STANDARD SPECIFICATIONS AND DETAILS
CESSNA 150 G5 · Specifications
Overview
This document is the 2024 Edition of the Standard Specifications and Details adopted by the City Council of Pleasanton. It outlines the minimum standards for materials and methods of construction for public infrastructure projects, including streets, water, sanitary sewer, and storm drainage facilities. The specifications are intended for use in conjunction with the City Standard Details and apply to both City capital improvement and private development projects. The document serves as a comprehensive guide for contractors and developers to ensure compliance with local regulations and standards.
- The document provides minimum standards for public infrastructure construction in Pleasanton.
- Contractors must comply with local regulations regarding traffic control and noise levels.
- Erosion and sedimentation control measures are mandatory to protect the environment.
- Quality control procedures must ensure the use of new materials and proper supervision.
- The document serves as a reference for both public and private development projects.
Document
Source
Originally published by www.cityofpleasantonca.gov. Sprinkle hosts a reference copy with an added summary, specifications and searchable full text.
Document details
- Type
- Specifications
- Year
- 2024
- Pages
- 442
- File size
- 20 MB
- Publisher
- www.cityofpleasantonca.gov
Common. One of the most common aircraft types we track.
Most owners only have the POH. Here's the essential set for the CESSNA 150 G5.
- Pilot's Operating Handbook / AFM
- Checklist
- Maintenance Manual
- Parts Catalog (IPC)
- Systems & Wiring
- Service Bulletins
- Type Certificate (TCDS)
CESSNA 150 G5 for sale now
Free — save the 150 to your watchlist and track it in one place.
More CESSNA 150 G5manuals & documents
See all 20 →- NIH RPPR Instruction GuideSupplemental Type Certificate
- BULLETIN 15 (Publication 35) Qualified Products List for ConstructionChecklist
- Data Sheet AD5940/AD5941V Speeds Reference
- Product Data SheetV Speeds Reference
- Product Data SheetV Speeds Reference
- 22 mm Push Button SpecificationsService Bulletins
- Minor Change / Minor RepairService Bulletins
- Maintenance and Service GuideParts Catalog
- Cessna Flyer - September 2019Other Documents
- A Comparison of the V2X Communication Systems: ITS-G5 and C-V2XPerformance Data
- Product Information SheetSpecifications
- KDIGO 2012 Clinical Practice Guideline for the Evaluation and Management of Chronic Kidney DiseaseV Speeds Reference
If you fly the CESSNA 150 G5, you may also be researching these.
In this document
General
This section outlines the scope and purpose of the City Standard Specifications, which provide minimum standards for materials and construction methods for public infrastructure. It defines key terms such as 'Contractor', 'City Project', and 'Public Right-of-Way', establishing a framework for the responsibilities and expectations of all parties involved in construction projects.
Traffic Control
This section details the requirements for traffic control during construction activities. It emphasizes the importance of maintaining safe traffic flow and outlines the necessary signage, barriers, and procedures to minimize disruption to the public.
Erosion and Sedimentation Control
This section provides guidelines for controlling erosion and sedimentation during construction. It includes best management practices to prevent soil erosion and protect water quality, ensuring compliance with environmental regulations.
Quality Control
This section specifies the quality control measures that contractors must adhere to. It emphasizes the use of new and unused materials, proper supervision, and compliance with specified standards to ensure the integrity of construction work.
Noise Control
This section outlines the noise limitations for construction activities, specifying acceptable noise levels during designated hours. It refers to local municipal codes and provides guidelines for minimizing noise pollution during construction.
Safety notes
- Contractors must notify residents of potential service interruptions 48 hours in advance.
- Existing utilities must be protected during construction to prevent damage.
- All construction sites must be secured against vandalism and unauthorized access.
Full document text
STANDARD SPECIFICATIONS AND DETAILS JULY 2024 ADAM M. NELKIE CITY ENGINEER Plans Available at: https://www.cityofpleasantonca.gov/assets/our- government/public-works/engineering/standard- specifications-and-details-July 2024.pdf 2024 Edition of the Standard Specifications and Details Adopted by City Council on July 16, 2024 Updating the City of Pleasanton Standard Specifications and Details was completed by hard work and dedication of several City employees. Special thanks and appreciation are given to the following individuals: Standard Specifications and Details Committee Siew-Chin Yeong, Director of Public Works Adam M. Nelkie, City Engineer/Assistant Director of Public Works Michael Stella, Senior Civil Engineer Gerry Parco, Senior Civil Engineer Tim Armbruster, Construction Services Manager Technical Input Jeremy Cox Utilities Division Manager Daniel McVey Utilities Supervisor Ryan Ravalin Chief Utilities System Operator Giacomo Damonte Parks Division Manager Brian Fiorio Parks Maintenance Supervisor Mike Tassano Deputy Director of Community Development, Transportation Eric Kurz Traffic Engineering Tech III David Luera Operations & Maintenance Manager Steven Martin Streets & Signs Supervisor Matt Gruber Landscape Architect Huy Ho Associate Civil Engineer Tommy Nguyen Associate Civil Engineer Lily Peng Associate Civil Engineer SM Saklaen Associate Civil Engineer Tom Mucha Associate Engineer / Architect Computer Drafting Su Nguyen Engineering Technician II TABLE OF CONTENTS SECTION 1. GENERAL ……………………………………………………………………………1 SECTION 2. TRAFFIC CONTROL ……………………………………………………………….22 SECTION 3. CLEARING AND GRUBBING ……………………………………………….........27 SECTION 4. ROADWORK EXCAVATION AND GRADING …………………………………...33 SECTION 5. EROSION AND SEDIMENTATION CONTROL …………………………….........37 SECTION 6. AGGREGATE SUBBASE ……………………………………………………..........39 SECTION 7. AGGREGATE BASE …………………………………………………………..........40 SECTION 8. HOT MIX ASPHALT, LIQUID ASPHALT, AND ASPHALTIC EMULSION...........42 SECTION 9. HOT MIX ASPHALT PAVING…….………………………………………………..47 SECTION 10. BITUMINOUS SEALS ……………………………………………………………..61 SECTION 11. TRENCH EXCAVATION AND BACKFILL ……………………………………….78 SECTION 12. STORM DRAIN …………………………………………………………………….88 SECTION 13. SANITARY SEWER ………………………………………………………………..96 SECTION 14. WATER …………………………………………………………………………….110 SECTION 15. CONCRETE IMPROVEMENTS ………………………………………………….127 SECTION 16. STREET NAME AND TRAFFIC SIGNS …………………………………………134 SECTION 17. TRAFFIC STRIPES AND PAVEMENT MARKINGS …………………………....138 SECTION 18. STREET LIGHTING ………………………………………………………………146 SECTION 19. IRRIGATION ………………………………………………………………………156 SECTION 20. PLANTS AND PLANTINGS ……………………………………………………..169 SECTION 21. RECYCLED WATER ……………………………………………………………...188 SECTION 22. CATHODIC PROTECTION ………………………………………………………193 SECTION 23. SIGNALS AND LIGHTING …………..…………………………………………..206 SECTION 24. MISCELLANEOUS …………………………………………………………….....233 DETAILS ……………………………………………………………………………………………i-v i TABLE OF CONTENTS STANDARD DETAILS DRAWING NO. TITLE STREET STANDARDS 101 TYPE “A” CURB, GUTTER AND SIDEWALK 102 TYPE “B” MONOLITHIC CURB, GUTTER AND SIDEWALK 103 TYPE “C” MONOLITHIC CURB, GUTTER AND SIDEWALK 104 MEDIAN ISLAND CURB WITH LANDSCAPING 105 ROLLED CURB 106 TYPE “A” DRIVEWAY APPROACH 107 TYPE “B” DRIVEWAY APPROACH 108 TYPE “C” COMMERCIAL DRIVEWAY APPROACH 109 CONCRETE VALLEY GUTTER AND APRON 110 CONFORM TO PAVEMENT 111 CONFORM PAVEMENT TO GUTTER 112 CONFORM NEW PAVEMENT TO EXISTING PAVEMENT 113 TRENCH BACKFILL FOR STREETS 114 TRENCH BACKFILL FOR UNDEVELOPED AREAS 115A ADA RAMP (CALTRANS LATEST EDITION) – CASE A 115C ADA RAMP (CALTRANS LATEST EDITION) – CASE B 115D ADA RAMP – CASE C 115G ADA RAMP (CALTRANS LATEST EDITION) – CASE D 115H ADA RAMP (CALTRANS LATEST EDITION) – CASE E 115I ADA RAMP (CALTRANS LATEST EDITION) – CASE F 115J ADA RAMP W/ TWO RETAINING CURBS – CASE F1 115K ADA RAMP (CALTRANS LATEST EDITION) – CASE G 115L ADA RAMP END OF SIDEWALK – CASE G1 115M 115N 115O ADA RAMP NOTES AND DETAILS ADA RAMP – BLENDED TRANSITION RAMP WITH ISLAND ADA RAMP – BLANDED TRANSITION RAMP 116 STREET BARRICADE 117 STREET NAME SIGN POST 118 STREET NAME SIGN 119 ARC STREET NAME SIGN 120 TRAFFIC SIGN 121 TEMPORARY TRAFFIC SIGN-WOOD POST 122 HACIENDA BUSINESS PARK SIGN DETAIL 123 HACIENDA BUSINESS PARK LANDSCAPE AND MAINTENANCE BOUNDARY 124 125 126 EMERGENCY VEHICLE ACCESS GATE EMERGENCY VEHICLE ACCESS GATE REMOVABLE PATHWAY BOLLARD 127 127A PATHWAY BOLLARD SURFACE MOUNT BOLLARD ii DRAWING NO. TITLE 128 MONUMENT 129 LEFT TURN LANE-TRANSITION 130 MEDIAN FLARES 131 ACCESS TO OFF-STREET PARKING FACILITIES 132 STRIPING AND PARKING STALL DETAIL 133 134 135 136 137 138 BUS STOP DETAIL FIRE APPARATUS TURN AROUND TEMPORARY TRAFFIC CONTROL FOR SHOULDER AND SIDEWALK CLOSURE CONTINENTAL CROSSWALKS TRAFFIC CHANNELIZER SPEED LUMP AND ADVANCE WARNING MARKINGS 139 DRIVEWAY APPROACH FOR NEW DEVELOPMENT STORM DRAIN STANDARDS 201A TYPE 1 STORM DRAINAGE CURB INLET 201B CURB INLET 201C CURB INLET 201D CURB INLET 201E CURB INLET 202A TYPE II STORM DRAIN CURB INLET PRECAST COVER 202B TYPE II STORM DRAIN 2’X4’ CURB INLET 203 TYPE I STORM DRAIN MANHOLE. PIPE SIZES 12”-36” 204 TYPE II STORM DRAIN MANHOLE. PIPE SIZES 54”-84” 205 TYPE III STORM DRAIN MANHOLE. PIPE SIZES 42”-48” 206 MANHOLE FRAME & COVER 207 36” MANHOLE FRAME & COVER 208 OFF-SITE DRAIN THROUGH CURB 209 210 211 212 213 214 215 SUBDRAIN DETAIL “NO DUMPING” CATCH BASIN MARKING “NO DUMPING” INLET MARKING ASSEMBLED REMOVABLE FRONT AND HINGED TOP SCREEN CPS ASSEMBLED REMOVABLE FRONT AND TOP SCREEN CPS CONNECTOR PIPE SCREEN CONFIGURATION HEADWALL FOR STORMWATER PIPING WATER STANDARDS 301 STANDARD WATER SERVICE (FOR RESIDENTIAL) 302 TEMPORARY WATER SERVICE (FOR RESIDENTIAL) 303 STANDARD WATER SERVICE (MONOLITHIC SIDEWALK) 304 COMMERCIAL & INDUSTRIAL WATER SERVICE 305 MANIFOLD WATER SERVICE 306 FIRE HYDRANT CONNECTION
Show full textShow less
iii DRAWING NO. TITLE 307 FIRE HYDRANT CONNECTION (W/HYDRANT ON SAME SIDE OF STREET AS JOINT TRENCH) 308A-C 309 LOCATING HYDRANT MARKERS MID LINE BLOWOFF 310 BLOWOFF AT DEAD END NEW CONSTRUCTION 311 TYPICAL THRUST BLOCKS 312 COMBINATION AIR-VACUUM RELEASE VALVE ASSEMBLY 313 TEE INSTALLATION ON EXISTING PIPE 314 315 316 317 318 GATE VALVE INSTALLATION LOCATOR STATION VALVE BOX INSTALLATION UTILITY UNDERCROSSING DETAIL 1 UTILITY UNDERCROSSING DETAIL 2 SANITARY SEWER STANDARDS 401 SANITARY SEWER MANHOLE 402 SAMPLING MANHOLE 403 NEW PIPE INSTALLATION UNDER EXISTING PIPE 404 SANITARY SEWER AND WATER MAIN SEPARATION 405 SANITARY SEWER AND WATER MAIN SEPARATION 406 CLOSE CROSSING DETAIL 407 SANITARY SEWER DROP MANHOLE 408 STANDARD SEWER LATERAL 409 410 CLEAN-OUT PIPE CONNECTION TO EXISTING STRUCTURE 501 502 STREET LIGHT/TRAFFIC SIGNAL STANDARDS STREET LIGHT STANDARD – MAJOR STREET STREET LIGHT STANDARD – MINOR STREET 503 STREET LIGHT STANDARD CONCRETE FOOTING DETAIL 505 DETECTOR LOOP WIRE SPLICE 506 STREET LIGHT STANDARD TRENCH DETAIL & SYSTEM CONNECTION DIAGRAMS 507 STREET LIGHT STANDARD – POST TOP ELECTROLIER 508 509 510 511 STREET LIGHT STANDARD – POST TOP ELECTROLIER FOR RESIDENTIAL STREETS DOWNTOWN STREET LIGHT POLE DOWNTOWN CANDY CANE STREET POLE DOWNTOWN TRANSPORTATION CORRIDOR LIGHT POLE MISCELLANEOUS DETAILS 601A-C NEWSPAPER RACKS AND SIMILAR DISPENSERS 602 MAILBOX DETAILS iv DRAWING NO. TITLE 603 PROJECT IDENTIFICATION SIGN 604A-I TRASH ENCLOSURE BACKFLOW PREVENTION STANDARDS 701 702 COMMERCIAL AND INDUSTRIAL WATER SERVICE WITH FIRE SERVICE SYSTEM FIRE SERVICE SYSTEM ONLY (NO DOMESTIC) 703 FIRE SERVICE CONNECTION TO SPRINKLERED BUILDINGS 704 705 FIRE SERVICE CONNECTION TYPE I TO SPRINKLERED BUILDINGS FIRE SERVICE CONNECTION TYPE II TO SPRINKLERED BUILDINGS 706 707 BACKFLOW PREVENTER FOR DOMESTIC OR IRRIGATION SERVICE RESIDENTIAL DOMESTIC WATER SERVICE AND IRRIGATION SERVICE 708 709 COMMERCIAL AND INDUSTRIAL FIRE AND WATER SERVICES BUSINESS PARKS WATER SERVICE RISER REQUIREMENTS 710 BACKFLOW PREVENTER INSTALLATION FOR 3” & LARGER 711 BACKFLOW PREVENTER COMPACT INSTALLATION FOR 3” & LARGER LANDSCAPE STANDARDS 801 REMOTE CONTROL VALVE 802 QUICK COUPLER IN LOCKING BOX 803 ISOLATION VALVE 804 IRRIGATION TRENCHING 805 COBBLE PAVING 806 TREE PLANTING DETAIL 807 808 ROOT BARRIER DETAIL DECOMPOSED GRANITE PAVING 809 SHRUB PLANTING DETAIL 810 811 IRRIGATION SPLICE ASSEMBLY POP-UP SPRINKLER ON TRIPLE SWING ASSEMBLY 813 METAL HEADERBOARD 814 DROP INLET FOR PARK & PARKWAY USE ONLY 815 TREE/PLANTING BUBBLER DETAIL 816 DRIP IRRIGATION VALVE ASSEMBLY 818 SHRUB PLANTING ON SLOPES 819 FLOW SENSOR INSTALLATION 821 822 IRRIGATION CONTROLLER