FLAPPER CHECK VALVE 21.020 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 100B14 VISUALLY INSPECT CABIN BLEED AIR FLAPPER CHECK VALVE REF: MOS HRS/MSC AFL 6000 24-APR-2003 0 0 6000 See Workcard 3546.2 (+20) +20 6020 100B15 VISUALLY INSPECT COCKPIT BLEED AIR FLAPPER CHECK VALVE REF: MOS HRS/MSC AFL 6000 24-APR-2003 0 0 6000 See Workcard 3546.2 (+20) +20 6020 PKG 200A03 (s) INSPECT FORWARD ENVIROMENTAL SYSTEM PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard PKG 200B03 (s) INSPECT LEFT HAND SECONDARY OUTFLOW VALVE 21.195 390-384025-0003 PKG 6 387A REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 8 Of 107 PKG + 200B03 (s) INSPECT RIGHT HAND PRIMARY OUTFLOW VALVE 21.190 390-384024-0007 PKG 6 546A REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG 200B10 (s) INSPECT CABIN EVAPORATOR BLOWER - AFT - MOTOR BRUSHES PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 GENERIC CMM PKG + 200D02 (s) INSPECT COCKPIT BLEED AIR DUCT 21.050 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 210001 LEFT HAND HEAT EXCHANGER 21.290 390-385033-0001 250 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 210002 RIGHT HAND HEAT EXCHANGER 21.290 390-385033-0001 230 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 211101 NO. 1 BLEED AIR CONTROL UNIT 21.300 35009-20 D1566 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 GENERIC NO REF 211102 NO. 2 BLEED AIR CONTROL UNIT 21.300 35009-20 D1586 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 GENERIC NO REF 211111 LEFT HAND TEMPERATURE SENSOR 21.310 1300460-1 423 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 211112 RIGHT HAND TEMPERATURE SENSOR 21.310 1300460-1 304 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 212001 3-WAY SOLENOID VALVE 21.320 5303-23 0337 REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 See Workcard 212011 LEFT HAND BI-LEVEL FLOW CONTROL VALVE 21.060 390-385035-0003 0357 REF: MOS HRS/MSC AFL O/C TSO:0 TSO:0 TSO:0 17-JAN-2009 1404.5 1156 See Workcard TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 9 Of 107 212012 RIGHT HAND BI-LEVEL FLOW CONTROL VALVE 21.060 390-385035-0003 0328 REF: MOS HRS/MSC AFL O/C TSO:0 TSO:0 TSO:0 10-AUG-2007 See Workcard 212021 THREE WAY VALVE 21.330 390-385017-0005 0107 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 213021 PRESSURIZATION CONTROLLER 21.340 390-385014-0001 234 REF: MOS HRS/MSC AFL O/C 28-SEP-2004 339.1 249 See Workcard 213031 MATRIX SWITCH 21.350 851-38606-002 0058 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 GENERIC NO REF 213041 BAROMETRIC PRESSURE SWITCH 21.360 101-384028-23 4638 REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 18-SEP-2014 2355.1 1855 See Workcard 215025 COMPRESSOR DRIVE MODULE 21.370 390-385026-0003 110 REF: MOS HRS/MSC AFL O/C TSO:1 TSO:0 TSO:0 16-MAY-2011 GENERIC NO REF 215030 AIR CONDITIONING COMPRESSOR 21.160 PN SN-UNKNOWN REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 See Workcard 215040 AIR CONDITION CONDENSER 21.180 PN SN-UNKNOWN REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 See Workcard 215043 RIGHT HAND PRIMARY OUTFLOW VALVE 21.190 390-384024-0007 546A REF: MOS HRS/MSC AFL O/C 14-JUL-2005 567.6 419 See Workcard 215044 LEFT HAND SECONDARY OUTFLOW VALVE 21.195 390-384025-0003 387A REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 215051 SOFT START MODULE 21.380 1260470-3 108/108 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 10 Of 107 215061 COCKPIT REFRIGERANT SOLENOID VALVE 21.390 390-385027-0001 201 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 215065 CABIN REFRIGERANT SOLENOID VALVE 21.395 390-385027-0001 0248 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 215071 FLIGHT DECK EVAPORATOR COIL 21.115 390-385020-0001 148 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 215091 CABIN COIL EVAPORATOR 21.125 390-385023-0001 209 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 215095 EVAPORATOR 21.135 PN SN-UNKNOWN REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 GENERIC NO REF 216001 NO. 1 TEMPERATURE CONTROLLER 21.400 390-385011-0009 304 REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 See Workcard 216002 NO. 2 TEMPERATURE CONTROLLER 21.400 390-385011-0009 318 REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 See Workcard 216011 LEFT HAND TEMPERATURE SWITCH 21.410 1173T0777-01 0162 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 216012 RIGHT HAND TEMPERATURE SWITCH 21.410 1173T0777-01 0153 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 216021 COCKPIT (555750) VENT DUCT TEMPERATURE SENSOR 21.420 1300460-3 424 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 216022 CABIN VENT DUCT TEMPERATURE SENSOR 21.430 PN SN-UNKNOWN REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 See Workcard TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 11 Of 107 216032 COCKPIT TEMPERATURE SENSOR 21.440 1300440-1 561 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 GENERIC NO REF 216033 CABIN TEMPERATURE SENSOR 21.440 1300580-1 200 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 216041 BAGGAGE HEAT CONTROLLER 21.450 390-385005-0003 E00065645 REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 See Workcard 216045 BAGGAGE HEAT BLOWER 21.460 390-385005-0001 100250953 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 216051 NO. 1 MODULATING VALVE 21.470 390-385016-0001 144 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 216052 NO. 2 MODULATING VALVE 21.470 390-385016-0001 327 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard PKG + 300A13 (s) INSPECT AFT FUSELAGE BAGGAGE COMPARTMENT HEAT SYSTEM 21.210 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 300A14 (s) INSPECT COCKPIT BLEED AIR FLAPPER CHECK VALVE 21.040 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 300A18 (s) INSPECT RAM AIR DORSAL CHECK VALVES 21.220 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 300A19 (s) INSPECT BLOWER DUCT CHECK VALVES 21.230 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 300A20 (s) INSPECT BLEED AIR HEAT EXCHANGERS 21.240 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 12 Of 107 PKG + 300A21 (s) INSPECT BLEED AIR HEAT EXCHANGER BLOWER MOTOR 21.250 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 + 300A42 INSPECT AIR CONDITIONING COMPRESSOR MOTOR AIR CONDITIONING COMPRESSOR MOTOR 21.170 PN SN-UNKNOWN REF: MOS HRS/MSC AFL 18-SEP-2014 2355.1 1855 See Workcard ACH 600 202.5 802.5 231.78 300A46 INSPECT AIR CONDITIONING CONDENSER BLOWER MOTOR AIR CONDITIONING CONDENSER BLOWER MOTOR BRUSHES 21.480 390-385043-0003 217 REF: MOS HRS/MSC AFL 18-SEP-2014 2355.1 1855 See Workcard ACH 1200 202.5 1402.5 831.78 300A47 INSPECT BLEED AIR HEAT EXCHANGER BLOWER MOTOR BRUSHES 21.490 REF: MOS HRS/MSC AFL 3600 18-SEP-2014 2355.1 1855 5955.1 See Workcard 3501.3 (+20) +20 5975.1 PKG + OPS03 (s) OPERATIONAL TEST CABIN ALTITUDE HIGH SWITCH 21.080 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 AIRWORTHINESS OPS04 FUNCTIONAL TEST LEFT HAND SECONDARY OUTFLOW VALVE 21.195 390-384025-0003 387A REF: MOS HRS/MSC AFL 800 18-SEP-2014 2355.1 1855 3155.1 See Workcard 701.3 (+20) +20/-20 3175.1 + AIRWORTHINESS OPS04 FUNCTIONAL TEST RIGHT HAND PRIMARY OUTFLOW VALVE 21.190 390-384024-0007 546A REF: MOS HRS/MSC AFL 800 18-SEP-2014 2355.1 1855 3155.1 See Workcard 701.3 (+20) +20/-20 3175.1 + SPC17 CHANGE FORWARD ENVIRONMENTAL SYSTEM EVAPORATOR FILTER AND CHECK DRAIN 21.130 REF: MOS HRS/MSC AFL 200 18-SEP-2014 2355.1 1855 2555.1 See Workcard 101.3 (+20) +20 2575.1 + SPC18 CHANGE AFT ENVIRONMENTAL SYSTEM EVAPORATOR FILTER 21.150 REF: MOS HRS/MSC AFL 200 18-SEP-2014 2355.1 1855 2555.1 See Workcard 101.3 (+20) +20 2575.1 OVERHAUL TBO09 FORWARD COCKPIT EVAPORATOR BLOWER 21.110 BC80G-5 157 REF: MOS HRS/MSC AFL 1600 TSO:0 TSO:0 TSO:0 02-JUL-2013 2251.8 3851.8 See