ASSEMBLY MASTER VALVE DETAIL 824 ROOT CUTTING DETAIL 825 826 STANDARD DRINKING FOUNTAIN HI-LO DRINKING FOUNTAIN 828 829 BICYCLE RACK TREE PROTECTION v DRAWING NO. TITLE MAIN STREET STANDARDS 910 CURB RETURN AND DECORATIVE WALK SECTION 910A CROSSWALK AND CURB & GUTTER TYPICAL PLAN 910B TYPICAL CURB, GUTTER AND SIDEWALK PLAN 911 1001 1003 1004 1005 1006 1007 1008 1009 1010 1011 1012 1013 1101 1102 1103 1104 1105 1106 1107 1108 1109 1110 1111 1112 1113 TREE WELL WITHIN PAVERS AND SIDEWALK RECYCLED WATER RECYCLED WATER SERVICE RECYCLED WATER COMMERCIAL AND INDUSTRIAL WATER SERVICE RECYCLED WATER SIGN POST RECYCLED WATER ALUMINUM SIGN RECYCLED WATER ALUMINUM SMALL SIGN RECYCLED WATER IRRIGATION DECAL SIGNS RECYCLED WATER DECAL SIGN RECYCLED WATER TAG RECYCLED WATER FLUSHING HYDRANT CONNECTION RECYCLED WATER FLUSHING CONNECTION RECYCLED WATER METER BOX REPLACEMENT RECYCLED WATER MINIMUM RESTRAINED JOINT LENGTHS CATHODIC PROTECTION SYSTEM CATHODIC PROTECTION SYSTEM – DETAILS 1 CATHODIC PROTECTION SYSTEM – DETAILS 2 CATHODIC PROTECTION SYSTEM – DETAILS 3 CATHODIC PROTECTION SYSTEM – DETAILS 4 CATHODIC PROTECTION SYSTEM – DETAILS 5 CATHODIC PROTECTION SYSTEM – DETAILS 6 CATHODIC PROTECTION SYSTEM – DETAILS 7 CATHODIC PROTECTION SYSTEM – DETAILS 8 CATHODIC PROTECTION SYSTEM – DETAILS 9 CATHODIC PROTECTION SYSTEM – DETAILS 10 CATHODIC PROTECTION SYSTEM – DETAILS 11 CATHODIC PROTECTION SYSTEM – DETAILS 12 CATHODIC PROTECTION SYSTEM – DETAILS 13 - 1 - SECTION 1. GENERAL 1-01 Scope and Purpose The scope and purpose of these City Standard Specifications are to provide minimum standards for materials used and methods of construction for the City’s public infrastructure including streets, water, sanitary sewer, and storm drainage facilities. The City Standard Specifications are to be used in conjunction with the City Standard Details. These minimum standards shall apply to City capital improvement and private development projects. All references to industry standards shall mean “to the latest version of the standard at the time of the bid.” 1-02 Definition and Terms As used in these City Standard Specifications unless the context otherwise requires, the following terms have the meanings indicated: Addenda: Written or graphic instruments, clarifications, or corrections issued prior to the execution of the contract, that modify or interpret the Contract Documents. Bidder: Any individual, partnership, or corporation submitting a Bid Proposal for the work described in the Contract Documents. Bidding Documents: Includes the Notice to Bidders, the Bid Proposal, Bid Bond, Contractor's Information Forms – including the Contractor's experience, financial responsibility, and Subcontractors – and Instructions to Bidders. City: The City of Pleasanton. City Project: A public improvement project contracted by the City of Pleasanton. City Standard Specifications and Details: The latest edition of the City's Standard Specifications and Standard Details. Contractor: Any individual, partnership, or corporation that has entered a Contract with the City to perform the work described in the Contract Documents for Capital Improvement projects or with the Developer for private development improvements. Contract Documents: Includes the Bidding Documents, the Award and Execution of Contract Requirements, the Contract, the Labor and Material Bond, the Performance Bond, the Maintenance Bond, the City General Provisions, the Special Provisions, Project Plans, the city of Pleasanton Standard Specifications and Details, the State Standard Specifications and Standard Plans, all Addenda issued by the City, and all Change Orders executed by the City. Developer: A person, firm, or corporation with whom the City has executed a written improvement agreement. - 2 - Engineer: The City Engineer of the City of Pleasanton, acting either directly or through properly authorized agents, such agents acting within the scope of the duties entrusted to them. General Provisions: Those Specifications that apply to all projects unless specifically modified by Special Provisions. Private Development Project: A commercial or residential improvement contracted by a private developer. Project Plans: Drawings specifically prepared for a particular project. Public Right-of-Way: Any real property within a street or public utility easements dedicated to the City. Public Works Inspector: A representative of the City Engineer assigned to inspect Public Improvements to ascertain that the material and workmanship are in accordance with the requirements of these City Standard Specifications, the Special Provisions, and the Project Plans. Special Provisions: Specifications specifically prepared for a particular project. State Standard Specifications and Standard Plans: Except where specified, the current edition, including all updates at the time and date of the bid opening, of the Standard Specifications and Standard Plans of the State of California, Department of Transportation. Any reference therein to the State of California or a State agency, office, or officer shall be interpreted to refer to the City or its corresponding agency, office, or officer acting under the contract. Subcontractor: Any individual, partnership, or corporation that has contracted with the Contractor to provide labor, equipment, and/or materials described in the Contract Documents, which is an amount more than 0.5% of the prime Contractor's total bid or ten thousand dollars ($10,000), whichever is greater. Work: Material, equipment, tools, and labor to be provided by Contractor as defined by the Contract Documents. 1-03 Abbreviations The City Standard Specifications refer to standards materials and specifications of other published data of various national, regional, or local organizations in the form of abbreviations. In the City Standard specifications, the following abbreviations have the following corresponding meaning: - 3 - AASHTO American Association of State Highway and Transportation Officials ABAG Association of Bay Area Governments ACP Asbestos Cement Pipe ANSI American National Standards Institute ASA American Standards Association ASTM American Society for Testing and Materials AWWA American Water Works Association BASMAA Bay Area Stormwater Management Agencies Association BMP Best Management Practices CSA Canadian Standards Association C Celsius (temperature) CALTRANS Department of Transportation-State of California CPM Critical Path Method CTS Copper Tube Size DIP Ductile Iron Pipe DOHS Department of Health Services DSRSD Dublin San Ramon Services District F Fahrenheit (temperature) IEEE Institute of Electrical and Electronics Engineers IES Illuminating Engineers Society ISA International Society of Arboriculture MSDS Material Safety Data Sheets MUTCD Manual on Uniform Traffic Control Devices NEC National Electric Code NEMA National Electrical Manufacturer's Association OSHA Occupational Safety and Health Administration PE Polyethylene PG&E Pacific Gas & Electric PGS Pleasanton Garbage Service PSI Pounds per Square Inch PVC Polyvinyl Chloride RCP Reinforced Concrete Pipe RWQCB Regional Water Quality Control Board-State of California SDR Standard Dimension Ratio SWPPP Stormwater Pollution Prevention Plan TCP Traffic Control Plan UL Underwriters Laboratories USA Underground Service Alert USCC United States Composting Council USCFCCCHR University of Southern California Foundation for Cross Connection Control and Hydraulic Research VCP Vitrified Clay Pipe WELO Water Efficient Landscape Ordinance Zone 7 Alameda County Flood Control and Water Conservation District, Drainage Area 7-1 - 4 - 1-04 Order of Precedence of Specifications and Reference to Other Specifications The Work presented in the Contract Documents shall be done in accordance with the following documents: (1) Project Plans and the Special Provisions, (2) the City Standard Specifications and Details, (3) the State Standard Specifications and Standard Plans including all updates at time of bid, and (4) City-approved shop drawings. In case of conflicting portions, the above order of precedence shall prevail. In case of conflict between the specifications and drawings, the specifications shall prevail. 1--05 Operation of Existing Facilities Existing water, sanitary sewer, storm drainage, traffic signals, street lighting, irrigation system facilities, and other utilities must be kept in continuous operation throughout the construction period. Existing City-owned water valves shall be operated only by City personnel. If interruption of City-owned facilities is required, the Contractor shall give the Engineer a minimum of two (2) working days’ notice. Only interruption which does not adversely affect the degree of service provided will be permitted and is subject to permission obtained from the Engineer in advance. The Contractor shall provide temporary facilities and make temporary modifications as necessary to keep the existing facilities in operation during the construction period. All fire hydrants and water control valves shall be always kept free from obstruction and available for use. The Contractor shall notify affected residents in writing forty-eight (48) hours before any possible service interruptions. Door hangers are available from the City. No interruption on Friday unless approved otherwise. 1-06 Protection of Existing Utilities and Property Contractor shall comply with Section 5-1.36, "Property and Facilities Preservation," and Sections 7-1.05, "Indemnification," and 7-1.06 “Insurance,” of the State Standard Specifications. Contractor shall be held responsible for any damage to existing utilities and property, both public and private, due to Contractor's work. Contractor shall repair or replace any such damaged utilities and property according to the requirements of the Engineer at no additional cost to the City. - 5 - Contractor shall protect, shore, brace, support, and maintain all underground pipes, conduits, drains, and other underground construction uncovered or otherwise affected by construction operations. The Contractor shall be responsible for the removal of all Underground Service Alert markings and other reference marks at the completion of the project as directed by the Construction Services Inspector. For City Projects, all costs associated with this marking removal work shall be included in the prices paid for the items of work involved and no additional compensation shall be made. In the event that private water services or sewer laterals are damaged, the Contractor shall immediately, at the Contractor's own expense, repair such damage in a manner satisfactory to the Engineer so that service will not be interrupted for a period greater than one (1) hour. If such interruption is sustained, it shall be the Contractor's responsibility to notify the occupants of the premises to which said services were connected and make necessary arrangements so that no damage will occur on said premises. Whenever damage is done by the Contractor to public water, sewer, storm drainage facilities, traffic signals, streetlights, irrigation systems, or other utilities, the Contractor shall immediately notify the Engineer. Repair of public sewer and storm drainage facilities shall be made directly by the Contractor under the supervision of City personnel. Repair to existing public water facilities, including main and water service to the meter, shall be performed only by City personnel, but at the Contractor's expense. The Contractor shall provide access to existing City water facilities to City personnel for repair purposes. Trenching and backfill activities for water service repair shall be performed by the Contractor. The water service line damage between the meter and house shall be repaired by the Contractor shall restore all pavement, striping, surfacing, driveways, curbs, walks, buildings, utility poles, guy wires, fences, landscaping, and other surface structures to their original condition. All repairs and replacements shall be made with new materials. No trees shall be removed except were authorized by the Engineer. Contractor shall follow the requirements of Section 3-03F, "Protection of Trees," of these City Standard Specifications. Contractor shall comply with Section 15, “Existing Facilities,” of the State Standard Specifications. 1-07 Location of Existing Utilities The Project Plans show underground utilities in locations as they are known from record plans and reasonable inference from physical conditions. The Contractor shall be required to contact Underground Services Alert (USA) at 1-800-227-2600 to request marking of all underground facilities known to be in the area of construction a minimum of forty-eight (48)hours in advance of any excavation. For City projects, the Contractor shall also notify City’s Parks Division, Traffic Division and IT Department. It shall be the responsibility of - 6 - the Contractor to pothole all potential underground conflicts before start of trenching operations. All potholes are to be repaired at the direction of the Engineer. 1-08 Site Protection The Contractor shall be responsible for leaving the site in a safe condition each day before leaving the site. This shall include any temporary flagging, fencing, and street sweeping necessary for site safety. Toilet and material testing sites shall be screened. For City Projects, all costs associated with this Work shall be included in the prices paid for the items of Work involved, and no additional compensation will be made. 1-09 Dust Control Dust control shall be in accordance with these City Standard Specifications and Section 13, "Water Pollution Control," of the State Standard Specifications and Construction General Permit. The Contractor shall provide an acceptable plan for preventing the generation of dust due to their operations in the construction zones, along the haul routes, or equipment parking areas, including having a water truck on the site seven (7) days a week during grading operations. The plan shall consist of water sprinkling or an equivalent service every day, including days that work is not conducted on the project, to maintain adequate dust control during construction. Other measures of dust control may be required as directed by the Engineer. For City Projects, no separate payment will be made for dust control, and all costs in connection therewith shall be included in the payment items to which the work is incidental. City water shall be furnished by the City at points designated by the City's Water Department. A refundable deposit will be charged by the City's Water Department for the fire hydrant meter and backflow device. Information regarding required deposits and meter and backflow devices can be obtained from the City's Utility Billing Division at 925-931-5565. For City Projects, the Contractor will not be charged for water needed and used in association with the project. For Private Development Projects, the Contractor will be charged for water used according to the City's latest fee schedule. Alternatively, the City may require use of reclaimed water on any project at its sole discretion. If required, payment terms for City projects will be included in the project Special Provisions. During filling operations, tanker trucks must either use a hydrometer backflow prevention device approved by the Engineer or have a visible air gap mounted on the outside of the water tank approved by the Engineer. For overhead or "Tower Tanks," water fills to the tank shall be accomplished by either an air gap or a City-approved backflow prevention device. In the event the dust control is not satisfactory to the Engineer, the Engineer shall take such measures as may be necessary to ensure satisfactory dust control and, for City Projects, deduct the cost of such measures from any payments due the Contractor. For Private Development Projects, the cost of such measures shall be deducted from the hazard bond, and no work shall continue until the hazard bond is replenished. - 7 - 1-10 Noise Control The Contractor shall abide by the City of Pleasanton Municipal Code, Chapter 9.04, which specifies that between the hours of 8:00 a.m. and 8:00 p.m. daily, except Sundays and holidays, when the exemption shall apply between 10:00 a.m. and 6:00 p.m., construction, alteration, or repair activities which are authorized by a valid City permit shall be allowed if they meet at least one of the following noise limitations: A. No individual piece of equipment shall produce a noise level exceeding 83 dBA at a distance of 25 feet. If the device is housed within a structure on the property, the measurement shall be made outside the structure at a distance as close to 25 feet from the equipment as possible; or B. The noise level at any point outside of the property plane of the project shall not exceed 86 dBA. For additional information and for exceptions to this restriction, the Contractor is referred to Chapter 9.04 of the City of Pleasanton Municipal Code. 1-11 Security The Contractor shall be responsible for the protection against vandalism of the construction site, including all work performed, materials, equipment, tools, and existing facilities related to the Work. Access to all existing City facilities shall be maintained throughout the duration of the project, regardless of whether the site is secured during non-working hours. The Contractor shall use due diligence in protecting the work from vandalism. The Contractor is responsible for all costs for the repair or replacement of work due to vandalism until the project is accepted by the City. 1-12 Storage Contractors shall store materials in accordance with Section 6, "Control of Materials," of the State Standard Specifications and Section 1-25B, "Materials Storage," of these City Standard Specifications. Unless specifically designated on the Project Plans, the Contractor's storage site shall be approved by the Engineer. The Contractor shall not be allowed to stockpile any waste materials and/or construction debris on the project site beyond the day on which the waste was generated Materials need to be hauled off daily or covered in an approved dumpster. 1-13 Quality Control Contractor shall comply with Section 6, "Control of Materials," of the State Standard Specifications and the following requirements: Material and equipment to be incorporated into the Work shall be new and unused unless otherwise approved and shall bear the - 8 - manufacturer's stamp or marking. In case a reference is not clear as to which of several available grades is desired, the highest quality material shall be used. Where articles or materials are specified by brand or trade name, alternate materials or articles equal to those specified may be approved provided the request for approval is in writing, accompanied by supporting data, in ample time as determined by the Engineer, to permit investigations without delaying the work. Unless substitutions are approved, no deviation from the standards will be allowed. All Work shall be done by persons experienced in the specific work, under competent supervision, and in a manner to the Engineer's complete satisfaction as specified in Section 5-1.16, "Representative," and Section 5-1.17, "Character of Workman," of the State Standard Specifications. Materials not conforming to the requirements of these specifications shall be considered defective and all such materials, whether in place or not, shall be rejected and shall be removed from the site of the Work unless otherwise permitted by the Engineer. If the deficiencies of a rejected material are subsequently corrected, the material shall not be used until it has been inspected and approved by the Engineer. 1-14 Shop Drawings and Product Data Submittals The Contractor shall submit shop drawings and product data to meet the quality control requirements of Section 1-13, "Quality Control," of these City Standard Specifications. These submittals shall contain sufficient detail to show the type, dimensions, and installation of all materials and equipment. All submittals shall include a letter of transmittal and shall identify by reference, the sheet and detail numbers on the Project Plans and City Standard Details and sections of the Special Provisions and these City Standard Specifications. The Contractor's transmittal represents that the Contractor accepts full responsibility for determining and verifying field measurements and installation requirements. The Contractor shall confirm that the quality and quantity of all materials and equipment have been reviewed and are in compliance with the Contract Documents. The Contractor shall not be relieved of responsibility for any deviation from the requirements of the Contract Documents by the Engineer's review of shop drawings and product data submittals unless the Contractor has specifically informed the Engineer in writing of such deviation with the submittal and has received written approval by the Engineer of the specific deviation. The Engineer's review of shops drawings and product data submittals will cover only general conformity to the Contract Documents. The Engineer's review of submittals shall not relieve the Contractor from responsibility for errors, omissions, or deviation in compliance with the Contract Documents. Contractor shall submit seven (7) hardcopy sets of shop drawings and product data submittals along with one (1) electronic copy of all sheets (PDF format) required for distribution. Two - 9 - (2) sets will be retained by the Engineer. Submittals shall be consecutively numbered, followed by a letter to indicate sequence of resubmittals. Resubmittal resulting from non- compliance will not be cause for contract time extension. Contractor shall verify that all exceptions previously noted by the Engineer have been corrected in the resubmittal. Unless modified by the Special Provisions, the Engineer shall return the submittal with disposition to the Contractor within ten (10) working days of receipt. The Contractor shall, at any time, when requested, submit to the Engineer proper authenticated documents or other satisfactory proofs of compliance with the requirements of these specifications. This shall include certified copies of factory or laboratory test reports showing the strength characteristics of any materials used in the Work. Suppliers of material, upon request, shall furnish a certified statement signed by an authorized representative of the manufacturer that materials furnished under these specifications comply in all respects. All physical and chemical tests must be performed within the United States. 1-15 Easements, Rights of Way, and Right of Entry Easements and rights of way are shown on the Project Plans. The Contractor shall confine the Work within the limits of those easements and rights-of-way except for Work on private property, which is specifically called for on the Project Plans and for which the City has obtained a right of entry. 1-16 Lines and Grades and Construction Staking All Work shall be done in accordance with the lines, grades, and elevations shown on the Project Plans by a licensed surveyor. Staking and marking shall be provided in accordance with Section 5-1.24, "Construction Surveys," of the State Standard Specifications. Stakes and marks shall be carefully preserved by the Contractor. In case such stakes and marks are destroyed or damaged on City projects, they will be replaced by the Engineer at the expense of the Contractor. In the case of City projects, the Contractor will provide the staking and marking. For private development projects, sufficient staking and markings shall be provided to allow for required inspection as determined by the Engineer. 1-17 Cleanup The Contractor shall keep the premises free at all times from accumulations of waste materials and rubbish. Debris piles must be removed from the project site on a daily basis. Contractor shall provide adequate trash receptacles about the site and shall promptly empty the containers when filled. When required by plans and/or special provisions or conditions of approval for private development projects, debris shall be separated in bins and containers for collection as recyclable waste. Construction materials, such as concrete forms and scaffolding, shall be neatly stacked by the Contractor when not in use. The Contractor shall promptly remove splattered concrete, asphalt, oil, paint, corrosive liquids, and cleaning solutions from surfaces to prevent marring or other damage. Volatile waste shall be properly stored in covered metal containers and removed daily. Waste shall not be buried or burned on the site or disposed of into storm drains, sanitary sewers, streams, or waterways. All waste shall be removed from the site and disposed of in a manner complying with antipollution laws and Section 1-25B, "Materials Storage," of these City Standard Specifications. Construction dumpsters shall be provided by the Contractor in conformance with the City’s existing Waste Collection Franchise Agreement. The Contractor shall contact the City’s current waste collection company regarding policies for the storage, disposal, and recycling of materials. The Contractor shall remove all USA markings, submit waste/recycled ticket at the end of the project And clean up the SWPPP prior to final inspection. 1-18 Working Hours The Contractor shall restrict working time to Monday through Friday, 8:00 a.m. to 5:00 p.m., unless otherwise specified by the Engineer. Specific working hours may be set by the Engineer in the project’s Special Provisions or in the Conditions of Approval for Private Development Projects. There shall be no work allowed on weekends or city holidays unless approved by the Engineer. Water shutdown is only allowed at night for commercial property and during the day for residential areas as approved by the Engineer. 