Workcard 1398 TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 13 Of 107 OVERHAUL TBO11 AFT CABIN EVAPORATOR BLOWER 21.120 390-385024-0005 143 REF: MOS HRS/MSC AFL 1600 TSO:0 TSO:0 TSO:0 02-JUL-2013 2251.8 3851.8 GENERIC CMM 1398 OVERHAUL TBO13 AIR CONDITIONING CONDENSER BLOWER MOTOR 21.200 390-385043-0003 217 REF: MOS HRS/MSC AFL TSN:0 TSO:0 08-JAN-2004 AMM IPC 21-50-20-01 ACH 2400 TSN:0 158.8 2558.8 1988.08 OVERHAUL TBO15 BLEED AIR HEAT EXCHANGER BLOWER MOTOR 21.250 390-385034-0007 109 REF: MOS HRS/MSC AFL 7200 TSO:0 TSO:0 TSO:0 25-SEP-2009 1596.1 1296 8796.1 See Workcard 6342.3 OVERHAUL TBO18 AIR CONDITIONING COMPRESSOR MOTOR 21.170 PN SN-UNKNOWN REF: MOS HRS/MSC AFL TSN:0 TSN:0 TSN:0 AMM IPC 21-50-10-01 ACH 2000 TSN:0 0 2000 1429.28 AUTO FLIGHT 22 CHAPTER 221001 ELEVATOR SERVO MOUNT 22.010 622-5735-004 H91B REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 GENERIC NO REF 221002 ELEVATOR SERVO 22.010 822-1168-001 12JLTY REF: MOS HRS/MSC AFL O/C 30-APR-2004 230.3 140 See Workcard 221011 RUDDER SERVO MOUNT 22.020 622-5735-004 J9GG REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 GENERIC NO REF 221012 RUDDER SERVO 22.020 822-1168-002 1GDJR REF: MOS HRS/MSC AFL O/C TSO:5 TSO:0 TSO:0 21-AUG-2015 2419.6 1924 See Workcard 221021 AILERON SERVO MOUNT 22.030 622-5735-004 RB-62 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 GENERIC NO REF 221022 AILERON SERVO 22.030 822-1168-002 NHTF REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 14 Of 107 221051 AUXILIARY ROLL TRIM CONTROLLER 22.040 76758-3 1039 REF: MOS HRS/MSC AFL O/C 14-OCT-2005 619.9 See Workcard COMMUNICATIONS 23 CHAPTER 231001 UPPER VHF COMM ANTENNA 23.020 PN SN-UNKNOWN REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 See Workcard 231002 LOWER VHF COMM ANTENNA 23.020 PN SN-UNKNOWN REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 See Workcard 231011 NO. 1 VHF COMM TRANSCEIVER 23.030 822-1115-001 10XMT REF: MOS HRS/MSC AFL O/C TSO:2 TSO:0 TSO:0 21-AUG-2015 2419.6 1924 See Workcard 231012 NO. 2 VHF COMM TRANSCEIVER 23.030 822-1115-001 12LGL REF: MOS HRS/MSC AFL O/C TSO:0 TSO:0 TSO:0 21-AUG-2015 2419.6 1924 See Workcard 231015 HF RECEIVER 23.110 PN SN-UNKNOWN REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 See Workcard 231021 CTL-23 CONTROL 23.040 822-1121-001 LH5W REF: MOS HRS/MSC AFL O/C 21-AUG-2015 2419.6 1924 See Workcard 231101 HF (KCU 951) CONTROLLER 23.130 PN SN-UNKNOWN REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 See Workcard 231301 RADIO TELEPHONE ANTENNA 23.050 PN SN-UNKNOWN REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 See Workcard 231311 FLITEPHONE 23.060 PN SN-UNKNOWN REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 See Workcard 231313 NO. 1 DATA ACQUISITION UNIT 23.100 PN SN-UNKNOWN REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 See Workcard TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 15 Of 107 231314 NO. 2 DATA ACQUISITION UNIT 23.100 PN SN-UNKNOWN REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 See Workcard 235001 NO. 1 AUDIO AMP 23.070 DB438 3859 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 235002 NO. 2 AUDIO AMP 23.070 DB438 3860 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 235011 PA AMP 23.080 MODEL 240 1741 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 235013 HF POWER (KAC 952) AMP 23.120 PN SN-UNKNOWN REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 See Workcard 237001 COCKPIT VOICE RECORDER 23.010 PN SN-UNKNOWN REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 See Workcard 237014 UNDERWATER LOCATOR BEACON 23.010 DK-120 DP5421 REF: MOS HRS/MSC AFL O/C TSO:0 TSO:0 TSO:0 17-JAN-2009 1404.5 1156 See Workcard 24-MAR-2017 + 237016 TEST UNDERWATER LOCATOR BEACON BATTERY AND UNIT 23.010 REF: MOS HRS/MSC AFL 24 24-MAR-2015 2412.6 1915 See Workcard 536 d (+30) +30d/-30d 23-APR-2017 24-MAR-2021 MANDATORY 237017 REPLACE UNDERWATER LOCATOR BEACON BATTERY 23.010 DK-120 DP5421 REF: MOS HRS/MSC AFL 72 24-MAR-2015 2412.6 1915 See Workcard 1997 d (+30) +30d/-30d 23-APR-2021 237021 IMPACT SWITCH 23.090 6895D2X2.5-2.5 3445 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard ELECTRICAL POWER 24 CHAPTER 240001 STATIC INVERTER 24.090 SS50 940 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 GENERIC NO REF TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 16 Of 107 243001 LEFT HAND GENERATOR CONTROL UNIT 24.110 390-384005-0007 138 REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 See Workcard 243002 RIGHT HAND GENERATOR CONTROL UNIT 24.110 390-384005-0009 210 REF: MOS HRS/MSC AFL O/C 27-OCT-2005 639.6 See Workcard 243003 LEFT HAND GROUND FAULT TRANSFORMER 24.150 76394-1 2390 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 243005 RIGHT HAND GROUND FAULT TRANSFORMER 24.150 76394-1 2393 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 245001 DC/AC INVERTER 24.120 AC1500-393 0041 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 GENERIC NO REF 246001 NO. 1 AC/DC INVERTER 24.130 AC100-389-2 0236 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 GENERIC NO REF 246002 NO. 2 AC/DC INVERTER 24.130 AC100-389-2 0192 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 GENERIC NO REF 246003 NO. 3 AC/DC INVERTER 24.130 AC100-389-2 0201 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 GENERIC NO REF PKG + 300A22 (s) INSPECT MAIN BATTERY 24.050 RG-380E/44K PKG 6 40640391 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 300A23 (s) INSPECT GROUNDING POINT OF LEFT/RIGHT GENERATORS BATTERY AND EXTERNAL POWER 24.015 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 300A24 (s) INSPECT MAIN POWER BOX 24.080 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 17 Of 107 PKG + 400A02 (s) INSPECT NO. 1 ENGINE STARTER/GENERATOR 24.020 390-389001-0001 PKG 6 281AB REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 400A03 INSPECT NO. 1 ENGINE STARTER/GENERATOR BRUSHES REF: MOS HRS/MSC AFL 800 18-SEP-2014 2355.1 1855 3155.1 See Workcard 701.3 (+20) +20 3175.1 PKG + 400B02 (s) INSPECT NO. 2 ENGINE STARTER/GENERATOR 24.030 390-389001-0001 PKG 6 601AB REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 400B03 INSPECT NO. 2 ENGINE STARTER/GENERATOR BRUSHES REF: MOS HRS/MSC AFL 800 18-SEP-2014 2355.1 1855 3155.1 See Workcard 701.3 (+20) +20 3175.1 + AIRWORTHINESS OPS05 OPERATIONAL TEST ELECTRICAL SYSTEM LATENT FAILURE 24.040 REF: MOS HRS/MSC AFL 2400 18-SEP-2014 2355.1 1855 4755.1 See Workcard 2301.3 (+200) +200 4955.1 SPC10 PERFORM LEVEL TEST OF STANDBY POWER SUPPLY 24.160 REF: MOS HRS/MSC AFL A/R 24-APR-2003 0 0 GENERIC CMM 18-SEP-2015 SPC13 ENERGY LEVEL TEST STANDBY BATTERY STANDBY POWER SUPPLY BATTERY 24.140 390-384027-0001 1430 REF: MOS HRS/MSC AFL 12 18-SEP-2014 2355.1 1855 See Workcard TOL (+13 d) +30d/-30d 18-OCT-2015 21-NOV-2015 + SPC22 CAPACITY CHECK MAIN BATTERY 24.050 RG-380E/44K 40640391 REF: MOS HRS/MSC AFL 3 21-AUG-2015 2419.6 1924 GENERIC CMM 47 d OVERHAUL TBO16 NO. 1 ENGINE STARTER/GENERATOR 24.020 390-389001-0001 281AB REF: MOS HRS/MSC AFL 1400 TSO:0 TSO:0 TSO:0 29-JUL-2009 1556.9 1269 2956.9 GENERIC NO REF 503.1 OVERHAUL TBO16 NO. 2 ENGINE STARTER/GENERATOR 24.030 390-389001-0001 601AB REF: MOS HRS/MSC AFL 1400 TSO:0 TSO:0 TSO:0 29-JUL-2009 1556.9 1269 2956.9 GENERIC NO REF 503.1 18-SEP-2018 REPLACE TBO17 MAIN BATTERY 24.050 RG-380E/44K 40640391 REF: MOS HRS/MSC AFL 48 TSN:0 TSN:0 TSN:0 18-SEP-2014 2355.1 1855 See Workcard 1079 d TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 18 Of 107 19-AUG-2015 TBO19 STANDBY BATTERY 24.100 390-384027-0001 1430 REF: MOS HRS/MSC AFL 48 TSN:2 TSR:2 TSR:0 TSR:0 13-OCT-2011 1980.1 1589 See Workcard 6 OVD EQUIPMENT/FURNISHINGS 25 CHAPTER PKG + 200A08 (s) INSPECT FLIGHT CREW SEATS 25.010 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 200B05 (s) INSPECT SEAT ATTACHMENT 