1-19 Mobilization Mobilization shall consist of preparatory work and operations, including, but not limited to , those necessary for the movement of personnel, equipment, supplies and incidentals to the project site; for the establishment of all offices, building and other facilities necessary for work on the project; and for all other work and operations which must be performed or costs incurred prior to beginning work on the various contract items on the project site. Full compensation for any necessary mobilization required shall be considered as included in the prices paid for the various contract items of work involved, and no additional compensation will be allowed therefore unless a specific bid item is shown on the bid form. Mobilization will not be approved until BMP/SWPPP has been approved by the City. 1-20 Permits and Licenses The Contractor shall be responsible for obtaining and paying for all necessary permits, including all required City permits. The Contractor shall also be required to obtain a City of Pleasanton Business License. The Contractor shall submit copies of all permits to the - 10 - - 11 - Engineer prior to the start of work. For City projects, an encroachment permit is required and issued by the Engineering Division. A separate Building Permit is also required and issued by the Building Department if the work is for a building project. 1-21 Progress Schedule A progress schedule shall be submitted to the Engineer in accordance with Section 8-1.02, "Schedule," of the State Standard Specifications. The schedule shall be prepared using the critical path method (CPM) format or Excel format. The schedule should include three (3) weeks ahead of the project. 1-22 Inspection Contractor's requirements with respect to “Inspection of Work” shall be in accordance with Section 5, "Control of Work," of the State Standard Specifications. The Engineer shall, always, have safe access to the work during its construction, and shall be furnished with every reasonable facility for ascertaining that the materials and the workmanship are in accordance with the requirements and intentions of these specifications, the special provisions and the plans. All work done and all materials furnished shall be subject to the Engineer’s inspection. The inspection of the work or materials shall not relieve the Contractor of any of the Contractor's obligations to fulfill the contract as prescribed. Work and materials not meeting the requirements shall be made good, and unsuitable work or materials may be rejected, notwithstanding that the work or materials have been previously inspected by the Engineer or that payment, therefore, has been included in a progress estimate. Projects financed in whole or in part with Federal funds shall always be subject to inspection by the Federal agency involved. 1-23 Modifications Any modifications to the Contract Documents shall be made in accordance with Section 4-1.05, "Changes and Extra Work," of the State Standard Specifications. 1-24 Requirements of Other Agencies Contractor shall be aware of and follow all applicable requirements of other agencies before proceeding with the Work. 1-25 Stormwater Management and Discharge Control 1.25A General - 12 - The Contractor shall abide by the latest version of the “National Pollutant Discharge Elimination system general permit for stormwater discharges associated with construction and land disturbance activities” for Alameda County. The intent of these requirements is to enforce Federal, State, and other local agencies regulations that prohibit stormwater pollution at construction sites. Storm drains discharge directly to creeks and the Bay without treatment, and, therefore, discharge of pollutants (i.e., any substance, material, or waste other than uncontaminated stormwater) into the storm drain system is strictly prohibited. In this section, the term "storm drain system" shall include stormwater conduits, storm drain inlets, and other storm drain structures, street gutters, channels, watercourses, and creeks. For the purpose of eliminating stormwater pollution, the Contractor shall implement effective control measures at construction sites. There are several publications which provide guidance on selecting and implementing effective control measures known as Best Management Practices (BMPs). BMPs include schedules of activities, prohibition of practices, general good housekeeping practices, operational practices, pollution prevention practices, maintenance procedures, and other management procedures to prevent the discharge of pollutants directly or indirectly to the storm drain system. BMPs also include the construction of some facilities, which may be required to prevent, control, and abate stormwater pollution. The reference publications are as follows: California Stormwater Best Management Practice Handbook - Industrial/Commercial California Stormwater Best Management Practice Handbook - Construction Activity These handbooks may be purchased from the California Stormwater Quality Association (CASQA). Their website address is: https://www.casqa.org/resources/bmp-handbooks The following flyers are available, free of charge, at the City of Pleasanton's Engineering Division at 200 Old Bernal Avenue, Pleasanton, CA 94566, as well as on the City’s website, http://www.cityofpleasantonca.gov. 1. General Construction and Site Supervision. 2. Fresh Concrete and Mortar Application. 3. Paint and Application of Solvents and Adhesives. 4. Heavy Equipment Operation. 5. Roadwork and Paving Activities Guidelines. 6. Building Maintenance and Remodeling Best Management Practices. 7. The Pour Right (Guidelines for Small, "Weekend" Concrete Jobs), Best Management Practices. 8. Bay Area Stormwater Management Agencies Association (BASMAA)/Alameda Countywide Clean Water Program Blueprint for a Clean Bay. The Contractor shall comply with all stormwater management and discharge control provisions contained in Chapter 9.14 of the City of Pleasanton Municipal Code. The Contractor shall comply with SWPPP when applicable to the project as defined in the latest version of NPDES general permit. 1-25B Material Storage Storage and exposure of raw materials, by-products, finished products, and containers shall be controlled as described in the following paragraphs. All construction materials shall be stored at least ten feet away from inlets, catch basins, and curb returns. The Contractor shall not allow any material to enter the storm drain system. At the end of each working day, the Contractor shall collect and dispose of all scrap, debris, and waste material. During wet weather or when rain is forecast, the Contractor shall shelter materials that can contaminate rainwater or be transported by stormwater or other runoff to the storm drain system. Shelter shall be provided by either storing potentially contaminating material inside a building or covering them with a tarp or other waterproof material secured with weighted tires or sandbags to prevent contact with rain. At the end of each working day or as directed by the Engineer, the Contractor shall clean and sweep roadways and on-site paved areas of all materials attributed to or involved in the Work. The Contractor shall not use water to flush down streets in place of street sweeping unless an approved storm drain protection system is in place. At the end of each working day, the Contractor shall collect all scrap, debris, and waste material and dispose of such materials properly. The Contractor is reminded that storage and disposal of all hazardous materials, such as paints, thinners, solvents, and fuels, and all hazardous wastes, such as waste oil, must meet all Federal, State and local laws, standards and requirements. The Contractor shall store all hazardous materials and all hazardous wastes in accordance with secondary containment regulations; it is recommended that these materials and wastes be covered, as needed, to avoid potential management of collected rainwater as a hazardous waste. - 13 - - 14 - The Contractor shall keep an accurate, up-to-date inventory, including Material Safety Data Sheets (MSDS), of hazardous materials and hazardous wastes stored on-site to assist emergency response personnel in the event of a hazardous materials incident. 1-25C De-watering Operations All groundwater removed from the trench must be desilted prior to discharging it into the storm drain system through filtering materials and methods meeting the Association of Bay Area Governments (ABAG) Standards for Erosion & Sediment Control Measures and/or through methods and procedures described in the California Stormwater Best Management Practice Handbook - Construction Activity (latest edition), or as defined in approved SWPPP. The Contractor shall reuse the water for other needs, such as dust control and irrigation, to the maximum extent practicable. 1-25D Pavement Saw Cutting Operations The Contractor shall be knowledgeable of and apply the most recent BMPs for pavement saw cutting operations. This shall include the installation and monitoring of water pollution control measures, cleanup, and disposal. Prior to beginning a saw cutting operation, the Contractor shall locate all storm drain inlets, culverts, and catch basins through which sediment discharges may flow to a waterway. The Contractor shall contain discharges from saw cutting to the immediate work area and minimize runoff of the resulting slurry to the maximum extent practicable. When slurry from a saw cutting operation is within access of a storm drain inlet, the Contractor shall use water pollution control measures that will effectively eliminate sediment discharges into the storm drain inlet. Such acceptable water pollution control measures shall include one or more of the following: 1. Sand/Gravel Bags Bags shall be made of burlap or woven polyester filled with sand and gravel. To ensure adequate filtering, the bags shall be filled with five parts sand and one part pea gravel. Other mixtures of materials may be used providing comparable or superior filtering is demonstrated. Sand/gravel bags shall be arranged in such a manner to surround the storm drain inlet and provide an adequate barrier in preventing any saw cutting slurry runoff from entering the inlet. Sand/gravel bags shall be stacked with overlap and tightly butted together. - 15 - Sand/gravel bags shall be stacked to the height of the closest adjacent curb or a minimum height of six (6) inches. 2. Inlet Filters Inlet filters shall completely cover the opening of the inlet and be properly installed according to the manufacturer's recommendations. 3. Drain Plugs or Covers Inlet devices shall be properly installed according to the manufacturer's recommendations. 4. Vacuum Cleaning Equipment Equipment shall be properly operated according to the manufacturer's recommendations. Sandbags shall be placed at appropriate locations to catch any residual sediment from escaping during the vacuum cleaning process and proceeding to downstream storm drain inlets. The Contractor shall monitor and ensure the effectiveness of the water pollution control measures for the duration of the saw cutting operation. Upon completion of the saw cutting operation, the Contractor shall remove all sediment and residue resulting from the saw cutting operation. Areas of cleanup and sediment removal include, but are not limited to, roadways, walkways, parking areas, and storm drain inlets and catch basins. The Contractor shall be responsible for transporting and disposing of the slurry runoff at a properly classified waste disposal site. 1-25E Pavement Operations The Contractor shall prevent the discharge of pollutants from paving operations by using measures to prevent run-on and run-off pollution, properly disposing of wastes, and implementing the following BMPs: 1. No paving during wet weather. 2. Store materials as required under Section 1-25B of these City Standard Specifications. 3. Cover inlets and manholes when applying asphalt, seal coat, tack coat, slurry seal, fog seal, etc. - 16 - 4. Place drip pans or absorbent materials under paving equipment when not in use. During wet weather, store contaminated paving equipment indoors or cover with tarp or other waterproof covering. 5. Sweep site daily to prevent sand, gravel, or excess asphalt from entering or being transported by rain into the storm drain system. 6. Keep ample supplies of drip pans or absorbent materials on-site. 7. If paving involves Portland Cement Concrete, refer to Section 1-25F of these City Standard Specifications. 1-25F Concrete Operations The Contractor shall prevent the discharge of pollutants from concrete operations by using measures to prevent run-on and run-off pollution, properly disposing of waste, and implementing the following BMPs: 1. Store all materials in waterproof containers or under cover away from drain inlets or drainage areas. 2. Avoid mixing excess amounts of Portland cement materials. 3. Do not wash out concrete trucks into storm drains, open ditches, streets, streams, planting areas, etc. Whenever possible, perform washout of concrete trucks off-site where discharge is controlled and not permitted to discharge to the storm drain system. For on-site washout: • Locate washout area at least fifty feet (50’) from storm drains, open ditches, or other water bodies, preferably in a dirt area. Do not allow runoff from this area by constructing a temporary pit or bermed area large enough for the liquid and solid waste. • Wash out concrete waste into a temporary lined pit where the concrete can set, be broken up, and then disposed of properly. If the volume of water is greater than what will allow concrete to set, allow the wash water to evaporate, if possible. Remove or vacuum the remaining silt and debris from the ponding or bermed area and dispose of it properly. 4. Collect and return sweepings from exposed aggregate concrete to a stockpile or dispose of the waste in trash container. 1-25G Grading and Excavation Operations The Contractor shall implement erosion and sedimentation control measures to prevent sediments or excavated material from entering the storm drain system. Refer to Section 5, "Erosion and Sediment Control," of these City Standard Specifications for related specific requirements. 1-25H Spill Prevention and Control The Contractor shall take all precautions to prevent accidental spills during the work under this contract. However, in the event of a spill: 1. The Contractor shall immediately contain and prevent leaks and spills from entering the storm drain system and properly clean up and dispose of the waste and clean up materials. If waste is hazardous, the Contractor shall comply with all Federal, State, and local hazardous waste requirements. 2. The Contractor shall not wash any spilled material into the streets, gutters, storm drains, or creeks. 3. The Contractor shall report any hazardous materials spill immediately to the Livermore-Pleasanton Fire Department, the Alameda County Hazardous Materials Division, and other State and local agencies as required by state and local regulations. 1-25I Vehicle/Equipment Cleaning, Fueling and Maintenance The Contractor shall not perform vehicle or equipment cleaning on-site or in the street using soaps, solvents, degreasers, steam cleaning equipment, or equivalent methods. The Contractor shall perform vehicle or equipment cleaning with water only in a designated, bermed area that will not allow rinse water to run off-site or into the storm drain system. The Contractor shall dispose of wash water from the cleaning of water-based paint equipment and tools to the sanitary sewer. If using oil-based paint, to the maximum extent practicable, the Contractor shall filter the paint thinner and solvents for reuse and dispose of the waste thinner and solvent, and sludge from cleaning of equipment and tools as hazardous waste. 1-25J Contractor Training and Awareness The Contractor shall train all employees on the water pollution prevention requirements contained in these Specifications. The Contractor shall inform all Subcontractors of the water pollution prevention contract requirements and include appropriate subcontract provisions to ensure that these requirements are met. 1-25K Good Housekeeping Practices The Contractor shall implement the following applicable good housekeeping practices: - 17 - 1. Use tarps on the ground to collect fallen debris or splatters that could contribute to stormwater pollution. 2. Secure opened bags of cement and of other light or powdered materials which can be transported by wind. 3. Pick up litter, construction debris, and other waste daily from outside areas, including the sidewalk area, gutter, street pavement, and storm drains impacted by the project. All waste shall be stored in covered containers or disposed of or recycled immediately. 4. Inspect vehicles and equipment arriving on-site for leaking fluids and promptly repair leaking vehicles and equipment. Use drip pans to catch leaks until repairs are made. 5. Avoid spills by handling materials carefully. Keep a stockpile of spill materials, such as rags and adsorbents, readily accessible on-site. Clean up all spills immediately to prevent any material from being discharged to the storm drain system. Refer to Section 1-25H of these City Standard Specifications. 6. Maintain and replace all sediment and water pollution control devices as necessary to ensure that said controls are working effectively (i.e., inspect all sediment ponds or sandbag sedimentation/filtering systems after each rain; remove accumulated sediment, and debris and replace or repair damaged sandbags immediately). 1-25L Payment Unless a separate pay item is provided in the bid schedule, the Contractor shall include in all bid items all costs incurred from these specified water pollution control requirements. 1-25M Enforcement The City has the authority, through various sections of the Pleasanton Municipal Code, to enforce any portion of this section. City enforcement may include, but is not limited to citations, orders to abate, bills for City cleanup costs and administration, civil suits, and criminal charges. Enforcement action by the City does not void or suspend any enforcement actions by other agencies. As a minimum, the Contractor shall implement the Urban Runoff Clean Water Program BMPs listed in Section 1-25A of these City Standard Specifications or implement equally effective alternatives approved by the Engineer on all projects within the City of Pleasanton. 1-26 Soils and Material Testing - 18 - In the case of City Projects, soil and material testing shall be performed by the Engineer. In the event of a failed test, to meet contract compliance, the Contractor shall pay for additional testing. Native soils and imported material (i.e., aggregate base) compaction tests shall be performed based on the ASTM D-1557 Modified Proctor Test. 1-27 Alameda County Fair (Fair & Rodeo Events) and School Zones The City restricts construction activity during the Alameda County Fair or any other major events within certain areas surrounding the fairground facilities. Prior to construction, the Contractor must contact the City as well as the Alameda County Fairgrounds to confirm schedule of events that may affect the project. The Contractor shall contact the Engineer to determine if work will be affected by this restriction. The Contractor shall notify the school’s principal if work is within 250 feet of a school zone. 1--28 Record Drawings Prior to the acceptance of Work and creation of the punch list, the Contractor shall provide the Engineer one (1) set of neatly and legibly marked Project Plans and one (1) copy of each of the electronic files of marked plans showing changes in the final location and depth of all underground utilities, subsurface drains, cross sectional street sections, and location of aboveground utility appurtenances. In addition, changes in the extent of asphalt paving, areas of lime treatment of subgrade, changes in concrete work, and street grade elevations and slopes shall be indicated. The marking of the drawings shall be kept current and made available to the Engineer upon request and at the time of the monthly pay estimate. Payment shall be withheld if the Record Drawings do not represent the current condition of the Work. Electronic files shall be submitted only in PDF or JPG format with a minimum 300 DPI resolution, on a portable thumb drive or uploaded to an FTP site where the files can be downloaded. 1--29 Overtime The regular working hours and days of the week of City Inspectors are 8:00 a.m. to 4:30 p.m., Monday through Friday excluding City holidays. If the Contractor needs to perform the Work outside of this time frame, then the Contractor shall submit a written request for scheduled overtime forty-eight (48) hours in advance. The Engineer's approval shall be required before overtime work begins. The Contractor and/or Developer may be held responsible for overtime cost incurred by the City of Pleasanton for after-hours operations. 1-30 Bonds The Contractor shall submit to the City within ten (10) working days after notice of award the following contract bonds: - 19 - 1. Faithful Performance Bond for one hundred percent (100%) of contract price 2. Labor and Material Bond for one hundred percent (100%) of contract price 3. Maintenance Bond for ten percent (10%) of contract price 4. Tree Bond For Private Development Projects: The project applicant/developer shall submit a refundable cash bond or surety bond for hazard and erosion control prior to approval of the final map or issuance of an Engineering permit, whichever occurs first. The amount of this bond will be determined by the Engineer. The cash bond will be retained by the City until all the permanent landscaping is installed for the development, including individual lots, unless otherwise approved by the Engineer. 1-31 Pre-construction Meeting For City Projects, following award of contract, submittal of executed contract, and approval of certificates of insurance and bonds, but before start of the Work, a pre-construction meeting shall be held at a mutually agreed time and place. For Private Development Projects, the pre-construction meeting shall be held following receipt of approved plans by Public Works Inspection. The Contractor shall contact public works inspection to setup a pre- construction meeting and shall allow a minimum of ten (10) days to coordinate the meeting. The conference shall be arranged by the City and attended by City representatives, including the Inspector, the Contractor, Contractor's superintendent, and major Subcontractors. The Contractor shall present at the conference the progress and submittal schedules, progress payment format, emergency phone numbers, and a trench shoring plan designed and signed by a registered Civil Engineer for trenches over five feet (5’) in depth. The purpose of the conference is to designate responsible personnel and establish a working relationship. Matters requiring coordination will be discussed and procedures for handling such matters established. 1-32 Project Identification Signs (PIS) A minimum of one Project Identification Sign (PIS) per City Standard Detail No. 603 shall be installed on every Capital Improvement Project. Location of PIS will be marked by the City. For projects with several locations with less than 5 working days at each location Contractor shall place sign on movable supports and relocate signs to active working areas on a weekly basis. Projects in duration less than nineteen (19) working days are exempt from PIS sign requirement unless noted otherwise. PIS shall be removed by Contractor within thirty (30) days after construction completion and turned over to the City. Contractor shall fill-in all project information required on PIS and submit it to City for approval prior to fabrication. - 20 - - 21 - 1-33 Measurement and Payment Measurement and payment for bid items are described in each respective section of these City Standard Specifications. Full compensation for Work not appearing as a specific bid item but required by the contract documents shall be considered as included in the contract unit price paid for the various items of work and no additional compensation will be allowed, therefore. The following language shall apply for each respective section of these City Standard Specifications: Payment for Work shall be made based on unit price bid according to the units of measure described in Subsection 4 of each section of these City Standard Specifications. Payment shall include full compensation for furnishing all materials, equipment, tools, and labor to complete the Work as required by the Contract Documents. 1-34 Enforcement The City has the authority, pursuant to the terms of the Contract, through various provisions of the Pleasanton Municipal Code, as well as in law and in equity, to enforce any portion of these Standards. City enforcement may include, but not be limited to a civil suit, administrative citation, order to stop work, and criminal charges. City enforcement actions are distinct and cumulative to any other right or remedy afforded by law or equity and may be exercised concurrently, independently, or successively. Any forbearance by the City in exercising any right or remedy will not be a waiver of the exercise of any such right or remedy. SECTION 2. TRAFFIC CONTROL 2-01 General This section covers traffic control for City and private development projects, including public convenience and safety, construction area traffic control devices, haul routes, traffic control plans, traffic control restrictions, and temporary pavement delineation. 