25.030 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 256001 EMERGENCY LOCATOR TRANSMITTER 25.040 453-5000-366 00539 REF: MOS HRS/MSC AFL O/C See Workcard 256011 ELT BLADE ANTENNA 25.080 110-337 2030962 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 GENERIC NO REF 256021 EMERGENCY EXIT PULL HANDLE 25.090 PN SN-UNKNOWN REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 GENERIC NO REF 256041 PILOT LIFE VEST 25.110 P0201-105 B83623 REF: MOS HRS/MSC AFL O/C 21-AUG-2015 2419.6 1924 GENERIC NO REF 256042 COPILOT LIFE VEST 25.110 P0201-105 B83702 REF: MOS HRS/MSC AFL O/C 21-AUG-2015 2419.6 1924 GENERIC NO REF 256051 NO. 1 LIFE VEST 25.120 P0201-105 B83538 REF: MOS HRS/MSC AFL O/C 21-AUG-2015 2419.6 1924 GENERIC NO REF 256052 NO. 2 LIFE VEST 25.120 P0201-105 B83495 REF: MOS HRS/MSC AFL O/C 21-AUG-2015 2419.6 1924 GENERIC NO REF 256053 NO. 3 LIFE VEST 25.130 P0201-105 B83616 REF: MOS HRS/MSC AFL O/C 21-AUG-2015 2419.6 1924 GENERIC NO REF TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 19 Of 107 256054 NO. 4 LIFE VEST 25.130 P0201-105 B83641 REF: MOS HRS/MSC AFL O/C 21-AUG-2015 2419.6 1924 GENERIC NO REF 256055 NO. 5 LIFE VEST 25.140 P0201-105 B83547 REF: MOS HRS/MSC AFL O/C 21-AUG-2015 2419.6 1924 GENERIC NO REF 256056 NO. 6 LIFE VEST 25.140 P0201-105 B83668 REF: MOS HRS/MSC AFL O/C 21-AUG-2015 2419.6 1924 GENERIC NO REF 257021 MUFFIN FAN 25.150 PN SN-UNKNOWN REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 GENERIC NO REF 01-SEP-2016 MANDATORY SPC02 REPLACE EMERGENCY LOCATOR TRANSMITTER BATTERY 25.040 453-5000-366 00539 REF: MOS HRS/MSC AFL DUE 13-OCT-2011 1980.1 1589 See Workcard 332 d M 01-JUL-2016 SPC04 RECERTIFY COPILOT LIFE VEST GA-12 25.110 P0201-105 B83702 REF: MOS HRS/MSC AFL 12 21-AUG-2015 2419.6 1924 See Workcard -51 270 d (+30) +30d/-30d 31-JUL-2016 01-JUL-2016 SPC04 RECERTIFY NO. 1 LIFE VEST GA-12 25.120 P0201-105 B83538 REF: MOS HRS/MSC AFL 12 21-AUG-2015 2419.6 1924 See Workcard -51 270 d (+30) +30d/-30d 31-JUL-2016 01-JUL-2016 SPC04 RECERTIFY NO. 2 LIFE VEST GA-12 25.120 P0201-105 B83495 REF: MOS HRS/MSC AFL 12 21-AUG-2015 2419.6 1924 See Workcard -51 270 d (+30) +30d/-30d 31-JUL-2016 01-JUL-2016 SPC04 RECERTIFY NO. 3 LIFE VEST GA-12 25.130 P0201-105 B83616 REF: MOS HRS/MSC AFL 12 21-AUG-2015 2419.6 1924 See Workcard -51 270 d (+30) +30d/-30d 31-JUL-2016 01-JUL-2016 SPC04 RECERTIFY NO. 4 LIFE VEST GA-12 25.130 P0201-105 B83641 REF: MOS HRS/MSC AFL 12 21-AUG-2015 2419.6 1924 See Workcard -51 270 d (+30) +30d/-30d 31-JUL-2016 01-JUL-2016 SPC04 RECERTIFY NO. 5 LIFE VEST GA-12 25.140 P0201-105 B83547 REF: MOS HRS/MSC AFL 12 21-AUG-2015 2419.6 1924 See Workcard -51 270 d (+30) +30d/-30d 31-JUL-2016 TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 20 Of 107 01-JUL-2016 SPC04 RECERTIFY NO. 6 LIFE VEST GA-12 25.140 P0201-105 B83668 REF: MOS HRS/MSC AFL 12 21-AUG-2015 2419.6 1924 See Workcard -51 270 d (+30) +30d/-30d 31-JUL-2016 01-JUL-2016 SPC04 RECERTIFY PILOT LIFE VEST GA-12 25.110 P0201-105 B83623 REF: MOS HRS/MSC AFL 12 21-AUG-2015 2419.6 1924 See Workcard -51 270 d (+30) +30d/-30d 31-JUL-2016 SPC06 RECERTIFY COPILOT LIFE VEST 25.110 P0201-105 B83702 REF: MOS HRS/MSC AFL N/A See Workcard SPC06 RECERTIFY NO. 1 LIFE VEST 25.120 P0201-105 B83538 REF: MOS HRS/MSC AFL N/A See Workcard SPC06 RECERTIFY NO. 2 LIFE VEST 25.120 P0201-105 B83495 REF: MOS HRS/MSC AFL N/A See Workcard SPC06 RECERTIFY NO. 3 LIFE VEST 25.130 P0201-105 B83616 REF: MOS HRS/MSC AFL N/A See Workcard SPC06 RECERTIFY NO. 4 LIFE VEST 25.130 P0201-105 B83641 REF: MOS HRS/MSC AFL N/A See Workcard SPC06 RECERTIFY NO. 5 LIFE VEST 25.140 P0201-105 B83547 REF: MOS HRS/MSC AFL N/A See Workcard SPC06 RECERTIFY NO. 6 LIFE VEST 25.140 P0201-105 B83668 REF: MOS HRS/MSC AFL N/A See Workcard SPC06 RECERTIFY PILOT LIFE VEST 25.110 P0201-105 B83623 REF: MOS HRS/MSC AFL N/A See Workcard SPC07 (s) CHECK FIRST AID KIT (WITH JAROPS EQUIPMENT INSTALLED) 25.070 REF: MOS HRS/MSC AFL 12 24-APR-2003 0 0 GENERIC NO REF +30d/-30d TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 21 Of 107 18-SEP-2015 + SPC15 INSPECT EMERGENCY LOCATOR TRANSMITTER FAR 91.207(D) 25.040 REF: MOS HRS/MSC AFL 12 18-SEP-2014 2355.1 1855 See Workcard OVD FIRE PROTECTION 26 CHAPTER 28-FEB-2025 + MANDATORY 200A01 HYDROSTATIC TEST PORTABLE FIRE EXTINGUISHER 26.060 C352 W-592392 REF: MOS HRS/MSC AFL 144 20-FEB-2013 2192.8 1748 See Workcard 3434 d 261001 FIRE DETECTION CONTROLLER 26.070 477-90005 0044-004 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 262001 ENGINE FIRE EXTINGUISHER 26.040 30400018-1 43163B1 REF: MOS HRS/MSC AFL O/C TSO:62 TSO:1165.3 TSO:929 13-OCT-2011 1980.1 1589 See Workcard 01-NOV-2018 LIFE LIMIT 262010 ENGINE NO. 1 FIRE EXTINGUISHER CARTRIDGE 26.040 13083-5 SN-UNKNOWN REF: MOS HRS/MSC AFL 72 27-SEP-2013 2265.9 1803 See Workcard 1123 d Manufacture Date: 01-NOV-2012 01-NOV-2018 LIFE LIMIT 262011 ENGINE NO. 2 FIRE EXTINGUISHER CARTRIDGE 26.040 13083-5 SN-UNKNOWN REF: MOS HRS/MSC AFL 72 27-SEP-2013 2265.9 1803 See Workcard 1123 d Manufacture Date: 01-NOV-2012 27-SEP-2017 + SERVICE LIFE LIMIT 262013 REPLACE ENGINE NO. 1 FIRE EXTINGUISHER CARTRIDGE (DATE OF SERVICE) 26.040 13083-5 SN-UNKNOWN REF: MOS HRS/MSC AFL 48 27-SEP-2013 See Workcard 723 d 27-SEP-2017 SERVICE LIFE LIMIT 262014 REPLACE ENGINE NO. 2 FIRE EXTINGUISHER CARTRIDGE (DATE OF SERVICE) 26.040 13083-5 SN-UNKNOWN REF: MOS HRS/MSC AFL 48 27-SEP-2013 2265.9 1803 See Workcard 723 d 262101 PORTABLE FIRE EXTINGUISHER 26.060 C352 W-592392 REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 20-FEB-2013 2192.8 1748 See Workcard + AIRWORTHINESS 300A26 INSPECT ENGINE FIRE EXTINGUISHER PLUMBING 26.040 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 3555.1 See Workcard 1101.3 (+20) +20 3575.1 TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 22 Of 107 PKG + 300A27 (s) INSPECT BLEED AIR LEAK DETECTION SENSING ELEMENTS 26.010 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 400A04 (s) INSPECT NO. 1 ENGINE FIRE DETECTION LOOP AND TUBING 26.020 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 400B04 (s) INSPECT NO. 2 ENGINE FIRE DETECTION LOOP AND TUBING 26.020 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 13-OCT-2016 + MANDATORY LIMITS01 HYDROSTATIC TEST ENGINE FIRE EXTINGUISHER 26.040 30400018-1 43163B1 REF: MOS HRS/MSC AFL 60 13-OCT-2011 1980.1 1589 GENERIC NO REF 374 d 20-FEB-2025 MANDATORY LIMITS03 HYDROSTATIC TEST PORTABLE FIRE EXTINGUISHER 26.060 C352 W-592392 REF: MOS HRS/MSC AFL 144 20-FEB-2013 GENERIC NO REF 3426 d + OPS06 OPERATIONAL TEST FIRE DETECTION CONTROLLER AND SENSOR CABLE 26.030 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 3555.1 See Workcard 1101.3 (+20) +20 3575.1 + AIRWORTHINESS OPS07 FUNCTIONAL TEST FIRE EXTINGUISHING SYSTEM 26.050 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 3555.1 See Workcard 1101.3 (+20) +20/-20 3575.1 21-AUG-2016 + MANDATORY SPC08 WEIGHT CHECK PORTABLE FIRE EXTINGUISHER 26.060 REF: MOS HRS/MSC AFL 12 21-AUG-2015 See Workcard 321 d FLIGHT CONTROLS 27 CHAPTER PKG + 100A01 (s) INSPECT FLIGHT CONTROL PULLEYS AND BRACKETS 27.160 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 100A02 (s) INSPECT FLIGHT CONTROL CABLES 27.150 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 100A03 (s) INSPECT RUDDER PEDALS 27.260 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 23 Of 107 PKG + 100B04 (s) INSPECT FLIGHT CONTROL CABLES 27.720 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 100B05 (s) INSPECT FLIGHT CONTROL PULLEYS AND BRACKETS 27.710 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 100B06 (s) CHECK AILERON CONTROL CABLES 27.030 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG 100B12 (s) CHECK ELEVATOR CONTROL CABLES 27.355 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard PKG 100B13 (s) CHECK RUDDER