2-01A Public Convenience and Safety The Contractor shall comply with Sections 7-1.03, "Public Convenience," and Section 7-1.04, "Public Safety," of the State Standard Specifications. Upon completion of each day’s work, the Contractor shall be responsible for leaving the work area free of hazards and shall provide all necessary temporary signs, warning devices and barricades at no additional cost to the City. Access is to be provided for all adjacent residences and businesses during non-construction hours. 2-01B Construction Area Traffic Control Devices The Contractor shall comply with flagging and traffic handling equipment and device requirements of Section 12, "Temporary Traffic Control," of the State Standard Specifications except for Section 12-1.04 “Payment.” The Contractor shall furnish and plan all barricades, arrow boards, lights, construction signs, no parking signs, and flagmen as necessary. The Contractor shall furnish to the Engineer for review and comment a construction signing plan, five (5) working days before construction begins. “No Parking” signs shall be furnished and installed by the Contractor a minimum of seventy- two (72) hours in advance of any work that requires parking to be temporary removed. The “No Parking” signs shall include the time and the day the work is to be performed. It shall indicate that any vehicles in violation of the “No Parking” signs will be towed in accordance with the California Vehicle Code, and shall be posted conspicuously in adequate quantities to sufficiently notify the public. The Contractor shall post “No Parking” signs no later than noon the Thursday prior to a Monday “No Parking” request. If identified on plans or special conditions, the Contractor shall supply Changeable Message Sign/s (CMS). The CMS shall be delivered and be in operation at least seven (7) days for residential and collector streets and fourteen (14) days for arterial streets in advance of the start of work and shall be maintained in continuous operation until completion of the project. The Contractor shall modify the message on the CMS devices to convey accurate messages. The City reserves the right to direct the Contractor to relocate locations of CMS devices at no additional cost to the City. Non-functioning CMS signs shall be replaced within twenty-four (24) hours of notification. CMS signs shall be removed within forty-eight (48) hours after notification of removal. - 22 - Contractor shall be responsible for notifying each resident and business in writing, seventy- two (72) hours and seven (7) days in advance of any street closure, including notification of any resident/business on adjacent streets directly affected by the closure of the main street. Contractors shall not be permitted to work on any roadways that have not been adequately posted seventy-two (72) hours prior to the beginning of work. As an example, if the Contractor skips a roadway that was previously signed and scheduled for slurry seal, the Contractor shall reschedule the missed roadway in such a manner that a new seventy-two (72) hour advance notification is achieved prior to the beginning of the work. Traffic control devices that are necessary for overnight lane restrictions shall meet the latest requirements of the MUTCD and shall, at a minimum, have a lighted barricade at the beginning of the closure/work zone. The Contractor shall be responsible for maintenance of all traffic control devices that are required by the Traffic Control Plan. The Contractor shall ensure that all devices are always maintained in the proper location including holidays, overnight, and on weekends. Should it become necessary to use City forces to maintain the traffic control devices, the Contractor will be billed at the overtime rate for two (2) technicians and a vehicle, with a minimum of two (2) hours per incident/call. 2-01C Haul Route The haul route shall be determined for each project by the Engineer and shown on the Project plans or in the conditions of approval. For private development projects, the Contractor shall submit a haul-route plan for approval by the Engineer prior to obtaining an encroachment permit. The plan shall include routing, the daily number and size of trucks, and the duration of trucking. The plan shall address the stacking/temporary parking of trucks. A separate oversized load permit shall be obtained from the City, if applicable. 2-01D Traffic Control Plan The Contractor shall provide the Engineer with a traffic control plan (TCP) with a schedule for each phase of the Work in accordance with the latest edition of California Manual on Uniform Traffic Control Devices and Caltrans Standard Plans. The Contractor shall not start the Work until the TCP has been reviewed and commented on by the City Traffic Engineer. The Contractor shall allow for at least five (5) working days for the Engineer to review and comment on the TCP. If, after the Engineer's review and comment on the TCP, the Engineer finds no reason to object to the TCP, the Contractor shall proceed with the Work in accordance with the TCP. Plans shall be prepared by qualified professional (Traffic Engineers or by Traffic Control Specialists). Any revisions required shall be resubmitted prior to commencing work. The Contractor shall allow five (5) working days for the Engineer to review any resubmittals. The Contractor will - 23 - not be entitled to claim any delays in the project schedule or be entitled to any additional days to the duration of the contract due to the review and resubmittal process. Contractor to provide pedestrian/ADA access plan (including bike lanes) for various construction phases. No demolition work for pedestrian access is to be initiated until a pedestrian plan is approved and all detour measures are in place and operational. 2-01E Traffic Control Restrictions The following traffic control restrictions listed are a minimum requirement and may be modified by the Engineer or the conditions of approval on a project-by-project basis. No work shall be allowed in signalized intersections between the hours of 7:00 a.m. to 9:00 a.m. and 4:00 p.m. to 6:00 p.m. unless specifically approved by the Engineer. Additional conditions may be placed on working hours in certain locations, dependent upon specific activities in the area (e.g., downtown, school areas, events at the County Fairgrounds, etc.) at the discretion of the Engineer. These conditions shall be included in the project Special Provisions. Work within five hundred (500) feet of schools when school is in session that requires the closure of lane(s) shall be completed between school bell schedules. Contractor shall check the Pleasanton Unified School District website for the applicable bell schedule. The Contractor shall give the Engineer at least forty-eight (48) hours’ notice for requests to alter timing of signalized intersections. The full width of the travel way shall be open for use by the public on Saturdays, Sundays, and legal holidays and when construction operations are not actively in progress. At least one lane of through traffic for each direction shall be always provided unless otherwise approved in the project’s Special Provisions. Access to bicycle and pedestrian facilities shall be always provided unless otherwise approved in the Special Provisions. The Contractor shall cooperate with local authorities relative to handling traffic through the working area and shall make arrangements relative to keeping the working area clear of parked vehicles. The Contractor shall be responsible for notifying business establishments, each resident, Livermore Amador Valley Transit Authority (LAVTA), Pleasanton Garbage Service, the Pleasanton Post Office, the Pleasanton Unified School District, and any other agencies identified by the City of Pleasanton forty-eight (48) hours prior to the commencement of work. Prior to commencing work, the Contractor shall submit a proposed schedule of work for approval by the Engineer. - 24 - 2-01F Temporary Pavement Delineation Whenever the work causes obliteration of pavement delineation, temporary pavement delineation shall be in place prior to opening the traveled way to public traffic. Lane line, centerline, and limit line (i.e., stop bars and crosswalks) pavement delineation shall be always provided for traveled ways open to public traffic. All Work necessary, including any required lines or marks, to establish the alignment of temporary pavement delineation shall be performed by the Contractor. Surfaces to receive temporary pavement delineation shall be dry and free of dirt and loose material. Temporary pavement delineation shall not be applied over existing pavement delineation or other temporary pavement delineation. Temporary pavement delineation shall be maintained until superseded or replaced with a new pattern of temporary pavement delineation or permanent pavement delineation. Temporary pavement markers and removable traffic type tape which conflicts with a new traffic pattern, or which is applied to the final layer of surfacing or existing pavement to remain in place, shall be removed when no longer required for the direction of public traffic, as determined by the Engineer. Whenever lane lines and centerlines are obliterated, the minimum lane line and centerline delineation to be provided shall be temporary reflective raised pavement markers placed at longitudinal intervals of not more than twenty-four feet (24’). The temporary reflective raised pavement markers shall be the same color as the lane line or centerline the markers replaced. Temporary reflective raised pavement markers shall be placed in accordance with the manufacturer's instructions and shall be cemented to the surfacing with the adhesive recommended by the manufacturer, except epoxy adhesive shall not be used to place pavement markers in areas where removal of the markers will be required. Temporary lane line or centerline delineation consisting entirely of temporary reflective raised pavement markers placed on longitudinal intervals of not more than twenty-four feet (24’) shall be used on lanes opened to public traffic for a maximum of fourteen (14) days. Prior to the end of the fourteen (14) days, permanent pavement delineation shall be placed. If the permanent pavement delineation is not placed within fourteen (14) days, the Contractor shall provide, at the Contractor's expense, additional temporary pavement delineation. The Contractor will be required to refresh the temporary pavement delineation when directed by the Engineer due to inclement weather or traffic volume conditions, if less than the already required fourteen-day (14) period. The additional temporary pavement delineation to be provided shall be equivalent to the pattern specified for the permanent pavement delineation for the area, as determined by the Engineer. Pedestrian crosswalks and stop bars shall be installed in four-inch (4”) temporary white paint or removable traffic tape upon approval of Engineer, at all arterial streets and near all high traffic areas such as schools, elderly care facilities, business, hospitals, etc. - 25 - - 26 - 2-02 Materials Temporary reflective raised pavement markers shall be the following or equal: • FOL Tape, LLC, Flex-O-Line Pavement Marking Tape – Metallic Backing • Bunzl Extrusion Tacoma, Inc., T.O.M., Type W-1 or W-2 or Type Y-1 or Y-2, or Grade WZ • Temporary 4” removable traffic striping (Upon Engineer Approval) • FOL Tape, LLC, Flex-O-Line Pavement Marking Tape – Metallic Backing 2-03 Construction - Not Included 2-04 Measurement Traffic control shall be measured on a lump sum basis if included on the bid form. CMS signs shall be measured on each basis if included on the bid form. 2-05 Payment The contract price for traffic control shall include full compensation for doing all the Work involved in designing, furnishing, placing, removing, storing, maintaining, temporarily relocating, replacing and disposing of the components of the traffic control system. The Contractor shall bear all costs in compliance with the approved traffic control plan, including costs for flagging operations. The contract price for CMS signs shall include full compensation for doing all the Work involved in the placement, maintaining, relocating, and removal of the CMS sign. SECTION 3. CLEARING AND GRUBBING 3-01 General Clearing and grubbing shall consist of removing vegetation growth and deleterious materials, such as designated trees, stumps, roots of down trees, brush, grass, weeds, rocks, concrete, curb, gutter, sidewalk and driveway, and asphalt concrete pavement and all other objectionable material (material that interferes with or impedes construction) to a depth of eighteen inches (18") defined herein and from within the limits of the project as defined in the Project Plans and Special Provisions. All clearing and grubbing shall conform to the applicable requirements of Section 17, “Clearing and Grubbing”, of State Standard Specifications. The Contractor shall protect from damage all improvements and facilities which are to remain. Any such improvements which are damaged as a result of the Contractor's operations shall be replaced as directed by the Engineer at the Contractor's expense. 3-02 Materials Reference City Standard Details for specified materials. 3-03 Construction 3-03A Burning and Blasting No burning or blasting of material by the Contractor shall be allowed. 3-03B Extent of Work Objectionable material as defined in Section 3-01 General, considered greater than six inches (6”) in length or diameter shall be removed to a minimum depth of eighteen inches (18") below subgrade within the entire street, easement right of way area and from within the limits of the project. All concrete and asphalt shall be sawcut at conform lines. 3-03C Temporary Relocation of Signs and Street Furniture Existing warning, regulatory and guide signs, mailboxes, and street furniture shall be temporarily relocated if necessary. All signs and sign poles removed by the Contractor shall be stored in a location designated by the Engineer. If necessary for public safety or directed by the Engineer, removed signs shall be temporarily installed until a permanent location and installation is determined. All mailboxes shall be installed temporarily and coordinated with the Postmaster prior to the relocation to ensure continued mail service. 3-03D Wells, Tanks, and Basements - 27 - - 28 - All wells shown on the Project Plans shall be abandoned or sealed according to Zone 7, Water Agency requirements prior to the start of grading. All tanks and basements encountered shall be removed in their entirety to native soil. All rubble from tank and basement removal shall be properly disposed at a designed landfill site. 3-03E Demolition Permit A demolition permit shall be acquired by the Contractor from the City’s Building and Safety Division prior to demolition of any building structures on the project site. A SWPPP shall be provided as part of obtaining a demolition permit on a project disturbing one acre or more. All concrete and/or asphalt in excessive of five (5) cubic yards or more shall be recycled. 3-03F Protection of Existing Trees Only those trees that are specifically designated on the Project Plans for removal shall be removed. All other remaining trees shall be protected by the Contractor against injury from construction activities. Prior to the commencement of construction, the Contractor shall install a sturdy fence at the dripline of any tree which will be affected by the construction and prohibit scarification of the ground surface or any storage of construction materials or other materials inside the fence. The dripline shall not be altered in any way to increase the encroachment of the construction. The Contractor shall be responsible for providing temporary irrigation to the protected trees. Pruning shall only be performed by a certified arborist at the Contractor's expense to the minimum extent necessary as directed by the Engineer and agreed to by the project’s Arborist. All cuts shall be made using a sharp blade with cuts perpendicular to the root or branch using ISA approved methods. Tools shall be disinfected between cuts. Refer to the Pleasanton Municipal Code Chapter 17.16, Tree Preservation, for tree protection requirements. The following protection measures shall be practiced during the course of construction. These measures may be modified or eliminated by the Engineer if it is determined that they do not apply to the specific situation or are contrary to the design intent of the project. Exemption of any one or part of the listed measures shall be confirmed in writing and in any event shall not release the Contractor of the obligation to take whatever measures are necessary to protect those trees not designated to be removed. 1. Prior to the commencement of construction, install a sturdy fence at the dripline of any tree which will be affected by the construction and prohibit any storage of construction materials or other materials inside the fence. The dripline shall not be altered in any way to increase the encroachment of the construction. 2. Excavation, grading, drainage and leveling within the dripline of the tree in prohibited unless approved by the Engineer. 3. Disposal or depositing of oil, gasoline, chemicals or other harmful materials within the dripline or in drainage channels, swales or areas that may lead to the dripline is prohibited. 4. The attachment of wires, signs and ropes to any tree that shall remain is prohibited. 5. Design utility services and irrigation lines to be located outside of the dripline when feasible. 6. Retain the services of a certified consulting arborist for periodic monitoring of the project site and the health of those trees to be preserved. The certified consulting arborist shall be present whenever activities occur which pose a potential threat to the health of the trees to be preserved (for example, when work occurs within the dripline of trees to be preserved). 7. The Engineer shall be notified of any damage that occurs to a tree during construction so that proper treatment may be administered. 3-03G Spoil Area and Off-Haul The spoil areas shall only be used for the purpose of temporarily stockpiling objectionable material on site before transfer to a permanent disposal site. All materials removed from the project site shall be properly disposed of in accordance with Section 17-2.03D, “Disposal of Materials” of the State Standard Specifications. All materials from within the City’s right of way or property shall have the stockpile tested for hazardous materials prior to removal from site. A minimum of one test for every five hundred (500) cubic yards. 3-03H Utility Abandonment Utility pipes less than or equal to six inches (6") in diameter to be abandoned shall be sealed with concrete for a length no less than two feet (2’) unless otherwise shown on the Project Plans. Abandoned irrigation pipes six inches (6”) in diameter and smaller are not required to be sealed with concrete. (See Sections 14-03I and 13-03M for Water and Sewer Abandonment provisions). Abandoned utility pipes greater than six inches (6") in diameter shall be grout-injected for entire volume and valves removed unless otherwise shown on the Project Plans. Abandoned irrigation pipes greater than six inches (6”) in diameter shall be grout injected for a length not less than two feet (2’) unless otherwise shown on the Project Plans. 3-03I Archaeological Finds For City Projects: If, during work, archaeological artifacts are encountered, all work in the immediate area of the find shall be discontinued. The City shall acquire the services of an archaeologist to determine the nature of the find. Only after a preservation plan has been initiated shall the Contractor proceed with the Work. - 29 - - 30 - For Private Development Projects: If an archaeological deposit is encountered, all soils disturbing activities in the vicinity of the deposit shall cease and the City shall be immediately notified. The Project Developer shall retain the services of a qualified archaeological consultant having expertise in California prehistoric archaeology. The archaeological consultant shall determine if the planned development could potentially impact important archaeological resources and shall then design an appropriate archaeological monitoring program. Upon completing the archaeological monitoring program, the archaeological consultant shall submit a written report of findings to the Engineer. At a minimum, the archaeological monitoring program shall include the following: 1. An archaeological monitor shall be on site during any further soils disturbing activities. 2. The archaeological consultant shall advise all project Contractors to be on the alert for evidence of expected resources, of how to identify the evidence of the expected resources, and of the appropriate protocol in the event of discovering an archaeological resource. 3. The archaeological monitor shall be present on site until the City Engineer, in consultation with the archaeological consultant, determines that project construction activities could have no effects on significant archaeological resources. 4. The archaeological monitor shall record and be authorized to collect soil samples and artifactual/ecofactual material as warranted for analysis. 5. The Project Developer shall empower the archaeological monitor to temporarily redirect demolition/excavation/construction crews and heavy equipment until the resource is evaluated. The archaeological consultant shall immediately notify the City Engineer of the encountered resources. 6. The Project Developer shall consult with City and tribal representatives to determine the appropriate disposition of findings. Mitigation measures shall include one of the three alternatives below: o In-Situ Preservation: The Project Developer shall preserve artifacts and resources as found and shall apply suitable open space, capping, or monumentation to the site. The Project Developer shall alter development plans to accommodate this alternative, as necessary. o Excavation/Recovery: The archaeological consultant shall excavate the site, evaluate the site for historical references, recover artifacts as appropriate, and cover the site to preserve remaining artifacts. The Project Developer shall - 31 - maintain sufficient buffering between development subsurface construction and the location of resources. o Excavation/Removal: The archaeological consultant shall excavate and recover the cultural resources as described above and remove artifacts as necessary. The archaeological consultant shall prepare an Archaeological Data Recovery Plan that shall be submitted to the Engineer for review and approval. If human remains are discovered, the Project Developer shall contact the County Coroner immediately. If the coroner determines that the human remains are Native American remains, the Project Developer shall notify the California State Native American Heritage Commission. The archaeological consultant shall prepare a Final Archaeological Resources Report, meeting City and state standards, evaluating the historical importance of the archaeological resource, and describing the archaeological and historical research methods employed in the testing, monitoring, and data recovery programs. The City Engineer shall review and approve this document. The Project Developer shall file the report with appropriate state offices. 3-04 Measurement Clearing and grubbing shall be measured on a lump sum basis. Trees less than six inches (6”) in diameter as measured four and half feet (4.5’) from the ground that shall be removed, including stump grinding to one foot (1’) below grade shall be included in the clearing and grubbing bid item. All stump grindings shall be legally disposed of off-site, and the holes filled with native soil or approved import topsoil. Tree Protection shall be measured on a lump sum basis. Tree removal shall be measured by each location and includes stump and root removal. 3-05 Payment The lump sum price paid for clearing and grubbing shall include full compensation for excavation, removal, disposal, saw cutting, protection of existing improvements to remain, and obtaining all applicable permits and associated costs, including City of Pleasanton permits. - 32 - The lump sum price paid for Tree Protection shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in tree protection, complete in place. The contract price paid for Tree Removal shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in tree removal, complete in place. SECTION 4. ROADWORK EXCAVATION AND GRADING 4-01 General Roadwork excavation and grading shall consist of performing all operations necessary to excavate all materials, regardless of character and subsurface conditions, from the roadway prism or adjacent thereto including grading of sidewalk, driveway and conform areas, and other work items as described in Section 19-1, "General," and Section 19-2, "Roadway Excavation," of the State Standard Specifications. Contractor shall comply with Section 19, "Earthwork," of the State Standard Specifications except as modified by the Special Provisions and Project Plans and these City Standard Specifications. For cases when required by the Engineer, this section also covers lime stabilization of subbase/basement material within the roadway prism. 4-02 Materials 4-02A Subbase/Basement Material Subbase/basement material is defined as that material in excavation or embankment under the lowest layer to be placed. The subbase/basement material shall meet all the conditions of acceptability as specified in Section 19-1.03B, "Unsuitable Material," of the State Standard Specifications. 