CONTROL CABLES 27.255 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard PKG 128A05 (s) LUBRICATE AFT PRESSURE BULKHEAD LUBRICATION POINTS 12.200 PKG 5,9 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard PKG + 200A10 (s) INSPECT CONTROL COLUMN 27.130 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 200A11 (s) INSPECT RUDDER PEDALS 27.190 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 200D03 (s) CHECK AILERON AUTOPILOT SERVO BRIDLE CABLE 27.020 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 270001 LEFT PILOT POSITION SENSOR 27.730 390-381012-0001 74431 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 270002 RIGHT CO-PILOT POSITION SENSOR 27.730 390-381012-0001 C3714 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 24 Of 107 270011 LEFT CONTROL WHEEL 27.740 390-382052-0007 0148 REF: MOS HRS/MSC AFL O/C 27-OCT-2003 122.6 28 See Workcard 270012 RIGHT CONTROL WHEEL 27.740 390-382052-0008 0122 REF: MOS HRS/MSC AFL O/C 27-OCT-2003 122.6 28 See Workcard 271001 LEFT AILERON TRIM TAB ACTUATOR 27.750 390-381009-0007 4 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 271002 RIGHT AILERON TRIM TAB ACTUATOR 27.750 390-381009-0008 50 REF: MOS HRS/MSC AFL O/C TSO:0 TSO:0 TSO:0 17-JAN-2009 1404.5 1156 See Workcard 271011 LEFT AILERON 27.760 390-130001-0019 RB-62S7#6021660 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 271012 RIGHT AILERON 27.760 390-130001-0020 RB-62S7#6024035 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 272001 RUDDER 27.250 390-630010-0001 RB-62S7#3537415 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 272005 RUDDER TRIM TAB 27.230 390-630050-0005 6020899 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 272011 RUDDER TRIM TAB ACTUATOR 27.780 390-386003-0003 0018 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 272021 LEFT INBOARD RUDDER BOOST PRESSURE TRANSDUCER 27.790 APTE320-1000-300A 6484-6A-323 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 272022 LEFT OUTBOARD RUDDER BOOST PRESSURE TRANSDUCER 27.790 APTE320-1000-300A 6484-6A-348 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 25 Of 107 272031 RIGHT INBOARD RUDDER BOOST PRESSURE TRANSDUCER 27.800 APTE320-1000-300A 6484-6A-331 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 272032 RIGHT OUTBOARD RUDDER BOOST PRESSURE TRANSDUCER 27.800 APTE320-1000-300A 6332-11-163 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 272041 VERTICAL STABILIZER ASSEMBLY 27.770 390-640010-0001 RB-62S7#3534470 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 GENERIC NO REF 273001 LEFT ELEVATOR 27.290 390-610100-0003 RB-62S7#6058222 REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 See Workcard 273002 RIGHT ELEVATOR 27.290 390-610100-0004 RB-62S7#6052688 REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 See Workcard 273011 ELEVATOR TAB GEARBOX 27.810 390-526251-0001 02230401 REF: MOS HRS/MSC AFL O/C 26-MAR-2004 193.9 140 See Workcard 273101 LEFT AOA TRANSMITTER 27.820 SLZ8060-3 AB0183 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 273102 RIGHT AOA TRANSMITTER 27.820 SLZ8060-3 AB0202 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 274001 PITCH TRIM CONTROL UNIT 27.830 390-384028-0009 2208R REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 10-NOV-2006 894.3 See Workcard 274006 UPPER YOKE SCISSOR FITTING 27.460 PN SN-UNKNOWN REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 See Workcard 274007 LOWER YOKE SCISSOR FITTING 27.470 PN SN-UNKNOWN REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 See Workcard TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 26 Of 107 274011 HORIZONTAL STABILIZER ASSEMBLY 27.840 390-620000-0001 RB-63S7#3559218 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 274020 HORIZONTAL CENTER FITTING 27.490 PN SN-UNKNOWN REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 See Workcard 274021 LEFT HORIZONTAL STABILIZER POTENTIOMETER 27.850 390-386043-0001 0215 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 274022 RIGHT HORIZONTAL STABILIZER POTENTIOMETER 27.850 390-386043-0001 0243 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 275001 FLAP POTENTIOMETER 27.860 390-381404-0003 129 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 275011 FLAP CONTROL UNIT 27.860 390-381401-0011 J0139 REF: MOS HRS/MSC AFL O/C 13-JUL-2005 555 419 See Workcard 275021 LEFT OUTBOARD FLAP ASSEMBLY 27.870 390-160002-0015 RB-62S7#8844256 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 275022 RIGHT OUTBOARD FLAP ASSEMBLY 27.870 390-160002-0016 RB-62S7#6000859 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 275023 LEFT INBOARD FLAP ASSEMBLY 27.880 390-160001-0013 RB-62S7#8827507 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 275024 RIGHT INBOARD FLAP ASSEMBLY 27.880 390-160001-0014 RB-62S7#8839309 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 275041 LEFT NO. 1 FLAP ACTUATOR 27.890 390-381402-0018 G0022 REF: MOS HRS/MSC AFL O/C 13-JUL-2005 555 419 See Workcard TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 27 Of 107 275042 LEFT NO. 2 FLAP ACTUATOR 27.890 390-381402-0019 G0121 REF: MOS HRS/MSC AFL O/C 13-JUL-2005 555 419 See Workcard 275043 LEFT NO. 3 FLAP ACTUATOR 27.890 390-381402-0017 G0191 REF: MOS HRS/MSC AFL O/C 13-JUL-2005 555 419 See Workcard 275044 LEFT NO.5 FLAP ACTUATOR 27.890 390-381403-0011 H0350 REF: MOS HRS/MSC AFL O/C 13-JUL-2005 555 419 See Workcard 275061 RIGHT NO. 1 FLAP ACTUATOR 27.900 390-381402-0017 G0285 REF: MOS HRS/MSC AFL O/C 13-JUL-2005 555 419 See Workcard 275062 RIGHT NO. 2 FLAP ACTUATOR 27.900 390-381402-0020 G0159 REF: MOS HRS/MSC AFL O/C 14-JUL-2005 567.6 419 See Workcard 275063 RIGHT NO. 3 FLAP ACTUATOR 27.900 390-381402-0018 G0171 REF: MOS HRS/MSC AFL O/C 14-JUL-2005 567.6 419 See Workcard 275064 RIGHT NO. 5 FLAP ACTUATOR 27.900 390-381403-0011 H0172 REF: MOS HRS/MSC AFL O/C 13-JUL-2005 555 419 See Workcard 276001 SPOILER CONTROL UNIT 27.910 390-384011-0013 0119 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 276011 LEFT SPOILER (ROLL CONTROL) PANEL 27.920 390-381039-0001 0129 REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 25-MAR-2008 1217 981 GENERIC NO REF 276012 RIGHT SPOILER (ROLL CONTROL) PANEL 27.920 390-381039-0002 0130 REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 25-MAR-2008 1217 981 See Workcard 276021 LEFT SPOILER SPEED BRAKE PANEL 27.930 390-381038-0001 0127 REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 25-MAR-2008 1217 981 See Workcard TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 28 Of 107 276022 RIGHT SPOILER SPEED BRAKE PANEL 27.930 390-381038-0002 0126 REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 25-MAR-2008 1217 981 See Workcard 276031 SPOILER CONTROL MODULE 27.940 390-381006-0005 0033 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 276041 LEFT UPLOCK RELEASE ACTUATOR 27.950 390-381201-0003 0138 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 276042 RIGHT UPLOCK RELEASE ACTUATOR 27.950 390-381201-0003 0063 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 276051 LEFT LIFT DUMP ACTUATOR 27.960 390-381008-0001 0089 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 276052 RIGHT LIFT DUMP ACTUATOR 27.960 390-381008-0001 0184 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 276061 LEFT BLOWDOWN ACTUATOR 27.970 390-381010-0001 0086 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 276062 RIGHT BLOWDOWN ACTUATOR 27.970 390-381010-0001 0025 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 276071 LEFT ROLL SPOILER ACTUATOR 27.980 390-381007-0003 0161 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 276072 RIGHT ROLL SPOILER ACTUATOR 27.980 390-381007-0003 0159 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 276081 LEFT SPOILER POSITION SENSOR 27.990 390-381011-0005 C4462 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 29 Of 107 276082 RIGHT SPOILER POSITION SENSOR 27.990 390-381011-0005 RB-62 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 276091 LEFT SPOILER (LIFT DUMP) PANEL 27.995 390-381037-0003 0151 REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 25-MAR-2008 1217 981 See Workcard 276092 RIGHT SPOILER (LIFT DUMP) PANEL 27.995 390-130003-0020 0150 REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 25-MAR-2008 1217 981 See Workcard 18-SEP-2018 + AIRWORTHINESS 300A02 VISUAL CHECK ELEVATOR AND ATTACHMENT STRUCTURE 27.300 REF: MOS HRS/MSC AFL 48 1200 18-SEP-2014 2355.1 1855 3555.1 See Workcard 1079 d 1101.3 (+30) (+20) +30d/-30d +20/-20 18-OCT-2018 3575.1 18-SEP-2018 + 300A04 VISUAL CHECK LOWER YOKE SCISSOR FITTING 27.470 PN SN-UNKNOWN REF: MOS HRS/MSC AFL 48 1200 18-SEP-2014 2355.1 1855 3555.1 1079 d 1101.3 (+30) (+20) +30d/-30d +20/-20 18-OCT-2018 3575.1 18-SEP-2018 + AIRWORTHINESS 300A04 VISUAL CHECK UPPER YOKE SCISSOR FITTING 27.460 PN SN-UNKNOWN REF: MOS HRS/MSC AFL 48 1200 18-SEP-2014 2355.1 1855 3555.1 1079 d 1101.3 (+30) (+20) +30d/-30d +20/-20 18-OCT-2018 3575.1 + AIRWORTHINESS 300A05 INSPECT PITCH TRIM ACTUATOR, ATTACHMENT BOLTS, UPPER BUSHING AND STRUCTURE 27.480 REF: MOS HRS/MSC AFL 400 18-SEP-2014 2355.1 1855 2755.1 See Workcard 301.3 (+20) +20/-20 2775.1 18-SEP-2018 + AIRWORTHINESS 300A06 VISUAL CHECK RUDDER ATTACHMENT STRUCTURE 27.250 REF: MOS HRS/MSC AFL 48 1200 18-SEP-2014 2355.1 1855 3555.1 See Workcard 1079 d 1101.3 (+30) (+20) +30d/-30d +20/-20 18-OCT-2018 3575.1 18-SEP-2018 + AIRWORTHINESS 300A09 VISUAL/EDDY CURRENT INSPECT CENTER HORIZONTAL FITTING 27.500 REF: MOS HRS/MSC AFL 48 1200 18-SEP-2014 2355.1 1855 3555.1 See Workcard 1079 d 1101.3 (+30) (+20) +30d/-30d +20/-20 18-OCT-2018 3575.1 PKG + 300A28 (s) INSPECT RUDDER/ELEVATOR FLIGHT CONTROL CABLES 27.240 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 300B02 (s) INSPECT RUDDER 27.250 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 30 Of 107 PKG + 300B03 (s) INSPECT RUDDER TRIM TAB 27.230 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 300B04 (s) INSPECT RUDDER TRIM ACTUATOR AND LINKAGE 27.210 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 300B05 (s) INSPECT RUDDER TRIM TAB HINGE 27.230 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 300B06 (s) INSPECT RUDDER HINGES 27.180 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 300B07 (s) INSPECT RUDDER AUTOPILOT SERVO AND BRIDLE CABLE 27.170 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 300B08 (s) INSPECT RUDDER QUADRANT, BELLCRANK, STOP BOLTS, TORQUE TUBE, RUDDER COUNTER BALANCE AND CENTERING SPRING 27.200 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 300B09 (s) PERFORM RUDDER TRIM TAB FREEPLAY INSPECTION 27.220 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 300B10 (s) INSPECT ELEVATOR AUTOPILOT SERVO AND BRIDLE CABLES 27.310 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 300B11 (s) INSPECT ELEVATOR CABLES 27.320 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 300B12 (s) INSPECT ELEVATOR TRIM TAB SYSTEM, ELEVATOR QUADRANT, PUSHROD, CONNECTING BOLTS, AND STOP BOLTS 27.330 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 300B13 (s) INSPECT VERTICAL STABILIZER FRONT AND REAR SPAR ATTACHMENT 55.020 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 31 Of 107 PKG 300B17 (s) INSPECT RUDDER CABLE TENSION PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard PKG + 300C02 (s) INSPECT ELEVATOR CONTROL LINKAGE 27.340 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 + AIRWORTHINESS 300C03 INSPECT PITCH TRIM ACTUATOR SYSTEM, PITCHTRIM ACTUATOR, ATTACHMENT BOLTS, UPPER BUSHINGS, AND STRUCTURE 27.450 REF: MOS HRS/MSC AFL 400 18-SEP-2014 2355.1 1855 2755.1 See Workcard 301.3 (+20) +20/-20 2775.1 PKG + 300C04 (s) INSPECT ELEVATOR 27.350 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 300C05 (s) INSPECT ELEVATOR HINGES AND HINGE BOLTS 27.360 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 300C06 (s) INSPECT ELEVATOR TRIM TAB SYSTEM - ELEVATOR TRIM TABS AND HINGES 27.370 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 + AIRWORTHINESS 300C07 VISUAL INSPECT/OPERATIONAL CHECK ELEVATOR TRIM TAB SYSTEM 27.380 REF: MOS HRS/MSC AFL 400 18-SEP-2014 2355.1 1855 2755.1 See Workcard 301.3 (+20) +20/-20 2775.1 PKG + 300C09 (s) INSPECT ELEVATOR TRIM TAB SYSTEM - ELEVATOR TRIM TAB GEAR BOXES 27.390 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 300C10 (s) INSPECT ELEVATOR TRIM TAB SYSTEM - ELEVATOR TRIM TAB JACK SCREW 27.400 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 300C11 (s) INSPECT ELEVATOR TRIM TAB JACK SCREW FLEX SHAFT 27.410 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 300C12 (s) VISUALLY CHECK AFT PIVOT FITTING ASSEMBLY 27.520 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 +20/-20 TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 32 Of 107 PKG + 300C17 (s) INSPECT HORIZONTAL ATTACHMENT PIN 27.530 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 +20/-20 PKG + 500C01 (s) INSPECT LEFT WING FLAP DOORS (540LL, 540NL, 230HL) 27.570 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 500C03 (s) INSPECT LEFT WING SPOILER HYDRAULIC LINES 27.640 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 500C04 (s) INSPECT LEFT WING AILERON CABLES 27.060 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 500C06 (s) INSPECT LEFT WING AILERON AUTOPILOT SERVO AND CABLE 27.080 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 500C08 (s) INSPECT LEFT WING AILERON TRIM TAB 27.090 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 500C09 (s) INSPECT LEFT WING AILERON HINGES AND ATTACH POINTS 27.100 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 + AIRWORTHINESS 500C10 INSPECT LEFT WING AILERON TRIM TAB SYSTEM - AILERON TRIM TAB 27.120 REF: MOS HRS/MSC AFL 3600 24-APR-2003 0 0 3600 See Workcard 1146.2 (+200) +200 3800 + AIRWORTHINESS 500C11 INSPECT LEFT WING AILERON TRIM TAB SYSTEM - AILERON TRIM ACTUATOR 27.140 REF: MOS HRS/MSC AFL 3600 24-APR-2003 0 0 3600 See Workcard 1146.2 (+200) +200 3800 PKG + 500C12 (s) INSPECT LEFT WING AILERON DRY BAY (530LL) 27.070 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 500C13 (s) INSPECT LEFT WING FLAP 27.580 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 33 Of 107 + AIRWORTHINESS 500C15 INSPECT LEFT WING FLAP ACTUATOR ATTACHMENTS - FLAP ACTUATORS 27.590 PKG 6 REF: MOS HRS/MSC AFL 200 18-SEP-2014 2355.1 1855 2555.1 See Workcard 101.3 (+20) +20/-20 2575.1 PKG + 500C16 (s) INSPECT LEFT WING FLAP ACTUATOR WIRING 27.600 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 500C17 (s) INSPECT LEFT WING FLAP ROLLERS 27.610 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 500C19 (s) INSPECT LEFT WING SPOLIERS 27.650 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 500C20 (s) INSPECT LEFT WING SPOILER HINGES 27.660 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 500C21 (s) INSPECT LEFT WING SPOILER DRY BAY (530EL) 27.680 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 500C22 (s) INSPECT LEFT WING SPOILER ACTUATOR 27.700 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 500C23 (s) INSPECT LEFT WING SPOILER BLOWDOWN ACTUATOR 27.670 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard + AIRWORTHINESS 500C24 INSPECT LEFT WING LIFT DUMP ACTUATOR 27.690 REF: MOS HRS/MSC AFL 1000 13-OCT-2011 1980.1 1589 3000 See Workcard 19.9 546.2 (+20) +20/-20 3020 PKG + 600C01 (s) INSPECT RIGHT WING FLAP DOORS (640LL, 640NL, 230KR) 27.570 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 600C03 (s) INSPECT RIGHT WING SPOILER HYDRAULIC LINES 27.640 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 34 Of 107 PKG + 600C04 (s) INSPECT RIGHT WING AILERON CABLES 27.060 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 + 600C07 INSPECT RIGHT WING AILERON TRIM TAB SYSTEM 27.110 REF: MOS HRS/MSC AFL 400 18-SEP-2014 2355.1 1855 2755.1 See Workcard 301.3 (+20) +20 2775.1 PKG + 600C08 (s) INSPECT RIGHT WING AILERON TRIM TAB 27.090 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 600C09 (s) INSPECT RIGHT WING AILERON HINGES AND ATTACH POINTS 27.100 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 + AIRWORTHINESS 600C10 INSPECT RIGHT WING AILERON TRIM TAB SYSTEM - AILERON TRIM TAB 27.120 REF: MOS HRS/MSC AFL 3600 24-APR-2003 0 0 3600 See Workcard 1146.2 (+200) +200 3800 + AIRWORTHINESS 600C11 INSPECT RIGHT WING AILERON TRIM TAB SYSTEM - AILERON TRIM ACTUATOR 27.140 REF: MOS HRS/MSC AFL 3600 24-APR-2003 0 0 3600 See Workcard 1146.2 (+200) +200 3800 PKG + 600C12 (s) INSPECT RIGHT WING AILERON DRY BAY (630LL) 27.070 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 600C13 (s) INSPECT RIGHT WING FLAP 27.580 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 + AIRWORTHINESS 600C15 INSPECT RIGHT WING FLAP ACTUATOR ATTACHMENTS - FLAP ACTUATORS 27.590 REF: MOS HRS/MSC AFL 200 18-SEP-2014 2355.1 1855 2555.1 See Workcard 101.3 (+20) +20/-20 2575.1 PKG + 600C16 (s) INSPECT RIGHT WING FLAP ACTUATOR WIRING 27.600 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 600C17 (s) INSPECT RIGHT WING FLAP ROLLERS 27.610 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 35 Of 107 PKG + 600C18 (s) INSPECT RIGHT WING FLAP POSITION TRANSMITTER 27.620 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 600C19 (s) INSPECT RIGHT WING SPOILERS 27.650 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 600C20 (s) INSPECT RIGHT WING SPOILER HINGES 27.660 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 600C21 (s) INSPECT RIGHT WING SPOILER DRY BAY (630EL) 27.680 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 600C22 (s) INSPECT RIGHT WING SPOILER ACTUATOR 27.700 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 600C23 (s) INSPECT RIGHT WING SPOILER BLOWDOWN ACTUATOR 27.670 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard + AIRWORTHINESS 600C24 INSPECT RIGHT WING LIFT DUMP ACTUATOR 27.690 REF: MOS HRS/MSC AFL 1000 13-OCT-2011 1980.1 1589 3000 See Workcard 19.9 546.2 (+20) +20/-20 3020 MANDATORY LIMITS07 PITCH TRIM ACTUATOR 27.440 DL4256M1MOD2 0202 REF: MOS HRS/MSC AFL 6000 TSO:0 TSO:0 TSO:0 04-SEP-2007 1072.2 866 7072.2 See Workcard 4618.4 PKG + OPS08 (s) ADJUSTMENT/CHECK AILERON SYSTEM 27.010 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + OPS09 (s) FUNCTIONAL TEST ROLL TRIM 27.050 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + OPS10 (s) FUNCTIONAL CHECK RUDDER SYSTEM 27.040 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 36 Of 107 + AIRWORTHINESS OPS11 OPERATIONAL TEST RUDDER BOOST 27.270 REF: MOS HRS/MSC AFL 800 18-SEP-2014 2355.1 1855 3155.1 See Workcard 701.3 (+20) +20/-20 3175.1 PKG + OPS12 (s) OPERATIONAL TEST RUDDER SYSTEM 27.280 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + OPS13 (s) FUNCTIONAL TEST ELEVATOR 27.420 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG OPS14 (s) OPERATIONAL TEST G SWITCH 27.430 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + OPS15 (s) OPERATIONAL CHECK HORIZONTAL STABILIZERS NORMAL 27.550 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 + AIRWORTHINESS OPS16 OPERATIONAL TEST TAKE-OFF CONFIGURATION WARNING 27.560 REF: MOS HRS/MSC AFL 200 18-SEP-2014 2355.1 1855 2555.1 See Workcard 101.3 (+20) +20/-20 2575.1 PKG + OPS17 (s) FUNCTIONAL TEST FLAP SYSTEM 27.630 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 FUEL 28 CHAPTER PKG + 200D04 (s) REPLACE FUEL DISTRIBUTION FILTER ELEMENTS 28.070 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 281001 REFUEL/DEFUEL ADAPTER 28.110 390-389023-0001 RB-62 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 281011 PRECHECK VALVE 28.120 61618-1 RB-62 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 281021 FUEL CAP 28.130 911290-001 SN-UNKNOWN REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 29-JUL-2009 1556.9 1269 See Workcard TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 37 Of 107 281071 NO. 1 OUTBOARD CHECK VALVE 28.140 101-389011-109 0134 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 281072 NO. 2 OUTBOARD CHECK VALVE 28.140 101-389011-109 RB-62 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 281081 LEFT WING FORWARD INBOARD FLOAT CHECK VALVE 28.150 118-381002-5 159 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 281082 LEFT WING AFT INBOARD FLOAT CHECK VALVE 28.150 118-381002-5 RB-62 REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 See Workcard 281083 RIGHT WING FORWARD FLOAT VALVE 28.160 118-381002-5 530 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 281084 RIGHT WING AFT FLOAT VALVE 28.160 118-381002-5 RB-62A REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 See Workcard 281091 NO. 1 OUTBOARD FLOAT CHECK VALVE 28.170 128-389031-5 345 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 281092 NO. 2 OUTBOARD FLOAT CHECK VALVE 28.170 128-389031-5 123 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 282011 NO. 1 FUEL FILTER 28.180 45AS48014-005 P348 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 282012 NO. 2 FUEL FILTER 28.180 45AS48014-005 P343 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 282041 NO. 1 FUEL SHUTOFF VALVE 28.190 118-389005-5 10918571 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 38 Of 107 282042 NO. 2 FUEL SHUTOFF VALVE 28.190 118-389005-5 10616113 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 282051 NO. 1 FUEL BOOST PUMP 28.200 118-389006-7 10AT89 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 282052 NO. 2 FUEL BOOST PUMP 28.200 118-389006-7 10AT85 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 282061 NO. 1 MAIN TANK JET PUMP 28.210 118-389007-3 0118 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 282062 NO. 2 MAIN TANK JET PUMP 28.210 118-389007-3 0111 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 282071 NO. 1 TRANSFER JET PUMP 28.220 128-389033-7 0116 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 282072 NO. 2 TRANSFER JET PUMP 28.220 128-389033-7 0130 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 282081 LEFT REFUEL/DEFUEL VALVE ASSEMBLY 28.300 390-920128-0001 0090 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 282082 RIGHT REFUEL/DEFUEL VALVE ASSEMBLY 28.300 390-920128-0002 0063 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 282091 LEFT PILOT CUTOFF VALVE ASSEMBLY 28.310 132-389002-9 031 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 282092 RIGHT PILOT CUTOFF VALVE ASSEMBLY 28.310 132-389002-11 009 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 39 Of 107 282101 WING CROSS TRANSFER PUMP 28.090 390-389016-0005 99A REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 284001 NO. 1 FUEL QUANTITY INDICATOR 28.230 390-382032-0003 117-141 REF: MOS HRS/MSC AFL O/C 01-OCT-2004 339.1 249 See Workcard 284002 NO. 2 FUEL QUANTITY INDICATOR 28.230 390-382032-0003 155 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 284011 LEFT NO. 1 FUEL PROBE 28.240 390-389009-0013 0047-135 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 284012 LEFT NO. 2 FUEL PROBE 28.240 390-389009-0015 0042-072 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 284013 LEFT NO. 3 FUEL PROBE 28.240 390-389009-0017 0042-096 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 284014 LEFT NO. 4 FUEL PROBE 28.240 390-389009-0019 0042-032 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 284021 RIGHT NO. 1 FUEL PROBE 28.250 390-389009-0013 0044-114 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 284022 RIGHT NO. 2 FUEL PROBE 28.250 390-389009-0015 0048-155 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 284023 RIGHT NO. 3 FUEL PROBE 28.250 