4-02B Borrow-Import Borrow-import shall be defined as materials which are obtained from sources outside the project site. Such materials shall comply with Section 19-7.02C, "Imported Borrow," of the State Standard Specifications and shall be subject to approval by Engineer before use. Only in the case when all selected materials have been depleted from the project site shall borrow- import be used for roadway fill. Testing Requirements: Borrow-Import material shall be tested every five thousand (5,000) cyds or change of material type subject to City Engineer review. Material shall be tested for soil classification, corrosivity, contaminants and plasticity index. Borrow-Import fill shall be tested per ASTM D2487 for soil classification. Contaminants shall be per California DTSC recommendations, (Reference: “Information Advisory Clean Imported Fill Material per State of California, California EPA, Department of Toxic Substances Control”) and screened per Tier 1 ESLs for soil. (Reference latest “SF Bay Regional Water Quality Control Board, Tier 1 ESLs”) Borrow-Import fill shall have Plasticity Index of 15 or less (per ASTM D4318), or Expansion Index of less than 20 (per ASTM D4829). - 33 - Borrow-Import fill shall not have higher corrosivity than onsite material. 4-02C Selected Materials Selected materials shall be defined as materials which are excavated from the project site and which are satisfactory for use in fills, embankments, backfill or other uses as directed. Such material shall be suitable for compaction, have no cemented lumps or rock larger than three inches (3") measured in any direction, shall be free of topsoil, organic, and other deleterious materials and shall be approved by the Engineer. Selected material shall be used as specified in Section 19-2.03D, "Selected Material," of the State Standard Specifications. On-site select materials utilized on City property shall be tested per section 4-02B. 4-02D Lime Lime used for subbase/basement material stabilization shall conform to the requirements of Section 24-1.02 "Materials," of the State Standard Specifications. Lime may only be used upon approval of City Engineer. 4-02E Concrete Concrete used for subbase/basement material stabilization shall conform to the requirements of Section 90-1.02B of the State Standard Specifications. 4-02F Stabilization Fabric A woven geotextile composed of polypropylene fibers, which are woven into a stable network such that the fibers retain their relative position. Shall be inert to biological degradation and resist naturally encountered chemicals, alkalis, and acids. Meet AASHTO M288 Strength Class 3 for Elongation < 50%. 4-03 Construction 4-03A Roadway Excavation and Grading Procedures Roadway excavation shall conform to the provisions of Section 19-2, "Roadway Excavation," of the State Standard Specifications. Roadway excavation shall consist of all excavation involved in grading and construction of the roadway, including grading of sidewalk, driveway, and conform areas. When directed by the Engineer, the Contractor shall excavate unsuitable subbase/basement material. The resulting voids shall be filled with either select materials or aggregate base material as specified in the Special Provisions. The use of fabric for basement stabilization shall only be considered after all other alternatives have been implemented and upon approval of the Engineer. - 34 - All material removed and surplus excavated material shall become the property of the Contractor. All select materials or aggregate base used to replace subbase/basement material shall be compacted to a minimum of ninety-five percent (95%) at a moisture content of within + two percent (+2%) to within six inches (6") directly below the grading plane for the full width of the roadbed between and including curbs. The minimum compaction requirement under sidewalks shall be ninety two percent (92%). No material shall be placed above any layer of prepared subbase/basement material that does not meet the relative compaction requirements, is firm and un-yielding as checked with a full water truck in presence of Engineer and until the subbase/basement material has been approved by the Engineer. Immediately prior to placing subsequent layers of materials thereon, the grading plane shall conform to Section 19-1.03C, "Grade Tolerance," of the State Standard Specifications. 4-03B Ditch Excavation Ditch excavation shall be in conformance with Section 19-2.03H "Ditch Excavation," of the State Standard Specifications. An excavation with a bottom width of less than twelve feet (12’) shall be classified as ditch excavation. 4-03C Embankment Embankment construction shall be in conformance with Section 19-6, "Embankment Construction," of the State Standard Specifications. Embankment construction shall include the construction of roadway embankments, including preparation of the areas upon which they are to be placed; the construction of any temporary surcharge embankment above the grading plane; the construction of dikes within or outside of the right of way; the placing and compacting of approved material within roadway areas where unsuitable material has been removed; and the placing and compacting of embankment material in holes, pits, and other depressions within the roadway area. 4-03D Utility Protection The Contractor shall be responsible for the protection of all existing pipelines, manholes, catch basins, valve boxes, and other utility structures that are to remain within the excavation work area. Any such utility facilities that are damaged from roadway excavation work performed by the Contractor shall be either repaired or replaced to the satisfaction of the Engineer at no cost to the City in accordance with Section 1-06, "Protection of Existing Utilities and Property," of these City Standard Specifications. 4-03E Finishing Roadway - 35 - Finishing roadway work shall conform to the provisions of Section 22, "Finishing Roadway," of the State Standard Specifications. 4-03F Watering Watering shall be in conformance with Section 10-6, "Watering," of the State Standard Specifications and Section 1-09, "Dust Control," of these City Standard Specifications. 4-03G Lime Stabilization Lime stabilization of subbase/basement material shall conform to Section 24-2, "Lime Stabilized Soil," of the State Standard Specifications. 4-03H Concrete Stabilization Concrete stabilization of subbase/basement material shall conform to Section 24-3, "Concrete Stabilized Soil," of the State Standard Specifications. 4-04 Measurement Roadway excavation and grading, excluding lime/concrete stabilization, shall be measured on a lump sum basis. Lime/concrete stabilization of subbase/basement material, if required by the Special Provisions and Project Plans, shall be measured by the square foot. Removal of unsuitable materials as directed by the Engineer shall be measured on a per cubic yard basis and include over-excavation, haul away of spoil materials, and compaction of selected materials filling the voids. 4-05 Payment The contract price for roadway excavation and grading shall include full compensation for excavation, removal and disposal of unsuitable and or surplus subbase/basement material, and placement of select material in resulting voids; testing of materials; grading of the roadway prism; watering; compaction of subbase/basement material; grading conform cut; and finishing roadway work and testing. The contract price for lime/concrete stabilization of subbase/basement material shall include full compensation for preparing material and spreading and mixing lime/concrete. Payment for compacting lime-stabilized subbase/basement material shall be included in the contract price for roadway excavation and grading. Over -excavation of unsuitable material and replacement with suitable material shall be on a per -cubic -yard basis and include removal and disposal of unsuitable material and the replacement and compaction of suitable material as directed by the Engineer. - 36 - SECTION 5. EROSION AND SEDIMENTATION CONTROL 5-01 General The Contractor shall implement erosion and sedimentation control measures to prevent sediments or excavated material from entering the storm drain system and/or leaving the site. A SWPPP shall be implemented for all sites that disturb one (1) acre or more in conformance with the latest NPDES regional permit. The erosion and sedimentation control materials and methods shall be in accordance with the "Erosion and Sediment Control Field Manual," by the California Regional Water Quality Control (latest edition), and the "Manual of Standards for Erosion & Sediment Control Measures," by ABAG (latest edition). In case of conflicting information or requirements between these two manuals, the California Regional Water Quality Control Manual shall prevail. A specific erosion and sedimentation control plan shall be developed for every project. Work shall not proceed until the Engineer has approved the project-specific erosion and sedimentation control plan. Types of erosion and sedimentation control measures that may be required include but are not limited to: preservation of existing vegetation; temporary seeding and planting; permanent seeding and mulching; mulching; soil stabilizers; geotextiles, mats/plastic covers, and erosion control blankets; temporary stream crossings; stabilized construction entrances; entrance/outlet tire washes; check dams; slope roughening/terracing/rounding; silt fences; straw bale barriers; sandbag barriers; straw wattles; brush or rock filters; storm drain inlet protection; sediment basins; and sediment traps. At a minimum, the Contractor shall install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlets located in and downstream of the project site between October 15 through April 15 and/or, when rain is forecast, within twenty-four (24) hours. The Contractor shall install filter materials or seal all surface inlet openings during the dry season if there is potential for sediment or excavated material to be discharged to the storm drain system during the construction operation (e.g., sediments and debris tracked by construction vehicles, windblown, or transported by other runoff). The storm drain inlets shall be sealed in such a manner that they can be opened in an emergency and unblocked at the end of each working day so that no property is damaged as a result of accidents or other overflows. Contractors shall always prevent erosion of materials by wind. Sedimentation and erosion control/filter materials shall be placed in a manner that will retain any debris or sediment from flowing into the storm drain system and/or off site. Such materials or control devices shall also be maintained and/or replaced as necessary to ensure effective sediment control and to prevent flooding. The Contractor shall be responsible for monitoring and update erosion control plans to accommodate phased construction and as necessary, modify plans to fit existing conditions. - 37 - - 38 - Changes in plans will require City review and approval. 5-02 Not Included 5-03 Not Included 5-04 Measurement Erosion and sedimentation control shall not be a measured item unless specified in the Special Provisions. 5-05 Payment Full compensation for erosion and sedimentation control shall be considered as included in the contract unit price paid for the various items of work and no additional compensation will, therefore, be allowed. SECTION 6. AGGREGATE SUBBASE 6-01- General Aggregate subbase shall conform to the provisions of Section 25, "Aggregate Subbases," of the State Standard Specifications, and to these City Standard Specifications. 6-02 - Materials 6-02A - Aggregate Subbase Aggregate subbase shall be Class 2 and shall conform to the grading and quality requirements as specified in Section 25-1.02, "Materials," of the State Standard Specifications. Aggregate subbase exceeding workable moisture content will be rejected by the Engineer and shall be immediately removed from the project site by the Contractor. 6-03 - Construction 6-03A - Spreading and Compaction Aggregate subbase shall be spread in accordance with the provisions of Section 25-1.03D, "Spreading," and Section 25-1.03E, "Compacting," of the State Standard Specifications. Spreading and compacting shall be performed by methods that will produce a uniform subbase, firmly compacted and free from pockets of coarse or fine material. No spreading operation shall begin until the physical characteristics of aggregate subbase and
What's in the CESSNA 150 G5 TCDS
A Type Certificate Data Sheet (TCDS) is the FAA's record of what an aircraft type was approved as. It is the source of truth for weights, seating, fuel and the rules the design was certified against. Expand any line to see what it means.
3,640 CESSNA 150 G5 parts for sale
See all →





Parts listed for sale by vetted eBay sellers — confirmed on eBay at checkout.