390-389009-0017 0042-077 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 284024 RIGHT NO. 4 FUEL PROBE 28.250 390-389009-0019 0716-005 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 40 Of 107 284041 NO. 1 LOW LEVEL SENSOR 28.260 390-389028-0003 124 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 284042 NO. 2 LOW LEVEL SENSOR 28.260 390-389028-0003 173 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 284051 NO. 1 FUEL PRESSURE SWITCH 28.270 45AS48008-015 B045976 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 284052 NO. 2 FUEL PRESSURE SWITCH 28.270 45AS48008-015 B055330 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 284061 CROSS TRANSFER FLOW SWITCH 28.280 V10F2-17 168 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 284071 LEFT PRESSURE RELIEF VALVE 28.290 132-389009-7 RB-62 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 284072 RIGHT PRESSURE RELIEF VALVE 28.290 132-389009-7 842 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard PKG + 500B02 (s) INSPECT LEFT FUEL DIVERTER VALVE (520DL) 28.080 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 500B03 (s) INSPECT LEFT FUEL VENT SYSTEM VALVES 28.030 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 500B04 (s) INSPECT LEFT FUEL VENT SYSTEM TUBES/HOSES 28.040 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 500B05 (s) INSPECT LEFT FLAME ARRESTOR (VENT LINE) 28.050 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 41 Of 107 PKG + 500B06 (s) INSPECT LEFT PRESSURE AND VACUUM RELIEF VALVE 28.060 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG 500B10 (s) INSPECT LEFT WING FUEL DRAIN VALVES 57.200 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 600B02 (s) INSPECT RIGHT FUEL DIVERTER VALVE (620DL) 28.080 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 600B03 (s) INSPECT RIGHT FUEL VENT SYSTEM VALVES 28.030 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 600B04 (s) INSPECT RIGHT FUEL VENT SYSTEM TUBES/HOSES 28.040 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 600B05 (s) INSPECT RIGHT FLAME ARRESTOR (VENT LINE) 28.050 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 600B06 (s) INSPECT RIGHT PRESSURE AND VACUUM RELIEF VALVE 28.060 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG 600B10 (s) INSPECT RIGHT WING FUEL DRAIN VALVES 57.200 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + OPS18 (s) OPERATIONAL TEST FUEL INDICATING SYSTEM 28.100 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 HYDRAULIC POWER 29 CHAPTER 290001 NO. 1 SHUT-OFF VALVE 29.040 45AS65014-003 10613109 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 290002 NO. 2 SHUT-OFF VALVE 29.040 45AS65014-003 10613129 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 42 Of 107 291001 HYDRAULIC PACKAGE 29.010 390-384403-0007 0008 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 291011 NO. 1 ENGINE HYDRAULIC PUMP 29.070 390-389022-0003 K0172 REF: MOS HRS/MSC AFL O/C 13-OCT-2011 1980.1 1589 See Workcard 291012 NO. 2 ENGINE HYDRAULIC PUMP 29.070 390-389022-0003 K0198 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 293001 HYDRAULIC PRESSURE INDICATOR 29.050 390-382009-0005 99H233 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard PKG + 300A29 (s) INSPECT HYDRAULIC PACKAGE 29.010 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 300A30 (s) INSPECTION/CHECK HYDRAULIC PACKAGE INLET AIR FILTER/CHECK VALVE 29.010 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 + AIRWORTHINESS SPC23 REPLACE HYDRAULIC PACKAGE PRESSURE AND RETURN FILTERS 29.030 REF: MOS HRS/MSC AFL 400 18-SEP-2014 2355.1 1855 2755.1 See Workcard 301.3 (+20) +20/-20 2775.1 ICE AND RAIN PROTECTION 30 CHAPTER + AIRWORTHINESS 100E06 INSPECT FRONT AND SIDE WINDSHIELDS 30.160 REF: MOS HRS/MSC AFL 200 18-SEP-2014 2355.1 1855 2555.1 See Workcard 101.3 (+20) +20 2575.1 PKG 200D06 (s) INSPECT ANTI-ICE DUCTS 30.010 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 300A31 (s) INSPECT ANTI-ICE CROSS FEED VALVE 30.020 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 300C14 (s) INSPECT ENERGY STORAGE BANK 30.030 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 43 Of 107 + MANDATORY 300C18 REPLACE LEFT ELECTROMAGNETIC EXPULSIVE DEICE (EMED) ACTUATOR 30.100 REF: MOS HRS/MSC AFL 5400 21-APR-2003 0 0 5400 See Workcard 2946.2 MANDATORY 300C18 REPLACE RIGHT ELECTROMAGNETIC EXPULSIVE DEICE (EMED) ACTUATOR 30.100 REF: MOS HRS/MSC AFL 5400 21-APR-2003 0 0 5400 See Workcard 2946.2 301001 ANTI-ICE CROSSFEED VALVE 30.020 390-385013-0001 0031 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 301011 NO. 1 EJECTOR PUMP 30.190 390-385041-0001 0205 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 301012 NO. 2 EJECTOR PUMP 30.190 390-385041-0001 0199 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 301021 DE-ICING CONTROL UNIT 30.200 390-384013-0007 0113 REF: MOS HRS/MSC AFL O/C TSO:0 TSO:0 TSO:0 11-DEC-2008 1392.8 See Workcard 301031 LEFT HAND PRESSURE REGULATOR AND SOLENOID VALVE 30.040 390-385036-0009 0255 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 301032 RIGHT HAND PRESSURE REGULATOR AND SOLENOID VALVE 30.040 390-385036-0011 0252 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 301101 NO. 1 HORIZONTAL DE-ICE LEADING EDGE ASSEMBLY 30.210 PN SN-UNKNOWN REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 See Workcard 301102 NO. 2 HORIZONTAL DE-ICE LEADING EDGE ASSEMBLY 30.210 PN SN-UNKNOWN REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 See Workcard 301111 NO. 1 ENERGY STORAGE BANK 30.230 390-386000-0001 080 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 44 Of 107 301112 NO. 2 ENERGY STORAGE BANK 30.230 390-386000-0001 055 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 308001 NO. 1 ICE DETECTOR 30.220 0871KK2 0272 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 308002 NO. 2 ICE DETECTOR 30.220 0871KK2 0301 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard + AIRWORTHINESS OPS20 OPERATIONAL TEST WING ANTI-ICE CROSS FEED VALVE AND ANTI-ICE SWITCHES 30.180 REF: MOS HRS/MSC AFL 400 18-SEP-2014 2355.1 1855 2755.1 See Workcard 301.3 (+20) +20/-20 2775.1 + AIRWORTHINESS OPS21 OPERATIONAL TEST STRUCTURE OVER TEMPERATURE SWITCH 30.070 REF: MOS HRS/MSC AFL 3600 21-DEC-2004 407.4 309 4007.4 See Workcard 1553.6 (+200) +200 4207.4 + AIRWORTHINESS OPS22 OPERATIONAL TEST LEADING EDGE OVER TEMPERATURE SWITCH 30.080 REF: MOS HRS/MSC AFL 3600 21-DEC-2004 407.4 309 4007.4 See Workcard 1553.6 (+200) +200 4207.4 PKG + OPS23 (s) OPERATIONAL TEST AUTO MODE 30.090 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + AIRWORTHINESS OPS24 (s) OPERATIONAL TEST MANUAL MODE (EMED) 30.090 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + OPS26 (s) OPERATIONAL CHECK TT2 SENSOR 30.120 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 + AIRWORTHINESS OPS27 OPERATIONAL TEST ENGINE ANTI-ICE PRESSURE SWITCH 30.130 REF: MOS HRS/MSC AFL 3600 24-APR-2003 0 0 3600 See Workcard 1146.2 (+200) +200 3800 PKG + OPS28 (s) OPERATIONAL TEST PITOT STATIC PROBE HEAT 30.140 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 45 Of 107 PKG + OPS30 (s) OPERATIONAL TEST FRONT AND SIDE WINDSHIELD HEAT 30.170 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 INDICATING/RECORDING SYSTEMS 31 CHAPTER 311011 CABIN BRIEFER 31.180 PN SN-UNKNOWN REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 GENERIC NO REF 311013 DIFFERENTIAL PRESSURE GAUGE INDICATOR 31.030 PN SN-UNKNOWN REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 GENERIC NO REF 311041 PITCH TRIM INDICATOR 31.050 390-382034-0005 G104 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 GENERIC NO REF 311051 RUDDER TRIM INDICATOR 31.050 390-382035-0003 1H63 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 GENERIC NO REF 311061 ROLL TRIM INDICATOR 31.050 390-382036-0003 1G244 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 311071 FLAP INDICATOR 31.060 390-382037-0003 99G193 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 GENERIC NO REF 311075 ANNUNCIATOR 31.080 390-382004-0013 0113 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 311091 NO. 1 DC LOAD INDICATOR 31.070 390-382030-0003 99K210 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 GENERIC NO REF 311092 NO. 2 DC LOAD INDICATOR 31.070 390-382030-0003 99B72 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 GENERIC NO REF 311097 DC VOLTMETER 31.090 390-382031-0003 00I56 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 GENERIC NO REF TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 46 Of 107 314001 MAINTENANCE DIAGNOSTIC COMPUTER 31.100 822-1139-021 10X2C REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 314011 ICC-3000 COMPUTER 31.110 822-1129-001 10B5B REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 314021 IEC-3001 CARD CAGE 31.120 822-1167-001 107LY REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 314031 NO. 1 PWR-3000 CARD CAGE 31.130 822-1137-001 10X2H REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 314032 NO. 2 PWR-3000 CARD CAGE 31.130 822-1137-001 10X2G REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 314041 NO. 1 IOC-3100 CARD CAGE 31.140 822-1361-001 10L5W REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 314042 NO. 2 IOC-3100 CARD CAGE 31.140 822-1361-001 10JRR REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 314051 NO. 1 DATA CONCENTRATOR UNIT 31.150 822-1132-002 HDTY REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 314052 NO. 2 DATA CONCENTRATOR UNIT 31.150 822-1132-002 JBFG REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 314061 NO. 1 OPTION CONTROL MODULE 31.160 822-1484-201 10WWL REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 314062 NO. 2 OPTION CONTROL MODULE 31.160 822-1484-201 10WWK REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 47 Of 107 315001 AURAL WARNING GENERATOR 31.170 630-006 204 REF: MOS HRS/MSC AFL O/C 01-OCT-2004 339.1 249 See Workcard + AIRWORTHINESS OPS31 TEST FLAPS AND SPOILERS TAKEOFF CONFIGURATION WARNING 31.020 REF: MOS HRS/MSC AFL 200 18-SEP-2014 2355.1 1855 2555.1 See Workcard 101.3 (+20) +20/-20 2575.1 + AIRWORTHINESS OPS37 CHECK DCU AURAL WARNING 31.010 REF: MOS HRS/MSC AFL 200 18-SEP-2014 2355.1 1855 2555.1 See Workcard 101.3 (+20) +20/-20 2575.1 LANDING GEAR 32 CHAPTER PKG + 100A04 (s) INSPECT BRAKE CONTROL CABLE, LINKAGE, AND CONNECTORS - PARKING BRAKE 32.240 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 100A05 (s) INSPECT STEERING BELLCRANKS AND PUSHRODS 32.340 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 100A06 (s) INSPECT LANDING GEAR ALTERNATE EXTENSION CABLES 32.100 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 100A07 (s) INSPECT LANDING GEAR ALTERNATE EXTENSION FORWARD QUADRANT 32.020 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 100A08 (s) INSPECT BRAKE LINKAGE 32.250 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 100B07 (s) INSPECT LANDING GEAR ALTERNATE EXTENSION CABLES 32.010 PKG 7 REF: MOS HRS/MSC AFL 1200 18-SEP-2014 2355.1 1855 See Workcard +20/-20 PKG + 200D07 (s) INSPECT BRAKE ASSEMBLIES - BRAKE SYSTEM 32.320 PKG 6 REF: MOS HRS/MSC AFL 600 18-SEP-2014 2355.1 1855 See Workcard +20/-20 + AIRWORTHINESS 200D08 INSPECT ANTI-SKID SYSTEM REF: MOS HRS/MSC AFL 400 18-SEP-2014 2355.1 1855 2755.1 See Workcard 301.3 (+20) +20 2775.1 TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 48 Of 107 320001 LANDING GEAR CONTROL 32.410 390-382011-0003 093 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 320011 LANDING GEAR SELECTOR VALVE 32.420 390-381200-0007 0120 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 321001 LEFT MAIN LANDING GEAR DOOR ACTUATOR 32.430 390-381202-0005 0264 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 321002 RIGHT MAIN LANDING GEAR DOOR ACTUATOR 32.430 390-381202-0006 0218 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 321011 LEFT MAIN LANDING GEAR ASSEMBLY 32.070 390-810001-0001 5090201ICT REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 321012 RIGHT MAIN LANDING GEAR ASSEMBLY 32.070 390-810001-0002 6050202ICT REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 321021 LEFT MAIN LANDING GEAR RESTRICTOR 32.440 390-388113-0001 0095 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 GENERIC NO REF 321022 RIGHT MAIN LANDING GEAR RESTRICTOR 32.440 390-388114-0001 0026 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 GENERIC NO REF 321031 LEFT MAIN LANDING GEAR UPLOCK CABLE ASSEMBLY 32.450 390-381203-0003 163 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 321032 RIGHT MAIN LANDING GEAR UPLOCK CABLE ASSEMBLY 32.450 390-381203-0003 171 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 321041 LEFT MAIN LANDING GEAR DOOR UPLOCK CABLE ASSEMBLY 32.460 390-381204-0003 257 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 GENERIC NO REF TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 49 Of 107 321042 RIGHT MAIN LANDING GEAR DOOR UPLOCK CABLE ASSEMBLY 32.460 390-381204-0003 254 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 321052 VALVE PACKAGE CABLE ASSEMBLY 32.650 PN SN-UNKNOWN REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 See Workcard 322001 NOSE LANDING GEAR DOWNLOCK ACTUATOR 32.470 390-384112-0001 0041 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 322011 NOSE LANDING GEAR ASSY 32.480 390-820001-0001 9100201ICT REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 323001 NOSE LANDING GEAR RETRACT ACTUATOR 32.490 390-388200-0001 0040 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 323011 NOSE LANDING GEAR UPLOCK RELEASE ACTUATOR 32.500 390-381201-0005 0658 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 323021 NOSE LANDING GEAR UPLOCK ASSEMBLY 32.180 PN SN-UNKNOWN REF: MOS HRS/MSC AFL O/C TSN:0 TSN:0 TSN:0 24-APR-2003 0 0 See Workcard 323031 LEFT MAIN LANDING GEAR UPLOCK RELEASE ACTUATOR 32.510 390-381201-0005 0643 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 323032 RIGHT MAIN LANDING GEAR UPLOCK RELEASE ACTUATOR 32.510 390-381201-0005 0674 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 323041 LEFT MAIN LANDING GEAR DOOR UPLOCK ACTUATOR 32.520 390-381201-0005 0653 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 323042 RIGHT MAIN LANDING GEAR DOOR UPLOCK ACTUATOR 32.520 390-381201-0005 0604 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard TASK NO TASK DESCRIPTION UNIT COMPLIANCE INTERVAL TIME SINCE WARR EXP ADJ TIME REMAINING MAX LIMIT Report Date: 05-OCT-2015 PART/SERIAL NEXT DUE Status Report PREMIER 1 S/N RB-62 (N808CS): 2453.8 HRS, 1945 AFL as of 15-Sep-2015 Owner/Operator: CONQUEST INVESTMENTS INC. (ENG/APU) A/C © CAMP SYSTEMS ?-Insufficient Information +-Task exists in Inspection Manual (s)-Suppressed Requirement (EBT)-Estimated Base Time *-Estimated Due (New Requirement) (EFF)-Effective C/W (ENG/APU) = Engine/APU Units 50 Of 107 323051 LEFT MAIN LANDING GEAR RETRACT ACTUATOR 32.210 390-388100-0005 0214 REF: MOS HRS/MSC AFL O/C TSO:0 TSO:0 TSO:0 13-APR-2006 778.7 See Workcard 323052 RIGHT MAIN LANDING GEAR RETRACT ACTUATOR 32.210 390-388100-0006 0243 REF: MOS HRS/MSC AFL O/C TSR:92 TSR:0 TSR:0 20-FEB-2013 2192.8 1748 See Workcard 323061 MAIN LANDING GEAR EXTEND VALVE 32.530 390-388112-0007 0079 REF: MOS HRS/MSC AFL O/C 13-JUL-2005 555 419 See Workcard 323071 MAIN LANDING GEAR EMERGENCY CABLE ASSEMBLY 32.540 390-384317-0001 RB-62 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 324001 POWER BRAKE VALVE 32.550 390-384300-0003 237 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 324011 HYDRAULIC ACCUMULATOR 32.560 390-384106-0003 0051 REF: MOS HRS/MSC AFL O/C 24-APR-2003 0 0 See Workcard 324021 PARKING BRAKE VALV